Found 41 inspection:

# 412005296528
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-14, duration: 11
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: cel ocenka sootvetstviya obekta i svyazannyh s nim processov stroitelstva trebovaniyam bezopasnosti zadachi nastoyaschei proverki preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti i proektnoi dokumentacii pri stroitelstve obekta predmetom nastoyaschei proverki soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti sootvetstvie vypolnyaemyh rabot primenyaemyh stroitelnyh materialov i rezultatov takih rabot trebovaniyam proektnoi dokumentacii pri stroitelstve Obekta v chasti soblyudeniya poryadka osuschestvleniya stroitelnogo kontrolya zastroischika zakazchika


# 002004450750
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-10, duration: 2
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 662101108958
Unscheduled inspection
Start date: 2021-10-07, end date: 2021-10-20, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 422101250037
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-01-21, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel proverki - sootvetstvie vypolnyaemyh rabot, primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta (ustroistvo zemlyanogo polotna, dorozhnoi odezhdy, iskusstvennyh sooruzhenii, livnevoi kanalizacii, trotuarov, posadochnyh ploschadok avtobusnyh ostanovok, naruzhnogo elektroosvescheniya i elektrosnabzheniya, blagoustroistvo i ozelenenie), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii); zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422100688732
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-01-21, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel proverki - sootvetstvie vypolnyaemyh rabot, primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta (ustroistvo zemlyanogo polotna, dorozhnoi odezhdy, iskusstvennyh sooruzhenii, livnevoi kanalizacii, trotuarov, posadochnyh ploschadok avtobusnyh ostanovok, naruzhnogo elektroosvescheniya i elektrosnabzheniya, blagoustroistvo i ozelenenie), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii); zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 742100793804
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-09-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po ustroistvu fundamentov nasosnoi stancii 2-go podema, zdaniya rashodomerov i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 342100521818
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100521056
Unscheduled inspection
Start date: 2021-08-31, end date: 2021-09-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the GsK of the Russian Federation and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the GsK of the Russian Federation); b) the requirements for a construction permit; c) the requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; d) the requirements established by part 4 of Article 52 of the GsK of the Russian Federation, to ensure the conservation of a capital construction facility; e) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts.


# 422100522258
Unscheduled inspection
Start date: 2021-08-24, end date: 2021-01-21, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel proverki - sootvetstvie vypolnyaemyh rabot, primenyaemyh stroitelnyh materialov i izdelii v processe stroitelstva obekta (ustroistvo zemlyanogo polotna, dorozhnoi odezhdy, iskusstvennyh sooruzhenii, livnevoi kanalizacii, trotuarov, posadochnyh ploschadok avtobusnyh ostanovok, naruzhnogo elektroosvescheniya i elektrosnabzheniya, blagoustroistvo i ozelenenie), a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii (v tom chisle s uchetom izmenenii, vnesennyh v rabochuyu dokumentaciyu i yavlyayuschihsya v sootvetstvii s chastyu 1.3 stati 52 Gradostroitelnogo kodeksa RF chastyu takoi proektnoi dokumentacii); zadachei i predmetom nastoyaschei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 662100340135
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:


# 662100331830
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration:
Authority:
Purpose of inspection:


# 422100349316
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 002100231956
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-28, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: Cel: ocenka sootvetstviya obekta kapitalnogo stroitelstva (Kompleks mnogokvartirnyh domov v zhilom raione Primorskii goroda Vilyuchinska Kamchatskogo kraya) i svyazannyh s nim processov stroitelstva (rekonstrukcii) trebovaniyam bezopasnosti. Zadachi: preduprezhdenie, vyyavlenie i presechenie narushenii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti, v tom chisle tehnicheskih reglamentov (norm i pravil), i proektnoi dokumentacii pri stroitelstve (rekonstrukcii) obekta kapitalnogo stroitelstva. Predmet proverki: soblyudenie poryadka provedeniya stroitelnogo kontrolya, v tom chisle provedenie meropriyatii v sootvetstvii s p. 6 Polozheniya o provedenii stroitelnogo kontrolya, utverzhdennogo postanovleniem Pravitelstva RF ot 21.06.2010 № 468;.


# 342100250188
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-21, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100250353
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-21, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100226274
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-05-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po podgotovke territorii stroitelstva, razbivke trassy, ustroistvu fundamentov stancii vodopodgotovki i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.


# 422100205469
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel: proverka sootvetstviya vypolnennyh rabot i primenennyh stroitelnyh materialov v processe rekonstrukcii (demontazha, montazha oborudovaniya) gidrouzla i prokladke setei V1 na PK77+70 do V1-31, montazha i obvyazki kolodcev na vsem uchastke V1, blagoustroistvo territorii trebovaniyam proektnoi dokumentacii, proverki vypolneniya trebovanii chastei 2,3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii, v sootvetstvii s p.1 programmy provedeniya proverok№3, utverzhdennoi prikazom №78/05-OS ot 09.03.2021 pri stroitelstve obekta kapitalnogo stroitelstva – «Stroitelstvo vodoprovoda ot gidrouzla №7 do 3-mikroraiona i rekonstrukciya gidrouzla №7, Belovskii gorodskoi okrug Kemerovskoi oblasti», raspolozhennogo po adresu: Kemerovskaya oblast, Belovskii gorodskoi okrug, g. Belovo. Zadachi, predmet nastoyaschei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii v oblasti gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva obekta kapitalnogo stroitelstva.


# 342100102327
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-16, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100101455
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-16, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422100078330
Unscheduled inspection
Start date: 2021-04-26, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: verification of compliance of the work performed and the construction materials used in the course of work; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 002100051393
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-12, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: - cel: ocenka sootvetstviya obekta kapitalnogo stroitelstva i svyazannyh s nim processov stroitelstva, rekonstrukcii (nenuzhnoe zacherknut) trebovaniyam bezopasnosti, - zadachi nastoyaschei proverki: preduprezhdenie, vyyavlenie i presechenie narushenii zakonodatelstva RF o gradostroitelnoi deyatelnosti, v tom chisle tehnicheskih reglamentov, inyh normativnyh pravovyh aktov i proektnoi dokumentacii pri stroitelstve, rekonstrukcii (nenuzhnoe zacherknut) obekta. - predmetom nastoyaschei proverki: soblyudenie obyazatelnyh trebovanii zakonodatelstva RF o gradostroitelnoi deyatelnosti, sootvetstvie vypolnyaemyh rabot, primenyaemyh stroitelnyh materialov i rezultatov takih rabot trebovaniyam proektnoi dokumentacii pri stroitelstve obekta, v chasti soblyudeniya poryadka osuschestvleniya stroitelnogo kontrolya zastroischika


# 662100036599
Unscheduled inspection
Start date: 2021-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 422105289547
Unscheduled inspection
Start date: 2021-01-14, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 412005296337
Unscheduled inspection
Start date: 2020-12-30, end date: 2021-01-19, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection: cel ocenka sootvetstviya obekta i svyazannyh s nim processov stroitelstva trebovaniyam bezopasnosti zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti i proektnoi dokumentacii pri stroitelstve obekta predmet nastoyaschei proverki soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti sootvetstvie vypolnyaemyh rabot primenyaemyh stroitelnyh materialov i rezultatov takih rabot trebovaniyam proektnoi dokumentacii pri stroitelstve Obekta v chasti soblyudeniya poryadka osuschestvleniya stroitelnogo kontrolya zastroischika zakazchika


# 362005204829
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-11-06, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts


# 362005204855
Unscheduled inspection
Start date: 2020-10-27, end date: 2020-11-10, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts


# 362005204849
Unscheduled inspection
Start date: 2020-10-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:


# 342005168397
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-27, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 422005145080
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004481381
Unscheduled inspection
Start date: 2020-08-07, end date: 2020-08-12, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: cel proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva «g Kemerovo prosp Lenina na uchastke ot zhilogo doma 164 po prosp Lenina do prosp Komsomolskogo vklyuchaya perekrestok» raspolozhennogo po adresu Kemerovskaya oblast g Kemerovo yuzhnee zhilogo doma 164 po prosp Lenina yugovostochnee doma 164 po prosp Lenina Leninskogo raiona na peresechenii prosp Lenina i prosp Komsomolskii prosp Lenina kottedzhnyi poselok «Malenkaya Italiya» a takzhe rezultatov takih rabot perekladka vodoprovoda zaschita vodoprovoda i kanalizacii dorozhnaya odezhda po tipu 12 ustroistvo trotuarov avtobusnyh ostanovok i naruzhnogo osvescheniya svetofornyi obekt trebovaniyam normativnyh aktov i proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadachei proverki yavlyaetsya soblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti Predmetom proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti


# 002004450750
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-10, duration: 2
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations


# 422004711926
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-07-29, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: verification of the compliance of the work performed and the construction materials used, as well as the results of such work, with the requirements of the design documentation and verification of compliance with the requirements of Parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation The purpose of this audit is to comply with the legislation of the Russian Federation on urban planning activities during construction. The subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction


# 422004466376
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection:


# 422004446178
Unscheduled inspection
Start date: 2020-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 422004442304
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-06-30, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: proverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov zaschita vodoprovoda i kanalizacii vosstanovlenie gorlovin zaschita kabelnyh linii svyazi ustroistvo zemelnogo osnovaniya ustroistvo dorozhnoi odezhdy po tipu 1 ustroistvo livnevoi kanalizacii ustroistvo peresechenii i primykanii ustroistvo trotuarov tehnicheskih trotuarov ustroistvo avtobusnyh ostanovok ustroistvo naruzhnogo osvescheniya ustroistvo pitayuschei linii a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii i proverki vypolneniya trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadachei nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva Predmetom nastoyaschei proverki yavlyaetsya soblyudenie zakonodatelstva Rossiiskoi Federacii o gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004439220
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772004447895
Unscheduled inspection
Start date: 2020-06-30, end date: 2020-07-27, duration: 1
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Proverka provoditsya s celyu zaschity prav i interesov rabotnika v svyazi s Punktom 1 Porucheniya Zamestitelya predsedatelya Pravitelstva Rossiiskoi Federacii Golikovoi TA ot 27122019 TGP1211486 poruchenie rukovoditelya Federalnoi sluzhby po trudu i zanyatosti Ivankova MYU ot 24012020 3p Zadachami proverki yavlyayutsya nadzor i kontrol za soblyudeniem zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami sootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyam sootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursah vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya provedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe znachenie nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera po obespecheniyu bezopasnosti gosudarstva po likvidacii posledstvii prichineniya takogo vreda


# 422004347401
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-10, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Celproverka sootvetstviya vypolnyaemyh rabot i primenyaemyh stroitelnyh materialov v processe vypolneniya obschestroitelnyh rabot a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii proverki vypolneniya trebovanii chastei 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii Zadacha i predmetsoblyudenie trebovanii zakonodatelstva Rossiiskoi Federacii v oblasti gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva


# 422004202230
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903850301
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802768352
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-18, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: nadzora za vypolneniem predpisaniya po ustraneniyu narushenii trebovanii pozharnoi bezopasnosti ot 13072017g 3511 srok ustraneniya kotorogo istek


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.