Found 77 inspections:

# 162101443124
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 07.12.2021 case No.18-11-2021/006. prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and design documentation documentation. compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 162101467576
Unscheduled inspection
Start date: 2021-12-22, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/11/2020 case No.15-04-2020/0021☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101488809
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/14/2021 case No. 12-04-2021/0081. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101311493
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04.10.2021 case No. 18-11-2021/006. prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and design documentation documentation. compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101349196
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/14/2021 case No. 12-04-2021/0081. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162101207586
Unscheduled inspection
Start date: 2021-10-13, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09/17/2021 case No. 16-04-2021/0026. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.


# 162101211011
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/11/2020 case No. 15-04-2020/0021.The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162100690579
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100965906
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100550501
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/24/2021 case No. 16-04-2021/0026. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.


# 162100320964
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility, project documentation.


# 162100294384
Unscheduled inspection
Start date: 2021-06-23, end date: 2021-02-19, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such works with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 08/11/2020 case No.15-04-2020/0021, the objectives of this inspection are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 162100208586
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: 19
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 02/20/2021 case No. 17-04-2021/0009. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.


# 162100193878
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of completed works during the construction of a capital construction facility, project documentation


# 162100093128
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-14, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 02/20/2021 case No. 17-04-2021/0009. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.


# 162100035301
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 162100009318
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 162005271705
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-18, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 162005233429
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 162005199745
Unscheduled inspection
Start date: 2020-10-29, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004499847
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-08-28, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29072020 case 140420190010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004491606
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-21, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 14072020 case 120420200060 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004488881
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-21, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 11082020 case 150420200021 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004440211
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration:
Authority:
Purpose of inspection:


# 162004386707
Unscheduled inspection
Start date: 2020-04-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004398103
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-04-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 19042019 case 140420190010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004270689
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 19042019 case 140420190010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161904108275
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the process of reconstruction of the capital construction facility of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 28082019 case 1611201800023 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161904061640
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161903905775
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161903627669
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161903079918
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works, the construction materials used in the process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed reconstruction of the facility in accordance with the received by notification to the Inspection dated 23082019 7709 on the completion of the reconstruction of the capital construction facility, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161902898506
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902898572
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine whether the completed works used in the process of reconstruction of an object of capital construction of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 01042019 case 1611201800023 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities legal acts


# 161903008578
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-08-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161902870709
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 161902816838
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 161902752998
Unscheduled inspection
Start date: 2019-06-05, end date: —, duration:
Authority:
Purpose of inspection:


# 161902680068
Unscheduled inspection
Start date: 2019-05-08, end date: 2019-05-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections dated 11012019 case 1611201800022 The objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161902643254
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 01042019 case 1611201800023 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161902627734
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902519866
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Compliance with the instructions of the state control bodies supervision of municipal control bodies


# 161902468480
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 161902447523
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-01-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161802308824
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161802299390
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works, the construction materials used in the process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed reconstruction of the facility in accordance with the received by notification dated 11122018 9726 to the Inspection on the completion of the reconstruction of the capital construction facility, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility mandatory requirements and or requirements established by municipal legal acts


# 161802004442
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161802004522
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 24092018 case 1611201800021, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161802055019
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161802054902
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161801237802
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 161800341003
Unscheduled inspection
Start date: 2018-09-07, end date: —, duration:
Authority:
Purpose of inspection:


# 161800573569
Unscheduled inspection
Start date: 2018-07-27, end date: 2018-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 03052018 case 1611201800021, the tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161800424198
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-06-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the inspection program from 03052018 case 1611201800021, a warning as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation, compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800351565
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 28032018 1619007102, the deadline for which expired 30042018 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations of other works performed during the construction of the capital construction facility. regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800384417
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of the project documentation


# 161800308077
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the inspection program from 12032018 case 1611201800021, a warning as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800226099
Unscheduled inspection
Start date: 2018-03-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161800165098
Unscheduled inspection
Start date: 2018-02-28, end date: 2018-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170802966029
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170802821851
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-11-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of a notice received by the Inspection dated 24102017 8614 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time limit set by the regulation from 22092017 1219109601 to 25102017 Tasks The purpose of this audit is to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe object of this audit is to select the necessary fulfillment of the instructions of state control bodies supervision of municipal control bodies


# 16170802817434
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170802810787
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of a notice received by the Inspection dated 26102017 8669 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time period established by the regulation from 21092017 1719020801 to 29122017 prevention as well as detection and suppression of violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with the instructions of state control bodies, supervision bodies of municipal control


# 16170802674191
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170802249114
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 16170802244751
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701871795
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of an object of capital construction of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in in accordance with the inspection program dated 27112015 case 131120150087, the tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 16170701871513
Unscheduled inspection
Start date: 2017-08-15, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170701833983
Unscheduled inspection
Start date: 2017-07-28, end date: 2017-07-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170701659410
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170701723923
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701619885
Unscheduled inspection
Start date: 2017-05-25, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701450343
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration:
Authority:
Purpose of inspection:


# 16160601752635
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: the inspection is carried out in order to determine the compliance of the completed works and applied building materials during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. The tasks of this inspection are prevention as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is to verify the compliance of completed works with the requirements of technical regulations, other regulatory legal acts and project documentation


# 16160601771467
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The inspection is carried out in order to determine the compliance of the completed works and applied building materials during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer customer carrying out construction on the basis of a contract with the developer or the customer of violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations of other regulatory legal acts and design documentationthe subject of this audit is Compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation


# 16160601771586
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The inspection is carried out in order to determine the compliance of the completed works and applied building materials during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer customer carrying out construction on the basis of a contract with the developer or the customer of violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations of other regulatory legal acts and design documentationthe subject of this audit is Compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation


# 16160601747351
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-07-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation