# 772101518305
Unscheduled inspection
Start date: 2021-12-28, end date: 2021-12-30, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772101423372
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101372235
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101423244
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101417293
Unscheduled inspection
Start date: 2021-12-03, end date: 2021-12-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101381687
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101492589
Unscheduled inspection
Start date: 2021-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101253539
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101325858
Unscheduled inspection
Start date: 2021-11-17, end date: 2021-11-19, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101189138
Unscheduled inspection
Start date: 2021-10-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101062823
Unscheduled inspection
Start date: 2021-10-04, end date: 2021-10-06, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the prescription issued by Mosgosstroynadzor compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction, reconstruction of facilities capital construction, established by the rules of land use and development, documentation on the layout of the territory, and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 772100913425
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101204266
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100686167
Unscheduled inspection
Start date: 2021-09-14, end date: 2021-09-17, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100621335
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100611966
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100610215
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100791689
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100447273
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100431881
Unscheduled inspection
Start date: 2021-08-10, end date: 2021-08-13, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100551756
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100424067
Unscheduled inspection
Start date: 2021-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100350967
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100398856
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100386071
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100335302
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100332744
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100333853
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100333854
Unscheduled inspection
Start date: 2021-07-06, end date: 2021-08-02, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100324319
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100344550
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100379321
Unscheduled inspection
Start date: 2021-07-27, end date: 2021-08-23, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100364194
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100367018
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100293379
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-07-15, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100226491
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100222695
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-31, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100216828
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-31, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100166592
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100234501
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100196589
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100224771
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100222692
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-05-21, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100226006
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-27, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100226488
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-06-18, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100226495
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100224429
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-31, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100240601
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100120730
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100120731
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-05-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100097749
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-11, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100172218
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-24, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100170691
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-24, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100035743
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-04-13, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu: zaschity prav i interesov rabotnikov, v svyazi s postupleniem v Inspekciyu obrascheniya ot 15.02.2021 g. № 77/7-4301-21-OB po voprosam nevyplaty zarabotnoi platy, rascheta pri uvolnenii, nevydachi trudovoi knizhki.
Zadachami proverki yavlyayutsya: nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov, soderzhaschih normy trudovogo prava.
Predmetom nastoyaschei proverki yavlyaetsya: - soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami; - sootvetstvie svedenii, soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti, obyazatelnym trebovaniyam; - sootvetstvie svedenii. soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa, specialnogo razresheniya (licenzii), vydachi razresheniya (soglasovaniya) obyazatelnym trebovaniyam, a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah, soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah; - vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora), organov municipalnogo kontrolya; - provedenie meropriyatii; - po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede, obektam kulturnogo naslediya (pamyatnikam istorii i kultury) narodov Rossiiskoi Federacii, muzeinym predmetam i muzeinym kollekciyam, vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii, dokumentam, imeyuschim osoboe istoricheskoe znachenie, nauchnoe, kulturnoe znachenie, vhodyaschim v sostav nacionalnogo bibliotechnogo fonda; - po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; - po obespecheniyu bezopasnosti gosudarstva; - po likvidacii posledstvii prichineniya takogo vreda.
# 772100057301
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-17, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100050339
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-04-06, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: to carry out control measures in connection with the receipt of the developer's (customer's) notification; The objectives of the audit: to prevent, identify and suppress violations of the requirements of project documentation and legislation on urban development by the person being audited; The subject of the audit: to verify the elimination of violations specified in the order issued by Mosgosstroynadzor, the conformity of work performed and the construction materials used in the process construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision.
# 772100026450
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-04-06, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100050796
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-04-06, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: to carry out control measures in connection with the receipt of the developer's (customer's) notification; The objectives of the audit: to prevent, identify and suppress violations of the requirements of project documentation and legislation on urban development by the person being audited; The subject of the audit: to verify the elimination of violations specified in the order issued by Mosgosstroynadzor, the conformity of work performed and the construction materials used in the process construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision.
# 772100032797
Unscheduled inspection
Start date: 2021-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105297663
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105342064
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 772105310527
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105310523
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: to carry out control measures in connection with the receipt of the developer's (customer's) notification; The objectives of the audit: to prevent, identify and suppress violations of the requirements of project documentation and legislation on urban development by the person being audited; The subject of the audit: to verify the elimination of violations specified in the order issued by Mosgosstroynadzor, the conformity of work performed and the construction materials used in the process construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision.
# 772105297813
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105297807
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105319856
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-02-20, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100052448
Unscheduled inspection
Start date: 2021-01-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005268407
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 772005271485
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005287145
Unscheduled inspection
Start date: 2020-12-24, end date: 2021-01-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu zaschity prav i interesov rabotnikov ustanovlenie fakta ispolneniya neispolneniya Predpisaniya ob ustranenii vyyavlennyh narushenii 7773212320OB1236998I181274 ot 12112020 g vydannogo Gosudarstvennoi inspekciei truda v gorode Moskve Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda
# 772005285171
Unscheduled inspection
Start date: 2020-12-24, end date: 2021-01-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu zaschity prav i interesov rabotnikov ustanovlenie fakta ispolneniya neispolneniya predpisaniya ob ustranenii vyyavlennyh narushenii 7773136020OB1234524I181274 ot 30102020 vydannogo GIT v gorode Moskve Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda
# 772005257145
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005237261
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005250293
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005250289
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005150704
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005186970
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004502544
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004465823
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004490006
Unscheduled inspection
Start date: 2020-08-18, end date: 2020-08-31, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 772004521285
Unscheduled inspection
Start date: 2020-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004465477
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004447099
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004444677
Unscheduled inspection
Start date: 2020-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004462103
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-18, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004444435
Unscheduled inspection
Start date: 2020-06-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004434133
Unscheduled inspection
Start date: 2020-06-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004418590
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004412854
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-06-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004412852
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004412845
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004375625
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004328426
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004385738
Unscheduled inspection
Start date: 2020-03-31, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004340194
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004340176
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004371446
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004260972
Unscheduled inspection
Start date: 2020-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004289709
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004289687
Unscheduled inspection
Start date: 2020-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004296716
Unscheduled inspection
Start date: 2020-02-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004296684
Unscheduled inspection
Start date: 2020-02-19, end date: 2020-03-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 772004204502
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 772004216450
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004209676
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904058166
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904158424
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904158374
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904156200
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904145828
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of the notification of the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of Mosgosstroynadzor
# 771904089654
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771904086019
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771904114605
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904114667
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904108735
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904108792
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771904091345
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 771903937876
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903936817
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903942284
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771904040337
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903977193
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 771903972094
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903827218
Unscheduled inspection
Start date: 2019-10-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903914512
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903816112
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903816138
Unscheduled inspection
Start date: 2019-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903873844
Unscheduled inspection
Start date: 2019-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903742951
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 771903742941
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-09-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771903741264
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903732115
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903623876
Unscheduled inspection
Start date: 2019-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903631663
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903631781
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-10-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 771903684319
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903680851
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803469708
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803483569
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-09-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803473998
Unscheduled inspection
Start date: 2019-08-08, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803489794
Unscheduled inspection
Start date: 2019-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803490102
Unscheduled inspection
Start date: 2019-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803473683
Unscheduled inspection
Start date: 2019-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803473703
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803472572
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803489146
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803473684
Unscheduled inspection
Start date: 2019-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803459136
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803458402
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803464007
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803464006
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803463971
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803450635
Unscheduled inspection
Start date: 2019-07-03, end date: 2019-07-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803449080
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803454241
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803430539
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803440814
Unscheduled inspection
Start date: 2019-06-18, end date: 2019-06-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803440494
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803440490
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803443167
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-06-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803445054
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803444465
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803443170
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803416721
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803416644
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803416377
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803416376
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803421258
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-06-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803418089
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803425175
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803425178
Unscheduled inspection
Start date: 2019-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803425174
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803424370
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803398593
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803398592
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803402537
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803404772
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803368909
Unscheduled inspection
Start date: 2019-03-12, end date: 2019-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803371779
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803364113
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803364112
Unscheduled inspection
Start date: 2019-03-06, end date: 2019-03-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803380707
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-04-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovnalichie specialistov po organizacii stroitelstva glavnyh inzhenerov proektanalichie chlenstva v samoreguliruemoi organizaciivypolnenie licom osuschestvlyayuschim stroitelstvotrebovanii chasti 3 stati 52 Gradostroitelnogo kodeksa
# 77190803380719
Unscheduled inspection
Start date: 2019-03-26, end date: 2019-04-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803361839
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803361838
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803330589
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803326183
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803343807
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-03-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803343806
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-03-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803326903
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803326897
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-02-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803353876
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803353875
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803314015
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803314013
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803242124
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803246218
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803246586
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803247173
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803205427
Unscheduled inspection
Start date: 2018-08-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803205426
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803204658
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803204657
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803204656
Unscheduled inspection
Start date: 2018-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803203894
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803203878
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803203863
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803203877
Unscheduled inspection
Start date: 2018-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803203876
Unscheduled inspection
Start date: 2018-08-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803203704
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803203703
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802533047
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701810895
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701712022
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: