Found 15 inspections:

# 222100329022
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Altaiskom krae
Purpose of inspection: Control over the execution by a legal entity or individual entrepreneur of a previously issued order to eliminate an identified violation of mandatory labor requirements, the deadline for which has expired, Letter from another State Labor Inspectorate No.22/3-401-21- PV dated 06/29/2021Ensuring the observance and protection of labor rights and freedoms of citizens, including the right to safe working conditions and compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 542100006851
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-15, duration: 1
Authority: Mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Sibiri i Dalnego Vostoka Rostehnadzora
Purpose of inspection: verification of the implementation of paragraph 1 of the previously issued to the audited legal entity Regulation No. 11/20-2020-Pr dated October 23, 2020, the deadline for which has expired


# 222004342148
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 222004342123
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-11, duration: 5
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in Notice 1 dated 14012020 bx 65VP59 dated 17012020 on the elimination of violations during construction, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation. The subject of this audit is pp 1 2 3 ch2 st54 GrK RF


# 222004394098
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-02, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: It is carried out in order to verify the information contained in Notice 5 dated 27032020 bx 62VP655 dated 27032020 on the elimination of violations specified in regulation 108GSN dated 11032020 based on the results of an inspection of a completed facility in the period from 04032020 to 11032020. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation. The subject of this audit is pp 1 2 3 ch2 st54 GrK RF


# 222004389327
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-02, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in Notice 1 of 20032020 bx 65VP603 of 23032020 on the elimination of violations specified in regulation 107GSN of 11032020 based on the results of an inspection of a completed facility in the period from 04032020 to 11032020, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation. The subject of this audit is pp 1 2 3 ch2 st54 GrK RF


# 222004278527
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority:
Purpose of inspection:


# 221903910960
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 221902899310
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-07-29, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the implementation of regulation 83 of 15072019 to Actu109 of 15072019, the objectives of this audit are to prevent identify and suppress violations of the law on urban development by the developer, including the requirements of project documentation7 The subject of this audit is ch2 st54 GRK RF verification of compliance with the performance of work and applied building materials during the construction of reconstruction of a capital construction facility as well as the results of such work the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221902860649
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-15, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice on the elimination of violations 3 dated 14062019 BX 62VP4230 dated 14062019 to Update 17052019, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation7 The subject of this audit is ch2 st54 GRK RF checking the compliance of work and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221902708491
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-17, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program 1 dated 13032017, the objectives of this inspection are to prevent identify and suppress violations of the law on urban development by the developer, including the requirements of project documentation7 The subject of this inspection is ch2 st54 GrK RF verification of compliance of work performed and construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221801698180
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-01, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice of completion of construction 1 dated 14092018 bx 31VP5033 dated 24092018, the objectives of this audit are to verify the completed construction of the facility, to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation 7 The subject of this audit is ch2 st54 GrK RF verification of compliance with the work and the construction materials used in during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221800974766
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-10, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program from 13032017, the objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, including project documentation. 7 The subject of this inspection is ch2 st54 GrK RF to verify the compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work with the requirements of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 221800399646
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-29, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the implementation of Regulation No. 14GSN dated 13042018 under Act No. 18GSN dated 13042018 and the implementation of the inspection program dated 13032017, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF checking the compliance of work performed and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations about the safety of buildings and structures


# 221800281414
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-13, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program from 13032017, the objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, including the requirements of technical regulations and project documentation. The subject of this inspection is ch2 st54 GrK RF to verify the compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.