# 742005141323
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the box of the building on the 23rd floor inclusive with the installation of brickwork on the 15th floor inclusive after completion of the work, the installation of porches during the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects to which energy efficiency requirements do not apply and the requirements of facility equipment capital construction with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00150601297723
Unscheduled inspection
Start date: 2015-10-23, end date: 2015-11-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to assess the compliance of SU 5 LLC with the mandatory requirements of legislative, regulatory, legal and regulatory technical documents based on the message from SU 5 LLC dated 13102015 bn about a fatal accident at SU 5 LLC with the installer of construction machinery and mechanisms Tyshov YUV
# 742201515649
Unscheduled inspection
Start date: 2022-01-24, end date: 2022-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the basement and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742101453580
Unscheduled inspection
Start date: 2021-12-17, end date: 2021-12-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of load-bearing and enclosing structures above 0.000 (during the work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742101408338
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101259952
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101358448
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-11-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of the building frame, the installation of porches, external heating networks with entry into the house, internal water supply and sewerage networks, internal ventilation engineering networks, internal heating engineering networks, internal power supply and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101325341
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101049138
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100902725
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100715090
Unscheduled inspection
Start date: 2021-09-24, end date: 2021-09-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of piles, the device of the grillage (upon completion of work) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and requirements for the equipment of the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100410368
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100420288
Unscheduled inspection
Start date: 2021-08-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100335399
Unscheduled inspection
Start date: 2021-07-08, end date: 2021-07-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundations and installation of basement structures and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and facility equipment requirements capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100268907
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of load-bearing and enclosing structures at the level of the third, fourth and fifth floors and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Verification of the execution of the order dated 04/16/2021, due on 05/25/2021 3. Availability of a building permit. 4. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100243179
Unscheduled inspection
Start date: 2021-06-02, end date: 2021-06-08, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the installation of piles (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100147930
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-04-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the installation of piles (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100132296
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing and enclosing structures at the second floor level and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100185919
Unscheduled inspection
Start date: 2021-04-30, end date: 2021-05-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on the installation of translucent structures, installation of elevator equipment, installation of internal engineering networks (after completion of work), finishing work (during work). Finishing works, compliance with fire-fighting and sanitary-epidemiological measures, measures to ensure access for low-mobility groups of the population, facade work, installation of pit entrances to the basement, landscaping (notify after completion of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100107875
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of pile driving, monolithic grillwork and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100147881
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-04-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on roofing, brickwork, porches (after completion of work), installation of translucent structures (during work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code. The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction projects that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100055175
Unscheduled inspection
Start date: 2021-03-18, end date: 2021-03-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on meeting sanitary and epidemiological requirements, ensuring fire protection of buildings and access for the disabled; landscaping and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources;
2. Availability of a building permit.
3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742105328819
Unscheduled inspection
Start date: 2021-02-04, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 662105292514
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-19-01/329-19 dated 30.09.2019, notice of completion of construction No. 29-01-82/48077 dated 12/25/2020; Tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work and applicable building materials during the construction of a capital construction facility: A 2.7 MW hot water boiler house at the address: Sverdlovsk region, Nizhny Tagil, 8th microdistrict intersection of Dzerzhinsky Avenue - Sverdlov Street, mkr. Sverdlovsky, located at the address: Sverdlovsk region, Nizhny Tagil, 8th microdistrict intersection of Dzerzhinsky Avenue - Sverdlov Street, mkr. Sverdlovsky, the results of such work, the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005264674
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005264673
Unscheduled inspection
Start date: 2020-12-15, end date: 2020-12-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the building box on the 26th floor inclusive with the brickwork installation on the 19th floor inclusive after completion of the work with the installation of porches during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and facility equipment requirements capital construction with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005255700
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of building structures of the technical floor with the roofing and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 742005264686
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005184835
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005184829
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005184827
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005235002
Unscheduled inspection
Start date: 2020-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005226492
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-11-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of concrete structures of the ground floor attic and roof and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005203718
Unscheduled inspection
Start date: 2020-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662005187839
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005145655
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005147196
Unscheduled inspection
Start date: 2020-10-02, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005185853
Unscheduled inspection
Start date: 2020-10-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 662005192151
Unscheduled inspection
Start date: 2020-10-22, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 742005153416
Unscheduled inspection
Start date: 2020-10-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004495707
Unscheduled inspection
Start date: 2020-08-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 662004495443
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2919014919 dated 07112019 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility Residential building 2 with a boiler house at the address Sverdlovsk region Nizhny Tagil intersection of Dzerzhinsky Avenue Sverdlov Street MD Sverdlovsky located at Sverdlovsk region Nizhny Tagil intersection of Dzerzhinsky Avenue Sverdlov Street The Sverdlovsky Microdistrict of the results of such work meets the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 742004489817
Unscheduled inspection
Start date: 2020-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004489835
Unscheduled inspection
Start date: 2020-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004489826
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004489257
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-09-07, duration: 20
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: The purpose of federal state supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms based on the Instructions of the Head of the Federal Service for Labor and Employment Ivankov MU 3p dated January 24, 2020, Deputy Prime Minister of the Russian Federation TA Golikova TGP1211486 dated January 27, 2019, is to ensure compliance with and protection of labor rights and freedoms of citizens, including the right to safe working conditions. mandatory requirements and or requirements established by municipal legal acts to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, especially valuable including unique documents of the Archival Fund of the Russian Federation, documents of special historical, scientific and cultural significance, including the National Library Fund
# 742004444409
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the pile field, the completion of the laying of engineering networks and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004445487
Unscheduled inspection
Start date: 2020-07-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004445492
Unscheduled inspection
Start date: 2020-07-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 662004421766
Unscheduled inspection
Start date: 2020-06-02, end date: 2020-06-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2919018719 dated 20190301 Tasks the implementation of regional state construction supervision The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility Integrated development for housing construction at the address Sverdlovsk region Nizhny Tagil Udovenko Str MD 3 Murinskie Prudy residential area Residential building 7 located at Sverdlovsk region Nizhny Tagil Udovenko St. MD 3 of the Murinskie Prudy residential area of the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used. for the construction of fulfilling the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 742004436012
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004438035
Unscheduled inspection
Start date: 2020-06-30, end date: 2020-07-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the organization of the construction site, the construction of the excavation and pile field and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 The fulfillment of the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation
# 662004413186
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program is to carry out regional state construction supervision. The subject is to verify the compliance of work and applicable building materials during the construction of a capital construction facility, Residential building 2 with a boiler house at the address Sverdlovsk region, Nizhny Tagil, intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district, located at Sverdlovsk Region, Nizhny Tagil, intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 742004412100
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures on the 27th floor after completion of the work with the installation of enclosing structures of the entrance groups during the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resource 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004412089
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the 36th floor after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 Verification of compliance with the regulation from 240320203 Availability of permits for building4 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 662004376279
Unscheduled inspection
Start date: 2020-03-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004336171
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete columns and the floor covering of the 1st floor of the completed stage and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004336142
Unscheduled inspection
Start date: 2020-03-19, end date: 2020-03-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of concrete structures of the 12th floor completed stage with the construction of porches during the production process and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in paragraphs 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for construction 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 662004266479
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 741904121280
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations during the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 661903939325
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-12-06, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement the inspection program dated September 30, 2019 29190132919 The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "27 MW Hot water Boiler House at the address Sverdlovsk region Nizhny Tagil 8microregion intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district" located at the address Sverdlovsk region Nizhny Tagil 8microregion intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 Articles 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661903594426
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-18, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement the inspection program dated 01082019 2919014919. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Residential building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district, located at Sverdlovsk Region, Nizhny Tagil, the intersection of Dzerzhinsky Avenue, Sverdlov Street, Sverdlovsky district, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that do not apply to energy efficiency requirements, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2, 3, and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation
# 661903202510
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902878169
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-08-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to verify the conformity of the completed construction of the capital construction facility and the construction materials used during the construction of the capital construction facility. The task is to carry out regional state construction supervision. The subject of the KNM is to verify the conformity of the work and the applicable building materials during the construction of the capital construction facility "Residential building 2 with boiler house at the address Sverdlovatimiryazeva St., Sverdlovsk region, Nizhny Tagil. at the address Sverdlovsk region Nizhny Tagil, the intersection of SverdlovaTimiryazev Streets, the results of such work meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902731218
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902658656
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to implement the inspection program dated October 17, 2018 29190122317. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva Streets Stage 2" located at Sverdlovsk Region Nizhny Tagil, the intersection of SverdlovaTimiryazev Streets, the results of such work, the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code. the Code of the Russian Federation
# 661902604487
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902436256
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902332209
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the facts stated in the appeal of Yurchenko AA vh O1295 dated 19112018 on the operation and technical condition of overhead cranes in violation of the requirements of Article 9 of the Federal Law dated 21071997 116FZ "On Industrial Safety of hazardous Production facilities" and violations of the "Rules of Technical operation of electrical installations of consumers" Approved by the Order of the Ministry of Energy of the Russian Federation dated 13012003 6, which creates an immediate threat of harm to life to the health of service personnel and an indefinite circle of persons in the event of an accident on the basis of part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the exercise of State Control, Supervision and Municipal Control" Prevention, detection and suppression of violations of industrial safety requirements during the operation of hazardous production facilities safety requirements in the electric power industry at 622051 Sverdlovskaya Nizhny Tagil region, Severnoye shosse 12 street
# 661802171855
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose of the inspection is to implement the inspection program dated October 17, 2018 29190122317. The objectives of this inspection are to carry out regional state construction supervision. The subject of the inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of SverdlovaTimiryazev Streets Stage 2" located at the address Sverdlovsk region Nizhny Tagil, the intersection of Sverdlovatimiryazev Streets, the results of such work, the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federations
# 661801981121
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-02, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated June 04, 2018 2919018718 the objectives of this audit are the implementation of regional state construction supervision the subject of the audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated August 17, 2018 291907233
# 661800637106
Unscheduled inspection
Start date: 2018-08-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800560610
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the audit is the implementation of the inspection program dated June 04, 2018 2919018718 the tasks of verifying the implementation of the inspection program dated June 04, 2018 2919018718 the subject of the audit is checking the compliance of the work and applicable building materials during the construction of the capital construction facility "Integrated development for housing construction at the address Sverdlovsk region Nizhny Tagil ul Udovenko MKR 3 residential area "Murinskie Prudy Residential building 7" located at the address Sverdlovsk region Nizhny Tagil Udovenko St., MKR 3 of the Murinskie Prudy residential district, the results of such work meet the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 Articles 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800479221
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program dated March 21, 2018 29190122317 The task is to carry out state construction supervision The subject is to verify the conformity of work and applicable building materials during the construction of the capital construction facility "Residential building 2 with boiler room at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets" located at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets the results of such the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800386110
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: OBJECTIVES To inspect a capital construction facility completed TASKS to carry out regional state construction supervision The subject of the KNM is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential building 2 with boiler room at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets" located at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets the results of such work the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800194333
Unscheduled inspection
Start date: 2018-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800062866
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661800035818
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose of the audit is to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated December 15, 2017 291905365 the task of the audit is to carry out state construction supervision the subject of the audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements dated December 15, 2017 291905365
# 66180803056064
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802801679
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-12-04, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to implement the inspection program 29190134216 dated March 30, 2017, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential Building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva Streets" located at Sverdlovsk Region, Nizhny Tagil, the intersection of Sverdlovatimiryazev Streets, the results of such work, the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping a capital building6 facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170802912498
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To verify that the completed capital construction facility complies with the performance of work and the construction materials used during the construction of the capital construction facility "Residential building 2 with boiler room at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets" located at Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva streets the results of such work requirements of technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, verification is carried out on the basis of a notice of completion of construction of the capital construction facility dated 24112017 29018247172 in accordance with the inspection program dated 30032017 29190134216 subparagraph "a" of paragraph 2 subparagraph "a" of paragraph 3 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the completed construction of the facility
# 66170802757976
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-20, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to implement the inspection program dated July 21, 2017 29190122317, the objectives of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential Building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva Streets" located at the address Sverdlovsk region Nizhny Tagil, the intersection of Sverdlovatimiryazev Streets, the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital building6 facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170802775763
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-13, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this audit is being conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291905264 dated September 22, 2017The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 291905264 dated September 22, 2017The task of this audit is to carry out state construction supervision
# 66170801926813
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to implement the inspection program 29190134216 dated March 30, 2017, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Residential Building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of Sverdlovatimiryazeva Streets" located at Sverdlovsk Region, Nizhny Tagil, the intersection of Sverdlovatimiryazev Streets, the results of such work, the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping a capital building6 facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170801913551
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-09-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: 5 Establish that this inspection is being conducted in order to monitor the implementation of the previously issued order to eliminate identified violations of mandatory requirements 291905145 dated July 16, 2017The purpose of this inspection is to comply with the previously issued order to eliminate identified violations of mandatory requirements 291905145 dated July 16, 2017The task of this inspection is to carry out state construction supervision
# 66170701622535
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-06-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out within the framework of the regional state construction supervision the registration number of the function in the Federal State Register of State and Municipal Services of Functions 6600000010001463559 Establish that this inspection is carried out in order to implement the inspection program 29190134216 dated March 30, 2017, the objectives of which is to carry out state construction supervision. The purpose of this inspection is to verify the conformity of work performed and applicable building materials during construction the capital construction facility "Residential building 2 with boiler room at the address Sverdlovsk region Nizhny Tagil intersection of SverdlovaTimiryazev streets" located at Sverdlovsk region Nizhny Tagil intersection of SverdlovaTimiryazev streets the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital building6 with metering devices for energy resources used, as well as the availability of permits for construction and fulfillment of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66160701102293
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160701121264
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: and to consider the developer of customer entity engaged in construction for inspection of the completed construction of the facility documents related to the execution of works including construction design engineering networking sites security as well as the use of construction materials, products namely General or special log which is a record of work of the Executive documentation including acts of examination work structures engineering networking sites provide an impact on the security control over the performance of which could not be carried out after performing other work as well without disassembly or damage of building structures and network parts technical security acts of trials and testing of technical devices, systems all acts provisions of the notice of elimination of violations of the shortcomings identified in the implementation of state construction supervision and construction control of the results of expert examinations and other laboratory tests performed works conducted in the process of construction control documents confirming the performance of quality control of construction materials used documents confirming the execution of decisions on cases of administrative offences and organizationalanalytical and the constituent documents of legal entities and individual entrepreneurs associated with the implementation of the construction of the object of capital construction documents confirming the powers of predstavitelei to conduct a visual inspection of all the built object of capital construction in full, including a separate work performed construction and design areas of networking technical support and application of building materials products checking compliance technical regulations rules and regulations other regulations and project documentation in relation to the work performed remediation of deficiencies in relation to the work performed revealed R
# 66160700044569
Unscheduled inspection
Start date: 2016-08-23, end date: 2016-09-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this inspection is carried out on the basis of the notice of completion of the construction of the capital construction facility bx dated 16082016 29018234176 subparagraph "a" of paragraph 2 subparagraph "a" of paragraph 3 of part 5 of Article 54 of the Urban Planning Code of the Russian Federation
# 66160700042894
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: this inspection is carried out in order to monitor the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements dated February 16, 2016 29190413, namely paragraphs 15-16 of this regulation with a deadline for elimination until the submission of a notice of completion of the facility the notice of completion of the capital construction facility was sent on August 16, 2016
# 66160601778101
Unscheduled inspection
Start date: 2016-08-10, end date: 2016-08-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to monitor the execution of the previously issued order to eliminate the identified violation of mandatory requirements dated June 20, 2016 291904113, which expired on August 01, 2016
# 00150601289771
Unscheduled inspection
Start date: 2015-10-23, end date: 2015-11-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to assess the compliance of SU 5 LLC with the mandatory requirements of legislative, regulatory, legal and regulatory technical documents based on the message from SU 5 LLC dated 13102015 bn about a fatal accident at SU 5 LLC with the installer of construction machinery and mechanisms Tyshov YUV
# 00150601297723
Unscheduled inspection
Start date: 2015-10-23, end date: 2015-11-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to assess the compliance of SU 5 LLC with the mandatory requirements of legislative, regulatory, legal and regulatory technical documents based on the message from SU 5 LLC dated 13102015 bn about a fatal accident at SU 5 LLC with the installer of construction machinery and mechanisms Tyshov YUV