# 002004297009
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription
# 001904043706
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription
# 001904020449
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of the prescription
# 001904021074
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-19, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of the prescription
# 001903848631
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-11, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 12092018 bn, including documents confirming the fulfillment of a previously issued prescription. The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development activities, including design documentationthe subject of this audit is compliance with mandatory requirements of legislation on urban development activities, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for energy resources used. The presence of a construction permit by persons carrying out construction of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903884143
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the order of the Volga Federal Technical Supervision Administration dated 07062019 430920192051 notification of elimination of violations
# 001903596858
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued order of the Volga Department of Rostechnadzor dated 23052019 43092019186 notification of the elimination of violations of bx39505c dated 23072019
# 001902717668
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-28, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 12092018, the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development including project documentation, the purpose of this audit is to note the necessary compliance with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work, with the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001802073958
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: order of the Deputy Chairman of the Government of the Russian Federation Khloponin AG dated 130218 AHP9771
# 162101439351
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the fact of execution of the order dated 02.02.2021 No. 12-12/0072-02, the deadline for which expired on 05.12.2021 and drawing up an act based on the results of the check.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies.
# 162101439252
Unscheduled inspection
Start date: 2021-12-09, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the notification received by the Inspection dated 03.12.2021 No. 13647 on the elimination of violations during construction, reconstruction of the capital construction facility, which were ordered to be eliminated within the period established by the regulation dated 01.12.2021 No.12-12/1180-01, until 12/27/2021.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out the reconstruction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies.
# 162101294891
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782100304191
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: 10
Authority: Severo-Zapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this review is:
- verification of the execution of the regulation dated 08.11.2019 No. 23-1083-6077-3074/PR-440
The objectives of this review are:
- monitoring compliance by legal entities (individual entrepreneurs) with the requirements of legislation on urban development, mandatory norms and rules;
- prevention, detection and suppression of violations of legislation on urban development, including project documentation.
The subject of this review is:
-compliance with the regulations of the state construction control (supervision) bodies
# 162105315691
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004447597
Unscheduled inspection
Start date: 2020-07-16, end date: 2020-07-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of execution of the order dated 27042020 1212036002, the deadline for which expired on 29062020 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations of other works performed during the construction of the capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 002004462842
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-08-13, duration: 20
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the fulfillment of the instruction from 30122019 23124471143593PR506 in accordance with the notice of elimination of violations from 19032020 4 The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including design documentationthe subject of this audit is to comply with the regulations state construction control and supervision bodies
# 162004396736
Unscheduled inspection
Start date: 2020-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004333499
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-31, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: control of the previously issued order dated May 29, 2019 42142 on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire
# 002004297009
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription
# 001904178172
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription from 11092019
# 001904102534
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-30, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 12092018 The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 161904031797
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 24092019 1212101401, the deadline for which expired on 25112019 and drawing up an act based on the results of the inspection, the tasks of this inspection are to prevent, as well as identify and suppress violations of compliance with technical regulations and other regulatory requirements carried out by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer The purpose of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 001904043706
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription
# 001904020449
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-18, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of the prescription
# 001904021074
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-19, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of the prescription
# 161903897196
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 001903848631
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-11, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 12092018 bn, including documents confirming the fulfillment of a previously issued prescription. The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development activities, including design documentationthe subject of this audit is compliance with mandatory requirements of legislation on urban development activities, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for energy resources used. The presence of a construction permit by persons carrying out construction of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903884143
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the order of the Volga Federal Technical Supervision Administration dated 07062019 430920192051 notification of elimination of violations
# 001903888221
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the order of the Volga Federal Technical Supervision Administration dated 07062019 430920192091
# 161903567724
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 11012019 1212000301, the deadline for which expired on 01092019 and drawing up an act based on the results of the inspection, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations and other normative legal acts and project documentation7 The subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 161903019590
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of fulfillment of the order dated 25042019 1212039702, the deadline for which expired 25082019 and drawing up an act based on the results of the inspection, the tasks of this inspection are to prevent, as well as identify and suppress violations of compliance with the requirements of technical regulations and other normative acts committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 001903598539
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the order of the Volga Region Department of 28062019 43092019233 notice of elimination of violations of bx40415c of 26072019
# 001903596858
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-09-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the previously issued order of the Volga Department of Rostechnadzor dated 23052019 43092019186 notification of the elimination of violations of bx39505c dated 23072019
# 161903030282
Unscheduled inspection
Start date: 2019-08-27, end date: 2019-09-23, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: The purpose of the audit is to protect the rights and interests of employees on the basis of ch7 st360 of the Labor Code of the Russian Federation Tasks of verification ensuring compliance with and protection of labor rights and freedoms of citizens ensuring compliance by the employer with labor legislation and other regulatory legal acts containing norms of labor law Subject to verification compliance with mandatory requirements or requirements established by municipal legal acts
# 001903392505
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of previously issued regulations by the state construction supervision authority
# 001902717668
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-28, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program from 12092018, the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development including project documentation, the purpose of this audit is to note the necessary compliance with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work, with the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001902866668
Unscheduled inspection
Start date: 2019-05-31, end date: 2019-06-28, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the order of the Volga Region Department of 25032019 notification of the elimination of violations
# 161902765547
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902634854
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-23, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in order to verify the fulfillment of regulation 23124476594153PR574 of 24122018, the deadline for which has expired, the objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression violations of the legislation on urban planning activities, including project documentation, The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 161902619628
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902468445
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-28, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: This inspection is carried out in order to control the previously issued order dated February 12, 2018 918 on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire, the objectives of this inspection are to monitor the implementation of the previously issued order dated February 12, 2018 918 on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire
# 161902314915
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161802221525
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 2111018 1219114701, the deadline for which expired on 05122018 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations and other regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 001802073958
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-06, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: order of the Deputy Chairman of the Government of the Russian Federation Khloponin AG dated 130218 AHP9771
# 161802041264
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 021800378203
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-18, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: this inspection is carried out in order to carry out an inspection to eliminate violations in accordance with regulation 5 of 06042018. The objectives of this inspection are to identify, prevent and suppress violations of legislation on urban development activities, including technical regulations and project documentation. The subject of this inspection is to comply with the instructions of state control bodies, supervision bodies of municipal control
# 161800384764
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 16032018 1219021701, the deadline for which expired 16052018 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations of other works performed during the construction of the capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 021800189053
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-04-06, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: for the purpose of conducting an inspection on the basis of the notification of JSC "Kazan Giproniiaviaprom" on the elimination of violations during the construction of a capital construction facility dated 26022018 without vx 3854 dated 27022018 on the execution of the prescription dated 17012018 1 the objectives of this inspection are to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies
# 161800177846
Unscheduled inspection
Start date: 2018-03-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 02170802990274
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: conducting an inspection on the basis of the notification of Kazansky Giproniiaviaprom JSC on the elimination of violations during the construction of a capital construction facility dated 01122017 1 vx 23596 dated 01122017 in compliance with the regulation dated 13102017 5
# 16170802840034
Unscheduled inspection
Start date: 2017-11-16, end date: 2017-11-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order from 04082017 1219088701, the deadline for which expired 04092017 and drawing up an act based on the results of the inspection, the tasks of this inspection are to prevent, as well as identify and suppress violations of compliance with technical regulations and other regulatory requirements carried out by the developer, the customer, the person carrying out reconstruction on the basis of an agreement with the developer or the customer legal acts and project documentation7 The subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 02170802366198
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-10-12, duration: —
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: conducting an inspection on the basis of a notice on the completion dates of works subject to inspection during the construction of a capital construction facility of Kazansky Giproniiaviaprom JSC dated 25082017
# 16170701840333
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701636574
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of an object of capital construction of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in in accordance with the inspection program from 04042017 case 161120150024 site 2 "drainage of rain and meltwater from the territory" nar livnev kanal site 4 "drainage of rain and meltwater from the territory" nar livnev kanal Galimardanov MM NAR and internal Power supply low-current Filippov VA systems Site 1 cleaning building stvod Fire protection mk fire alarm Barmin AK complex automation OV Zhirkov BB Barmin AK Site 2 checkpoint heating Zhirkov BB fire protection measures of the Barmin AK facility The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer the customer the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations other regulatory legal acts and project documentation performed during the construction of the capital construction facility The subject of this inspection is compliance with mandatory requirements
# 16170701636507
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701712714
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701619763
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of the capital construction facility of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in in accordance with the verification program, the prevention as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationcompliance with mandatory requirements
# 16170701528601
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order from 09032017 1219023801, the deadline for which expired 07042017 and drawing up an act based on the results of the inspection, the tasks of this inspection are prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory legal acts performed during the construction of the capital construction facility acts and project documentationthe subject of this inspection is the fulfillment of Inspection regulations
# 16170701423905
Unscheduled inspection
Start date: 2017-03-07, end date: 2017-03-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspection on the start of construction reconstruction of the capital construction facility dated 16022017 1243 The tasks of this inspection are prevention as well as detection and suppression of violations of conformity committed by the developer customer by a person carrying out construction on the basis of an agreement with the developer or customer performed during the construction of the facility capital construction works to the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements
# 16170701488290
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 18112016 1219120001, the deadline for which expired 17022017 and drawing up an act based on the results of the inspection, the tasks of this inspection are prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory legal acts performed during the construction of the capital construction facility acts and project documentation The subject of this inspection is the fulfillment of Inspection regulations
# 16160701131220
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of the capital construction facility of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in in accordance with the inspection program dated 03112016 case 121120160094, the tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements