Found 58 inspections:

# 002004289570
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the execution by a legal entity of a previously issued instruction on the elimination of violations hereinafter the Instruction during the construction reconstruction of a capital construction facility the deadline for which has expired the task of this audit is to establish the facts of the legal entity's fulfillment of the Prescription the subject of this audit is the execution by a legal entity of the Prescription


# 002004170798
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-01-20, duration: 1
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 002004155680
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated October 23, 2019 647G3320THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. The purpose of the audit is to comply with the instructions of the state control and supervision body.


# 001903764877
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001903716383
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-10-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated July 16, 2019 474G3320THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. laws and other regulatory legal acts


# 001903825041
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001903821254
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903038186
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-10, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated June 7, 2019 386G3320VNPPTHE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body


# 001902828145
Unscheduled inspection
Start date: 2019-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 001902484597
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-02-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 26112018 g 892G3320vnpp


# 001902503839
Unscheduled inspection
Start date: 2019-01-23, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001802023422
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-26, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 22082018 g 656G3320vnpp


# 00160601690344
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-25, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation of 18042016 165G3327K39


# 00160601564289
Unscheduled inspection
Start date: 2016-04-04, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 772100303784
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:


# 772100179353
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 772100177214
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-14, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100091797
Unscheduled inspection
Start date: 2021-03-29, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The inspection is carried out with the aim of: protecting the rights and interests of employees, in connection with the receipt of a salary appeal to the Inspectorate, upon dismissal. The objectives of the audit are: supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is: - compliance with mandatory requirements and (or) requirements established by municipal legal acts; - compliance of the information contained in the notification of the commencement of certain types of business activities with the mandatory requirements; - matching information. information contained in the application and documents of a legal entity or individual entrepreneur for granting legal status, special permission (license), granting permission (approval) to mandatory requirements, as well as information about these legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other federal information resources; - compliance with the instructions of state control bodies (supervision), municipal control bodies; - carrying out measures; - to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites (historical and cultural monuments) of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents of special importance historical, scientific, and cultural significance, which are part of the national library fund; - to prevent the occurrence of natural and man-made emergencies; - to ensure the security of the state; - to eliminate the consequences of causing such harm.


# 772100060499
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-03-29, duration: 4
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to monitor the implementation of the regulations of January 28, 2020. No. 40-G/3.3-20/ ex.o, dated March 4, 2020 No. 104-G/3.3-20/ ext.o, , dated September 3, 2020 No. 233-G/3.3-20/ ext.o. The objectives of this audit are: to monitor the measures taken by the legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban development activities during the construction and reconstruction of a capital construction facility.; taking measures to eliminate violations of mandatory requirements (if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts. The subject of the audit is compliance with the instructions of the state control (supervision) body


# 772100003473
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772005243506
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-04, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005178797
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-23, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004499788
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 772004448027
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772004470728
Unscheduled inspection
Start date: 2020-07-31, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:


# 772004434137
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-06-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004413811
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004382898
Unscheduled inspection
Start date: 2020-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 002004289570
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to control the execution by a legal entity of a previously issued instruction on the elimination of violations hereinafter the Instruction during the construction reconstruction of a capital construction facility the deadline for which has expired the task of this audit is to establish the facts of the legal entity's fulfillment of the Prescription the subject of this audit is the execution by a legal entity of the Prescription


# 772004228301
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004248127
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 002004170798
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-01-20, duration: 1
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 002004155680
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated October 23, 2019 647G3320THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. The purpose of the audit is to comply with the instructions of the state control and supervision body.


# 001904032172
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 771903978708
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 771903644984
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:


# 001903764877
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-09, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 771903847466
Unscheduled inspection
Start date: 2019-10-17, end date: —, duration:
Authority:
Purpose of inspection:


# 001903716383
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-10-23, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated July 16, 2019 474G3320THE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. laws and other regulatory legal acts


# 001903825041
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001903821254
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 001903038186
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-10, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is conducted in order to monitor the implementation of the regulation dated June 7, 2019 386G3320VNPPTHE objectives of this audit are to monitor the measures taken by the legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction of reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations compliance with the requirements of Federal laws and other regulatory legal acts7 The subject of verification is compliance with the instructions of the state control and supervision body


# 771902820071
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: The audit is conducted in order to Protect the rights and interests of employees in connection with the receipt by the Inspectorate of employee complaints 7771505919OB dated 08052019 about the violation of labor rights by the employer. The objectives of the audit are supervision and control over compliance with legislation and other regulatory legal acts containing labor law norms. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts. in the notification of the commencement of certain types of entrepreneurial activity, compliance with the mandatory requirements of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license permit approval with the mandatory requirements, as well as data on the specified legal entities and individual entrepreneurs contained in the unified state register of individual entrepreneurs and other federal information resources, compliance with the instructions of the authorities state control supervision of municipal control bodies carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund of the Russian Federation, documents of special historical significance, scientific and cultural significance included in the national library fund for the prevention of emergencies natural and man-made situations to ensure the security of the State and to eliminate the consequences of causing such harm


# 001902828145
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-05, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility, the deadline for which has expired, the task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the prescriptionthe subject of this audit is the execution of the Instruction on the elimination of identified violations


# 001902749680
Unscheduled inspection
Start date: 2019-06-14, end date: 2019-06-14, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility, the deadline for which has expired, the task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the prescriptionthe subject of this audit is the execution of the Instruction on the elimination of identified violations


# 001902771721
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-07, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of the regulation dated February 28, 2019 167G3320VNPPTHE objectives of this audit are to monitor the measures taken by a legal entity to comply with the regulation and comply with the mandatory requirements of legislation on urban development during the construction and reconstruction of a capital construction facility, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who have violated the requirements of Federal laws. laws and other regulatory legal acts7 The subject of the audit is the fulfillment of the instructions of the state control body.


# 361902650918
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-23, duration:
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: review of information from the Chief State Labor Inspector for Labor Protection Trubchaninov AV vh 36563219PV dated 09042019


# 001902484597
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-02-28, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 26112018 g 892G3320vnpp


# 001902503839
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-01-23, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the execution by a legal entity of a previously issued instruction on the elimination of violations during the construction reconstruction of a capital construction facility, the deadline for which has expired, the task of this audit is to establish the facts of the fulfillment of the non-fulfillment of the prescription The subject of this audit is the execution of the Instruction on the elimination of identified violations


# 001802023422
Unscheduled inspection
Start date: 2018-11-23, end date: 2018-11-26, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation from 22082018 g 656G3320vnpp


# 001800599959
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-22, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 22052018 343G3327Vno


# 471801950896
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection: THE Labor Code OF the Russian Federation


# 471801950691
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v Leningradskoi oblasti
Purpose of inspection:


# 77170802948288
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 31102017 74417217OB on issues of remuneration, registration and termination of an employment contract


# 00160701239026
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-19, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation dated 29022016 86G3327K39


# 00160601690344
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-25, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the regulation of 18042016 165G3327K39


# 00160601644799
Unscheduled inspection
Start date: 2016-06-06, end date: 2016-06-15, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to comply with the regulations and comply with the mandatory requirements of legislation on urban planning during the construction reconstruction of capital construction facilities, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory legal acts


# 00160601564289
Unscheduled inspection
Start date: 2016-04-04, end date: 2016-04-12, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken to ensure compliance by a legal entity with the mandatory requirements of legislation on urban planning during the construction reconstruction of capital construction facilities, preventing the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory acts legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.