Found 51 inspection:

# 002005196986
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 742100315716
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: 3
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotrenie obrascheniya № 12756 ot 21.06.2021


# 742100158806
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-05, duration: 4
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotrenie obrascheniya № 7644 ot 05.04.2021


# 742100094442
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-13, duration: 5
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotrenie obrascheniya № 6270 ot 18.03.2021


# 742100086202
Unscheduled inspection
Start date: 2021-04-02, end date: 2021-04-07, duration: 4
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotreniee obrascheniya № 5737 ot 12.03.2021


# 742100073252
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-03-30, duration: 2
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotrenie obrascheniya № 4939 ot 03.03.2021


# 742100074044
Unscheduled inspection
Start date: 2021-03-25, end date: 2021-03-29, duration: 3
Authority: Glavnoe upravlenie «Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti»
Purpose of inspection: Rassmotrenie obrascheniya № 4793 ot 02.03.2021


# 742105300647
Unscheduled inspection
Start date: 2021-01-13, end date: 2021-01-15, duration: 3
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti"
Purpose of inspection: Proverka predpisaniya № 19-3310 3389 ot 01.07.2019


# 742105305174
Unscheduled inspection
Start date: 2021-01-14, end date: 2021-01-19, duration: 4
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti"
Purpose of inspection: Proverka predpisaniya № 1962 ot 20.04.2019


# 742005267930
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-15, duration: 4
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki soblyudeniya obyazatelnyh trebovanii v oblasti gradostroitelnoi deyatelnosti na osnovanii izvescheniya ob okonchanii stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 30112020 5 po delu ch12614 vh 33021497 ot 3011202062 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii pri osuschestvlenii meropriyatii po kontrolyu za soblyudeniem trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti7 Predmetom nastoyaschei proverki yavlyaetsya proverka soblyudeniya obyazatelnyh trebovanii v oblasti gradostroitelnoi deyatelnosti sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichiya deistvuyuschego vydannogo upolnomochennym organom razresheniya na stroitelstvo


# 742005251753
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005196986
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-06, duration: 9
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki soblyudeniya obyazatelnyh trebovanii v oblasti gradostroitelnoi deyatelnosti na osnovanii izvescheniya ob okonchanii rekonstrukcii vh 33017009 ot 30092020Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii pri osuschestvlenii meropriyatii po kontrolyu za soblyudeniem trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti


# 002005196970
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-06, duration: 9
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki soblyudeniya obyazatelnyh trebovanii v oblasti gradostroitelnoi deyatelnosti na osnovanii izvescheniya ob okonchanii rekonstrukcii vh 33017009 ot 3009202062 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii pri osuschestvlenii meropriyatii po kontrolyu za soblyudeniem trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti


# 742004450625
Unscheduled inspection
Start date: 2020-07-14, end date: 2020-08-10, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004399173
Unscheduled inspection
Start date: 2020-04-27, end date: 2020-05-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu truboprovodov oborudovaniya pozharnoi nasosnoi stancii kriogennyh emkostei sistem videonablyudeniya montazhu protivotarannyh ustroistv i shlagbaumov montazhu sklada ZIP Soblyudenie protivopozharnyh i sanitarnoepidemiologicheskih trebovanii i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004401533
Unscheduled inspection
Start date: 2020-04-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742004271481
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration:
Authority:
Purpose of inspection:


# 742004239030
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-01-31, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 2741 ot 24052019


# 742004209551
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741904097165
Unscheduled inspection
Start date: 2019-12-13, end date: 2019-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po prokladke slabotochnyh setei montazhu sistem videonablyudeniya i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741903972935
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-12-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po blagoustroistvu dorog ograzhdeniyu territorii prokladke kabelei montazhu setei svyazi ustanovke oborudovaniya i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741903630826
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741903868598
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 741903862372
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-18, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 18730 ot 04102019


# 741903051093
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-09-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie ustroistva avtodorogi vodootvodov ustroistva bortovyh kamnei trotuarov montazha truboprovodov montazha sistem pozharnoi signalizacii obratnoi zasypki transhei montazha oborudovaniya nazemnyh emkostei ogruntovki pokraski truboprovodov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741903220900
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-23, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 15931 ot 27082019


# 741902965160
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-09-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie ustroistva osnovaniya avtodorogi montazha truboprovodov montazha sistem pozharnoi signalizacii montazha setei vodosnabzheniya kanalizacii teplosnabzheniya montazha oborudovaniya montazha nazemnyh emkostei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902868952
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902786321
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-18, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 1962 ot 20042019


# 741902755619
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie montazha proletnyh konstrukcii ploschadok estakady ustroistva fundamentov montazha truboprovodov montazha setei vodosnabzheniya kanalizacii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902823811
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-01, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 2226 ot 08052019


# 741902733269
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-24, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 1692 ot 25032019


# 741902663755
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-08, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 7055 ot 11042019


# 741902630632
Unscheduled inspection
Start date: 2019-04-17, end date: —, duration:
Authority:
Purpose of inspection:


# 741902646074
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-05-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie montazha opornyh konstrukcii estakady ustroistva fundamentov montazha truboprovodov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902598562
Unscheduled inspection
Start date: 2019-03-22, end date: 2019-03-25, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 201 ot 05022019


# 741902583747
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie zemlyanyh rabot ustroistva osnovanii ustroistva stroitelnoi ploschadki i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902448735
Unscheduled inspection
Start date: 2019-01-31, end date: 2019-02-05, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 180 ot 10012019


# 741802343874
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-29, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 4829 ot 06112018


# 741802293681
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-26, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 20701 ot 04122018


# 741801999807
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-06, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 17317 ot 10102018


# 741802056019
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-12-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801565740
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-08, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 15622 ot 11092018


# 741801918432
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-12, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 3197 ot 29082018


# 741801929686
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-10-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of a concrete screed in the basement, the waterproofing of the CUI and bathrooms in the basement, the installation of floors in the CUI and bathroom, when tiling the walls in the CUI and bathroom, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of the Articles 23 and 31 of the Urban Planning Code of the Russian Federation


# 741801521978
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-09-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the dismantling of the concrete screed in the basement, removal of soil in the basement, laying insulation and mesh in the basement and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800626831
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: rassmotrenie obrascheniya 13155


# 741800511458
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka zavershennogo stroitelstvom obekta 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800423457
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the trench development work, the sand cushion installation, welding and laying of PE pipes, the replacement of the power transformer and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800475000
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of sand backfilling, soil backfilling, GRPB installation, power transmission line construction, grounding and lightning protection installation, commissioning and construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2The presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31st52 of the Urban Planning Code of the Russian Federation


# 74160701232662
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-20, duration:
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: rassmotrenie obrascheniya 18636 ot 25112016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.