Found 172 inspections:

# 002005266520
Unscheduled inspection
Start date: 2020-12-08, end date: 2020-12-16, duration: 7
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 23102020 RP41020890 on the elimination of violations by Elinalfa LLC during the construction of the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park. The objectives of this inspection are monitoring of the measures taken by ELINALFA LLC to comply with the instructions of the Caucasian Rostechnadzor Administration dated 23102020 RP41020890 and compliance with the mandatory requirements of regulatory acts in the field of construction during the construction and reconstruction of a capital construction facility, the subject of this audit is compliance with the instructions of the state control and supervision authorities


# 002004456101
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-24, duration: 5
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 26022020 RP410780 on the elimination of violations by ELINALFA LLC during the construction of the reconstruction of a capital construction facility. The objectives of this inspection are to monitor the measures taken by ELINALFA LLC to comply with the instruction of the Caucasian Directorate of Rostechnadzor dated 26022020 RP410780 and compliance with mandatory requirements of regulatory acts in the field of construction During the construction and reconstruction of a capital construction facility, the subject of this audit is the fulfillment of the instructions of the state control and supervision authorities.


# 002004294864
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-02-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor C2519140 dated 18112019 on the elimination of identified offenses, the deadline for which expired on 30122019. The purpose of this audit is to verify the elimination of violations recorded in the instruction C2519140 dated 18112019. The subject of this audit is the implementation of the regulations of the federal state construction supervision


# 001902662933
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-30, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 28022019 670RVA18 on the elimination of violations by Elinalfa LLC during the construction of the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park


# 001800614676
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-07, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 29052018 393G3327X18


# 001800583212
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-08, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 25052018 1949RPA18 on the elimination of violations by Elinalfa LLC during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park. The objectives of this inspection are 1 monitoring of the measures taken by Elinalfa LLC to comply with the instruction of the Caucasian Rostechnadzor Office dated 25052018 1949RPA18 and compliance with the mandatory requirements of regulatory acts in the field of construction during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park 2 taking measures to identify violations of mandatory requirements and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts


# 772101493445
Unscheduled inspection
Start date: 2021-12-22, end date: 2021-12-28, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100777078
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772100424534
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-12, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 422000280946
Unscheduled inspection
Start date: 2021-06-09, end date: 2020-12-21, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is conducted for the purpose of monitoring execution: - points 10, 35, 37-41, 86-88, 90-94, 107 regulations of the Siberian Administration of Rostechnadzor dated 18.09.2020 From-25-20-179 on the elimination of identified offenses, the deadline for which has expired; - paragraphs 1,2,4,5,7 of the regulation of the Siberian Directorate of Rostechnadzor dated 12/21/2020 With-25-20-256 on the elimination of identified offenses, the deadline for which has expired; - regulations from 03/25/2021 No. C-25-21-039 The Siberian Administration of Rostechnadzor on the elimination of identified offenses, the deadline for which has expired. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). 7. The subject of this audit is: compliance with the regulations of the federal state construction supervision authorities.


# 422000200686
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-03-25, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor dated 02/25/2021 With-25-21-022 on the elimination of identified offenses, the deadline for which has expired. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor).


# 422000238751
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration:
Authority:
Purpose of inspection:


# 772100229228
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 422000016153
Unscheduled inspection
Start date: 2021-02-11, end date: 2021-02-25, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that this inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor dated 02/10/2020 With-25-20-015 on the elimination of identified offenses, the deadline for which has expired. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). 7. The subject of this audit is: compliance with the regulations of the federal state construction supervision authorities.


# 422000040734
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 422000016148
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 422000040716
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 422000040580
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772005285185
Unscheduled inspection
Start date: 2020-12-23, end date: 2021-01-15, duration: 12
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 002005266520
Unscheduled inspection
Start date: 2020-12-08, end date: 2020-12-16, duration: 7
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 23102020 RP41020890 on the elimination of violations by Elinalfa LLC during the construction of the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park. The objectives of this inspection are monitoring of the measures taken by ELINALFA LLC to comply with the instructions of the Caucasian Rostechnadzor Administration dated 23102020 RP41020890 and compliance with the mandatory requirements of regulatory acts in the field of construction during the construction and reconstruction of a capital construction facility, the subject of this audit is compliance with the instructions of the state control and supervision authorities


# 002005234001
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-12-21, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019.399the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer.7 The subject of this inspection is to verify the compliance of the work performed and the applied construction materials during the construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code Of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422000030148
Unscheduled inspection
Start date: 2020-11-24, end date: —, duration:
Authority:
Purpose of inspection:


# 772005145680
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 002005176612
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-23, duration: 10
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify that LLC ELINALFA complies with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development by LLC Elinalfa, including technical regulations and design documentation during the construction of reconstruction the object of capital construction the subject of this audit is compliance with mandatory requirements


# 002004497918
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019.399the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer.7 The subject of this inspection is to verify the compliance of the work performed and the applied construction materials during the construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code Of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 772004489660
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 262004461461
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 002004456101
Unscheduled inspection
Start date: 2020-07-20, end date: 2020-07-24, duration: 5
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 26022020 RP410780 on the elimination of violations by ELINALFA LLC during the construction of the reconstruction of a capital construction facility. The objectives of this inspection are to monitor the measures taken by ELINALFA LLC to comply with the instruction of the Caucasian Directorate of Rostechnadzor dated 26022020 RP410780 and compliance with mandatory requirements of regulatory acts in the field of construction During the construction and reconstruction of a capital construction facility, the subject of this audit is the fulfillment of the instructions of the state control and supervision authorities.


# 772004412910
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 002004412066
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-06-18, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019.399the purpose of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer.7 The subject of this inspection is to verify the compliance of the work performed and the applied construction materials during the construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code Of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by the Legislation of the Russian Federation. parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 262004393918
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-05-22, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out in order to notify HC dated 27032020 38390105 Elinalfa LLC about the completion dates of the work to be checked inspection program dated 05082019 31072019 construction stage 6 "Internal engineering systems and equipment" and 7 "External engineering systems and equipment"The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction. The purpose of this audit is to note the necessary compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of structures, sections of engineering and technical support networks, and compliance with other requirements when performance of works established by the project documentation, including requirements regarding energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for the energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 772004364380
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 262004344539
Unscheduled inspection
Start date: 2020-03-11, end date: 2020-04-07, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out in order to notify HC from 03032020 26400106 Elinalfa LLC about the completion dates of the work to be checked inspection program from 05082019 31072019 construction stage 4 "Wall structures" The objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, and the person carrying out the construction The subject of this audit is to note the necessary compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of work on structures of sections of engineering and technical support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 772004359508
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-03-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 262004370155
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 002004247903
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-26, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify that LLC ELINALFA complies with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of a capital construction facility. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and design documentation, committed by LLC ELINALFA during the reconstruction of a capital construction facility. For construction, the subject of this audit is compliance with mandatory requirements


# 262004295891
Unscheduled inspection
Start date: 2020-02-19, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 262004248810
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 772004247954
Unscheduled inspection
Start date: 2020-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 002004294864
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-02-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor C2519140 dated 18112019 on the elimination of identified offenses, the deadline for which expired on 30122019. The purpose of this audit is to verify the elimination of violations recorded in the instruction C2519140 dated 18112019. The subject of this audit is the implementation of the regulations of the federal state construction supervision


# 002004181507
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-02-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019.399the task of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer.7 The subject of this inspection is to verify the compliance of the work and the construction materials used in during the construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk" as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements set out in Parts 2 to 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 771904149923
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 261904049370
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out in order to notify HC dated 26112019 204760114 Elinalfa LLC of the elimination of violations during the construction of the reconstruction of the capital construction facility in accordance with the regulation dated 28082019 31072019 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation. The purpose of the inspection is to note the necessary elimination of violations of compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation identified during construction control and regional state construction supervision, hereinafter referred to as violations, as well as compliance with the prohibition to proceed with work until acts on the elimination of such violations are drawn up


# 771903798958
Unscheduled inspection
Start date: 2019-10-02, end date: —, duration:
Authority:
Purpose of inspection:


# 001903821922
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019. 399the task of this inspection is to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the subject of this inspection is to verify the compliance of the work and the construction materials used in the process construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk" as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements set out in Parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 771903516226
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-09-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 261902924684
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: Notice of the start of construction of the capital construction facility of the BX dated 26072019 131710114


# 001902861356
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to implement the Inspection Program approved by Kolegov DV, Deputy Head of the Siberian Department of Rostechnadzor, dated 01072019. 399the task of this inspection is to prevent identify and suppress violations of legislation on urban planning activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the subject of this inspection is to verify the compliance of the work and the construction materials used in during the construction of the capital construction facility "Multifunctional Ice Arena on Nemirovichadanchenko St. in Novosibirsk", as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 77190803461848
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the verification of the fulfillment of the order based on the expiration of the deadline for the fulfillment by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements from 13062019 465519. The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of legislation on urban development by the person being audited. The subject of this audit is The purpose is to check the elimination of violations specified in the order issued by Mosgosstroynadzor 465519 dated 13062019


# 77190803466845
Unscheduled inspection
Start date: 2019-07-26, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803425901
Unscheduled inspection
Start date: 2019-05-30, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 781902726593
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-22, duration:
Authority: Otdel po voprosam migracii UMVD Rossii po Nevskomu raionu g SanktPeterburga
Purpose of inspection: The audit is conducted in order to verify compliance with the legislation of the Russian Federation in the field of migration. The objectives of this audit are to comply with the requirements of the legislation of the Russian Federation in the field of migration, identify administrative offenses in the field of migration and crimes, bring perpetrators of administrative offenses in the field of migration to justice, ensure the rights and legitimate interests of foreign citizens and stateless persons, identify and eliminate the causes and conditions conducive to the commission of administrative offenses in the field of migration and crimes


# 77190803404411
Unscheduled inspection
Start date: 2019-04-24, end date: —, duration:
Authority:
Purpose of inspection:


# 001902662933
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-30, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 28022019 670RVA18 on the elimination of violations by Elinalfa LLC during the construction of the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park


# 77190803362361
Unscheduled inspection
Start date: 2019-03-05, end date: —, duration:
Authority:
Purpose of inspection:


# 001902505237
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-28, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the compliance of Elinalfa LLC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park


# 241802026269
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of 31082017 for conducting inspections during the construction of a capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for used energy resources 72 Compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of a construction permit


# 241802056695
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The objectives of this audit are to establish the fact of the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the body carrying out regional state construction supervision


# 241801548930
Unscheduled inspection
Start date: 2018-09-24, end date: —, duration:
Authority:
Purpose of inspection:


# 241800670866
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 241800681687
Unscheduled inspection
Start date: 2018-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241800681680
Unscheduled inspection
Start date: 2018-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24180803223240
Unscheduled inspection
Start date: 2018-09-06, end date: 2018-10-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: implementation of the legal order of the body carrying out regional state construction supervision


# 241800616603
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 26042018 940NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13082018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800627538
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-08-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 04072018 2266TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15082018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 001800614676
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-07, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 29052018 393G3327X18


# 241800710420
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 20062018 1873NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 24082018 vx 203 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241800652315
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to verify the fulfillment of the previously issued to the person being audited order dated 20062018 1873TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27082018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the order of the authority carrying out regional state construction supervision


# 241800647049
Unscheduled inspection
Start date: 2018-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 241800643705
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-09-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 03082018 2807TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires in 20082018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 77180803206228
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-09-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 241800585887
Unscheduled inspection
Start date: 2018-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 001800583212
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-08, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 25052018 1949RPA18 on the elimination of violations by Elinalfa LLC during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park. The objectives of this inspection are 1 monitoring of the measures taken by Elinalfa LLC to comply with the instruction of the Caucasian Rostechnadzor Office dated 25052018 1949RPA18 and compliance with the mandatory requirements of regulatory acts in the field of construction during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park 2 taking measures to identify violations of mandatory requirements and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts


# 241800575322
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 01062018 1766SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01082018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800556556
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-10, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of an order previously issued to the person being audited dated 26062018 2016TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27072018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800565756
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 31052018 1414EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800494522
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31082017 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code Verification of the availability of a building permit in the Russian Federation


# 241800512549
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 19042018 1183NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800465674
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 19042018 1182NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800461639
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 26042018 927NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800422272
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 28042018 1236NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800466492
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction dated 11052018 1260TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800438209
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 27042018 937SENiEK on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 31052018 bx 119 on the elimination of violations before the expiration of the period specified in the instruction the purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241800403764
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code Verification of the availability of a building permit in the Russian Federation


# 241800391832
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31082017 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 77180803163896
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241800341964
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 12032018 350NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 15052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800381296
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 27042018 1181NSS on the elimination of identified violations at the specified capital construction facility, which expires on 28052018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800381318
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 27042018 1187NSS on the elimination of identified violations at the specified capital construction facility, which expires on 28052018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 001800359482
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-18, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the fulfillment of the previously issued instruction of the Caucasian Directorate of Rostechnadzor dated 09022018 296rVP18 on the elimination of violations by Elinalfa LLC during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park. The objectives of this inspection are 1 monitoring of the measures taken by Elinalfa LLC to comply with the instruction of the Caucasian Directorate of Rostechnadzor dated 09022018 296rVP18 and compliance with the mandatory requirements of regulatory acts in the field of construction during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park 2 taking measures to identify violations of mandatory requirements and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts


# 001800359479
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-25, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the compliance of Elinalfa LLC with the mandatory requirements of legislation on urban development, including technical regulations and design documentation for the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at the address Stavropol Territory, Kislovodsk, Kurortny Gora Maloe Sedlo Park on the basis of PP 3 26 27 88 89 inspection programs from 28032018 the objectives of this inspection are the prevention, detection and suppression of violations of the law on urban development activities committed by Elinalfa LLC, including technical regulations and design documentation during the reconstruction of the capital construction facility "Reconstruction of sports facilities in Kislovodsk" 5th stage "Upper Base" located at Stavropol territory city of Kislovodsk Kurortny Gora Maloe Sedlo Park b taking measures to identify violations of mandatory requirements and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts


# 241800377082
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction No. 26042018 927SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800352723
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 22032018 575NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28042018 bx 96 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of this audit is to comply with the legal order of the body carrying out the regional state construction supervision, which is about to expire


# 241800352712
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 12032018 350NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28042018 vx 96 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of this audit is to comply with the lawful order of the body carrying out regional state construction supervision, the deadline for which expires on the DATE respectively


# 241800352694
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 27042018 1187NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28042018 bx 96 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of this audit is to comply with the legal order of the body carrying out the regional state construction supervision, the deadline for which expires


# 241800352648
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction dated 27042018 1181NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 28042018 bx 96 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of this audit is to comply with the legal order of the body carrying out the regional state construction supervision, which is about to expire


# 241800333081
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Krasnoyarskomu krayu
Purpose of inspection: in order to prevent damage to the rights and legitimate interests of the life and health of citizens and the environment, based on the application of Elinalfa LLC for a license dated 11042018, part 14170307, the purpose of this audit is to exercise state control over supervision of compliance with the requirements of the legislation of the Russian Federation regarding compliance by the license applicant with licensing requirements when carrying out activities in the field of the use of ionizing radiation sources generating if these sources are used in medical activities and to prevent the harmful effects of environmental factors on humans, the subject of this audit is the information contained in the submitted application and documents of the license applicant on his activities, the condition of premises buildings and equipment that are supposed to be used in carrying out the licensed type of activity, the compliance of the license applicant's employees with licensing requirements, as well as information about the specified legal entity contained in the Unified State Register of Legal Entities and other federal information resources


# 241800312117
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the completion of work that is subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800261976
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 12032018 350EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269758
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 26022018 382NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13042018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800269727
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 21022018 221NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269649
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 02022018 15NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800269764
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 09022018 329NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16042018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269749
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 09022018 206NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16042018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800269666
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 09022018 144NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 16042018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800228939
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800229098
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800227782
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is conducted in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program of 31082017 inspections during the reconstruction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, Verification of the availability of building permits


# 241800315520
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-25, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 19032018 504NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 17042018 bx 57 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of the lawful order of the body carrying out regional state construction supervision.


# 241800315491
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 12032018 350NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 17042018 bx 57 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of the lawful order of the body carrying out regional state construction supervision.


# 241800315615
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-05-25, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 22032018 575NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 17042018 bx 57 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of the lawful order of the body carrying out regional state construction supervision.


# 241800320081
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited regulation No. 1133EN dated 20042018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 26042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800275975
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 28022018 225NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800276934
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 27032018 793TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27042018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800200973
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 241800171083
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority:
Purpose of inspection:


# 241800090577
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800087008
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 241800058187
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 241800079634
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 241800027902
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800027979
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the completion of work that is subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 241800026435
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800018392
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-14, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: establishment of the fact of elimination of previously identified violations verification of the work actually performed in accordance with the prescribed measures within the prescribed period


# 241800040300
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 22122017 5254NSS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 05022018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800046151
Unscheduled inspection
Start date: 2018-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 241800018351
Unscheduled inspection
Start date: 2018-01-31, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24180803052918
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-02-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 13102017 4229EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 19.012018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24180803015279
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802908319
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802908312
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802960893
Unscheduled inspection
Start date: 2017-12-13, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802960827
Unscheduled inspection
Start date: 2017-12-13, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802762222
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802762385
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the completion of work that is subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170802592951
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802607555
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the completion of work that is subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170802607460
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802646824
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction dated 2402017 3506OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 10102017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170801950139
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of an order previously issued to the person being checked dated 28072017 2095TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 01092017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170801913132
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701867703
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701802129
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701801737
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-23, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 23012017 17NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 09082017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701861365
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Checking the availability of a construction permit73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701837520
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701619238
Unscheduled inspection
Start date: 2017-07-21, end date: 2017-08-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 28042017 1487TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires in 2007-2017. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701617684
Unscheduled inspection
Start date: 2017-07-21, end date: 2017-08-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28042017 1188TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires in 20072017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701749641
Unscheduled inspection
Start date: 2017-06-30, end date: 2017-07-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of an order previously issued to the person being checked dated 21042017 1185TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 29062017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is to comply with the instructions of the body carrying out Regional State construction supervision


# 24170701630305
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the completion of work that is subject to inspection in accordance with the approved program dated 21072016 for inspections during the construction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this audit is71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources 72 Checking the availability of a construction permit 73 Checking the availability of a certificate of admission to the types of works on the construction of a capital construction facility that have an impact on the safety of the capital construction facility


# 24170701630259
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of a construction permit, Verification of a certificate of admission to the types of work on the construction of the facility capital construction projects that have an impact on the safety of the capital construction facility


# 24170701566810
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 30032017 638NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 10052017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 77170701648277
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701571250
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701627046
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-06-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 28042017 1227NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 12052017 bx 45 on the elimination of violations before the expiration of the period specified in the instruction. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the actual work performed in accordance with the prescribed measures. The purpose of the audit is to comply with the legal order of the body carrying out regional state construction supervision


# 24170701517843
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 27032017 957TN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 14042017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701493161
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701492945
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701493031
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701564107
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-05-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 23012017 17NSS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19042017 The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701396235
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 14072016 inspections during the construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and Verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701393689
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701447675
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 16012017 16EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17032017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701358871
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701389428
Unscheduled inspection
Start date: 2017-02-22, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701372464
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-02-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of an order previously issued to the person being audited to eliminate identified violations at a capital construction facility, the deadline for which expires. The objectives of this audit are to establish the fact of eliminating previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24170701365326
Unscheduled inspection
Start date: 2017-02-22, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701299376
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Verification of the fulfillment of orders previously issued to the person being checked on the elimination of identified violations at capital construction facilities, the deadline for which expires, Establishment of the fact of elimination of previously identified violations, verification of the work actually performed in accordance with the prescribed measures within the prescribed time period, Compliance with the lawful order of the body carrying out regional state construction supervision


# 24170701299285
Unscheduled inspection
Start date: 2017-01-17, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 77160701128825
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer the customer or the person carrying out construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1131716 dated 20102016


# 77160701025238
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used


# 77160700043440
Unscheduled inspection
Start date: 2016-08-19, end date: 2016-08-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer the customer or the person carrying out construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 715116 dated 18072016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.