Found 37 inspections:

# 001801911791
Unscheduled inspection
Start date: 2018-09-20, end date: 2018-10-03, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to establish, within the competence of the facts set out in the appeal dated September 3, 2018 O38340A1 on the basis of a reasoned submission from an official of the state control and supervision body, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety, mandatory requirements, and take measures to eliminate violations mandatory requirements in case of their identification and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts 7 The subject of this audit is compliance by a legal entity in the course of its activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices used in hazardous production facilities the facilities comply with the specified requirements of the buildings, facilities, facilities, equipment and materials used, as well as requirements for machinery and equipment and related requirements for these products of the processes of operation and disposal


# 772101066721
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772101239486
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the execution of regulation No. 02-13-107200-5-03 dated 03/05/2021


# 772100201842
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 1
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The inspection is carried out in order to: protect the rights and interests of an employee on the basis of the Order of the Head of the Federal Service for Labor and Employment dated 04/02/2021 No. 73 pursuant to paragraph 5.2 of the Protocol of the operational meeting of the Security Council of the Russian Federation No. Pr-356, approved by the President of the Russian Federation V.In, Putin 23.02.021 The objectives of the audit are: supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is: - compliance with mandatory requirements and (or) requirements established by municipal legal acts; - compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements; - matching information. contained in the application and documents of a legal entity or individual entrepreneur for granting legal status, special permission (license), issuance of permission (approval) to mandatory requirements, as well as data on these legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other federal information resources; - compliance with the instructions of state control bodies (supervision), municipal control bodies; - carrying out measures; - to prevent harm to the life, health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents having special significance historical significance, scientific, cultural significance, which are part of the national library fund; - to prevent the occurrence of natural and man-made emergencies; - to ensure the security of the state; - to eliminate the consequences of causing such harm.


# 772100189964
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: for the purpose of: monitoring compliance with the working conditions of foreign citizens involved in the implementation of major investment projects, taking into account the restrictive measures taken during the spread of coronavirus infection, based on Order No. 131 of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 "On conducting inspections of working conditions of foreign citizens involved in implementation of major investment projects", Order of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare No. 147 dated 04/06/2021 "On Amendments to Rospotrebnadzor Order No. 131 dated 04/02/2021 "On inspections of working conditions of Foreign Citizens involved in the implementation of major investment projects", issued in order to implement paragraph 5.2 of the protocol of the operational meeting The Security Council of the Russian Federation dated 02/23/2021, approved by the President of the Russian Federation V.V.Putin on 03/05/2021 No. Pr-356. The objectives of this audit are: monitoring compliance with mandatory requirements in the field of sanitary and epidemiological human well-being. The subject of this audit is compliance with mandatory requirements and the conduct of events.:to prevent harm to the life and health of citizens


# 782100189856
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 7
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Sankt-Peterburgu
Purpose of inspection: Supervision of compliance by a legal entity / individual entrepreneur with the mandatory requirements of legislation in the field of sanitary and epidemiological welfare of the population, technical regulation


# 772100168894
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-05-21, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 502004530146
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 772004340199
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used by specialists in the organization of construction of the main engineers of the project


# 772004223824
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904078497
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771903904328
Unscheduled inspection
Start date: 2019-10-25, end date: 2019-11-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program. The tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban development by the audited person. The subject is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the design documentation, including the requirements of energy efficiency and equipment of the facility capital construction accounting devices for used energy resourcesthe work of specialists in the organization of construction of the main engineers of the project


# 77190803489056
Unscheduled inspection
Start date: 2019-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803455091
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803383967
Unscheduled inspection
Start date: 2019-03-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803317428
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771802000656
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803247030
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 771800761513
Unscheduled inspection
Start date: 2018-09-03, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:


# 77180803220825
Unscheduled inspection
Start date: 2018-09-04, end date: —, duration:
Authority:
Purpose of inspection:


# 001801911791
Unscheduled inspection
Start date: 2018-09-20, end date: 2018-10-03, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to establish, within the competence of the facts set out in the appeal dated September 3, 2018 O38340A1 on the basis of a reasoned submission from an official of the state control and supervision body, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety, mandatory requirements, and take measures to eliminate violations mandatory requirements in case of their identification and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts 7 The subject of this audit is compliance by a legal entity in the course of its activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices used in hazardous production facilities the facilities comply with the specified requirements of the buildings, facilities, facilities, equipment and materials used, as well as requirements for machinery and equipment and related requirements for these products of the processes of operation and disposal


# 77180803185000
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771800496571
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-17, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: establishment of compliance of the licensee's license applicant with licensing requirements verification of information on the activities of the licensee's license applicant on the availability and condition of equipment tools technical means measuring instruments technical documentation and other objects used by the licensee to carry out the licensed type of activity on compliance of employees of the licensee's license applicant with licensing requirements compliance of information contained in the application and documents of a legal entity or individual entrepreneur on the provision of legal the status of a special permit license for the right to carry out certain types of activities or permit approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities unified state register of legal entities the register of individual entrepreneurs and other federal information resources the condition of premises buildings structures technical means equipment and other facilities that are supposed to be used by the license applicant or licensee in the implementation of the licensed type of activity and the availability of employees necessary for the implementation of the licensed type of activity in order to assess the compliance of such facilities and employees with licensing requirements


# 77180803133131
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803100848
Unscheduled inspection
Start date: 2018-03-14, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803076157
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802999257
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802470289
Unscheduled inspection
Start date: 2017-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701897965
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701686771
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701637144
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-05-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701475148
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701208769
Unscheduled inspection
Start date: 2016-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701056600
Unscheduled inspection
Start date: 2016-11-03, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700583726
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical specifications regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources


# 77160700049143
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700083598
Unscheduled inspection
Start date: 2016-08-30, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.