# 001902444921
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-01-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 00170802771731
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-02, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 28072017 CH2767r srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah «4» «5» «9» «10» «11» «14» «15» predpisaniya ot 28072017 CH2767r Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe۷ vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzoraot 28072017 CH2767r
# 742100227304
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100207439
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-06-22, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100228971
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-06-22, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100151713
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the foundation. Installation of metal structures. Installation of roofing and wall corrugated sheets. Installation of doors and gates. Installation of equipment. Installation of electrical equipment. Installation of dry pipes. Installation of ventilation, plumbing, sewerage. Electrical installation works. Installation of power equipment. Installation of lightning protection and grounding. (during the execution of works) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100104851
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-11, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005196635
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po Sklad gotovoi produkcii montazhu tehnologicheskogo oborudovaniya v processe vypolneniya rabot blagoustroistvu territorii posle zaversheniya rabot soblyudeniyu protivopozharnyh i sanitarnoepidemiologicheskih meropriyatii i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742005235984
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed on the foundation Installation of metal structures Installation of roofing and wall corrugated board Installation of doors and gates Installation of PVC doors and windows Installation of equipment Installation of electrical equipment Installation of dry pipes Installation of ventilation of plumbing Electrical installation of power equipment Installation of lightning protection and grounding after completion of work and applied building materials during construction reconstruction of the capital construction as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005179658
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po Ustroistvo fundamenta Montazh metallokonstrukcii Montazh krovelnogo i stenovogo profnastila Montazh dverei i vorot Montazh PVH dverei okon Montazh oborudovaniya Montazh elektrooborudovaniya Montazh suhotrubov Montazh ventilyacii vodoprovoda kanalizacii Elektromontazhnye raboty Montazh silovogo oborudovaniya Raboty po montazhu i puskonaladke DAU Montazh molniezaschity i zazemleniya v hode vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742005172717
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004498200
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-09-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po Uzel priema zerna iz avtotransporta na odin proezd montazh vorotdvereiposle okonchrabotmontazh oborudovaniyaelektrooboriyav hode vyprabotZernoochistotdmontazh dvereiokonposle okonchrabot montazh oborudovaniyaelektrooboriyav hode vyprabotBunker othodov i bunker otgruzki v avtotransport1montazh vorot dvereiposle okonchaniya rabotmontazh oborudovaniyaelektrooborudovaniyasuhotrubovv hode vypolneniya rabotZernosushilkamontazh metallokonstrukciiposle okonchrabotmontazh dverei okonoborudovaniyaelektrooborudovaniyav hode vypolneniya rabotZernohranilische silosnogo tipamontazh metallokonstrukciidvereiokonoborudovaniyaelektrooborudovaniyaustroistvo fundamentav hode vypolneniya rabotBunker otgruzki v avtotransport2montazh elektrooborudovaniyav hode vypolneniya rabotEstakada konveiernayamontazh oborudovaniyaposle okonchaniya rabotmontazh elektrooborudovaniyav hode vypolneniya rabotPodsobnoe vspomogatelnoe pomescheniemontazh ograzhdkonstrukciivorotdvereimontazh elektrooborudovaniyaposle okonchaniya rabotmontazh ventilyaciivodoprovodakanalizaciiv hode vypolneniya rabotelektromontazhrabotymontazh silovogo oborudovaniyaraboty po montazhu i puskonaladke DAU i primenyaemyh stroitmaterialov v processe stroitelstva rekonstrukcii obekta kapstroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chch15152i153st48 Gradkodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chch38i39st49 Gradkodeksa i ili informmodeli v sluchae esli formirovanie i vedenie informmodeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradkodeksa v tch trebovaniyam energeteffektivnosti za isklobektov kapstroitelstva na kotorye trebovaniya energeteffektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapstroitelstva priborami ucheta ispolzh enerresursov2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradkodeksa RF
# 742004472071
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of enclosing structures made of sandwich panels with the installation of internal walls and partitions filling openings after completion of work finishing work installation of a lightning grid installation of technological equipment installation of a roof installation of elevators during the work installation of storm sewers K211 installation of electrical equipment installation of floors and used building materials during construction reconstruction of a capital construction facility as well as the results of such the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004484052
Unscheduled inspection
Start date: 2020-08-13, end date: 2020-08-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po Uzel priema zerna iz avtotransporta na odin proezd Montazh metallokonstrukcii posle okonchaniya rabot Montazh vorot dverei Montazh oborudovaniya Montazh elektrooborudovaniya v hode vypolneniya rabotZernoochistitelnoe otdelenieMontazh metallokonstrukcii posle okonchaniya rabot Montazh dverei okon Montazh oborudovaniya Montazh elektrooborudovaniya v hode vypolneniya rabotBunker othodov i bunker otgruzki v avtotransport 1Montazh metallokonstrukcii posle okonchaniya rabot Montazh vorot dverei Montazh oborudovaniya Montazh elektrooborudovaniya Montazh suhotrubov v hode vypolneniya rabotZernosushilkaMontazh metallokonstrukcii Montazh dverei okon Montazh oborudovaniya Montazh elektrooborudovaniya v hode vypolneniya rabotZernohranilische silosnogo tipaMontazh metallokonstrukcii Montazh dverei okon Montazh oborudovaniya Montazh elektrooborudovaniya v hode vypolneniya rabotBunker otgruzki v avtotransport 2Montazh oborudovaniya posle okonchaniya rabot Montazh elektrooborudovaniya v hode vypolneniya rabotEstakada konveiernayaMontazh oborudovaniya Montazh elektrooborudovaniya v hode vypolneniya rabotPodsobnoe vspomogatelnoe pomeschenieMontazh ograzhdayuschih konstrukcii vorot dverei Montazh elektrooborudovaniya Montazh ventilyacii vodoprovoda kanalizacii v hode vypolneniya rabotElektromontazhnye raboty Montazh silovogo oborudovaniya Raboty po montazhu i puskonaladke DAU 2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004475920
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the Warehouse of finished products, installation of technological equipment, installation of metal structures, installation of internal engineering networks, installation of integrated electrical equipment during the Pumping station, installation of electricity and electric lighting during the work, Landscaping during the work and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities which energy efficiency requirements do not apply to and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004449441
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004417590
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnoi plity PM5 na otm +26400 posle zaversheniya rabot ustroistvu monolitnoi plity PM6 na otm +31200 posle zaversheniya rabot ustroistvu monolitnoi plity PM7 na otm +36000 posle zaversheniya rabot montazhu metallokonstrukcii fahverka pod ograzhdayuschie konstrukcii posle zaversheniya rabot montazhu ograzhdayuschih konstrukcii iz sendvich panelei v processe vypolneniya rabot ustroistvu vnutrennih sten i peregorodok v processe vypolneniya rabot zapolneniyu proemov v processe vypolneniya rabot otdelochnym rabotam v processe vypolneniya rabot montazhu vnutrennih inzhenernyh setei v processe vypolneniya rabot ustroistvu krovli v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004404990
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004396725
Unscheduled inspection
Start date: 2020-04-24, end date: 2020-04-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnoi plity PM4 na otm +21600 posle zaversheniya rabot ustroistvu monolitnoi plity PM5 na otm +26400 v processe vypolneniya rabot montazhu kolonn K1 K117 na otm +26400 ustroistvu monolitnoi plity PM6 na otm +31200 v processe vypolneniya rabot montazhu kolonn K1 K84 na otm +31200 ustroistvu monolitnoi plity PM7 na otm +36000 v processe vypolneniya rabot montazh metallokonstrukcii fahverka pod ograzhdayuschie konstrukcii v processe vypolneniya rabot montazhu ograzhdayuschih konstrukcii iz sendvich panelei v processe vypolneniya rabot ustroistvu vnutrennih sten i peregorodok v processe vypolneniya rabot zapolneniyu proemov v processe vypolneniya rabot otdelochnym rabotam v processe vypolneniya rabot montazhu vnutrennih inzhenernyh setei v processe vypolneniya rabot montazhu tehnologicheskogo oborudovaniya v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004389986
Unscheduled inspection
Start date: 2020-03-26, end date: 2020-04-26, duration: 10
Authority: Upravlenie Federalnoi antimonopolnoi sluzhby po CHelyabinskoi oblasti
Purpose of inspection: detection of violations of part 1 of Article 11 of the Law on Protection of Competition
# 742004289784
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnoi plity PM4 na otm +21600 v processe vypolneniya rabot montazhu kolonn K1 K117 na otm +21600 ustroistvu monolitnoi plity PM5 na otm +26400 v processe vypolneniya rabot ustroistvu vnutrennih sten i peregorodok v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004236219
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004196939
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnoi plity PM2 na otm +12000 posle zaversheniya rabot ustroistvu monolitnoi plity PM3 na otm +16800 posle zaversheniya rabot montazhu kolonn K1K117 na otm +16800 ustroistvu monolitnoi plity PM4 na otm +21600 v processe vypolneniya rabot montazhu kolonn K1K117 na otm +21600 ustroistvu monolitnoi plity PM5 na otm +26400 v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741903966488
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu monolitnoi plity pola na otm 0000 i 1050 posle zaversheniya rabot ustroistvu monolitnoi plity PM8 na otm +3600 posle zaversheniya rabot ustroistvu monolitnoi plity PM9 na otm +4050 v processe vypolneniya rabot ustroistvu monolitnoi plity PM1 na otm +7950 v processe vypolneniya rabot montazhu kolonn K1 K131 na otm +7950 montazhu sten iz sendvich panelei v processe vypolneniya rabot montazhu vnutrennih inzhenernyh setei v processe vypolneniya rabot montazhu naruzhnyh vnutriploschadochnyh setei v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741904043712
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the Warehouse of finished products with the installation of a membrane roof in the process of work, the installation of a monolithic floor slab in the process of work, the installation of internal engineering networks in the process of work, the installation of external on-site networks and structures in the process of work, the Administrative building, the installation of external on-site networks and structures in the process of work, the pumping station, and construction work in the process of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904188641
Unscheduled inspection
Start date: 2019-12-17, end date: 2020-01-21, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Osuschestvleniya federalnogo gosudarstvennogo nadzora za soblyudeniem trudovogozakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo pravapo voprosam narusheniya trudovogo zakonodatelstva vsvyazi s postupleniem obrascheniya vh 747563019OB ot 10122019
# 741903958669
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903797287
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 the work at the Warehouse of finished products, the installation of the metal frame of the building after completion of installation of walling the walls of the sandwich after completion of installation of profiled sheeting of the roof after completion of the membrane roof in the process of work arrangement of monolithic floor slab after completion of the installation of technological equipment in the process of performance the installation of internal engineering networks in the process of performance the installation of external networks and structures in the process of work Administrativetools case the installation of external networks and structures in the process of performance Pump stroitelnomontazhnyh work in progress of works and construction materials used in the construction process of reconstruction of capital construction object as well as the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy ресурсов2 have permission to строительство3 fulfillment of the requirements of CC 23 and 31 ст52 Urban code
# 741903731745
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot ustroistvu fundamentnoi plity FP1 posle zaversheniya rabot ustroistvu monolitnoi plity pola na otm 0000 i 1050v processe vypolneniya rabot montazhu kolonn K1 K14 do otm +7950 ustroistvu monolitnoi plity PM8 na otm +3600 v processe vypolneniya rabot montazhu naruzhnyh vnutriploschadochnyh setei v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902988867
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902900204
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po armirovaniyu i betonirovaniyu fundamentnoi plity FP1 v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902900531
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902988357
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-09-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu fundamentnoi plity FP1 v processe vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902746376
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902720426
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 001902444921
Unscheduled inspection
Start date: 2019-01-24, end date: 2019-01-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 001801917919
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-12, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 001800473568
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 28072017 CH2767r srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 28072017 CH276r Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora ot 28072017 CH2767r
# 741800362304
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00170802771731
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-02, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 28072017 CH2767r srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah «4» «5» «9» «10» «11» «14» «15» predpisaniya ot 28072017 CH2767r Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe۷ vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzoraot 28072017 CH2767r
# 74170701600264
Unscheduled inspection
Start date: 2017-05-04, end date: 2017-06-02, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other normative legal acts containing norms of labor law on labor safety and other violations of labor legislation