Found 49 inspections:

# 772101207379
Unscheduled inspection
Start date: 2021-10-15, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100442126
Unscheduled inspection
Start date: 2021-08-12, end date: 2021-08-18, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100226489
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration:
Authority:
Purpose of inspection:


# 772100119538
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-09, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and the construction materials used in the process construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations identified during construction control and state construction supervision of compliance of completed works with the requirements of the design documentation


# 002004320033
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-05, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to verify the information received from the official motivated submission SL200622 dated February 26, 2020 on the conduct of mining operations by STROYMONTAZH LLC at 16 Shelepikhinskaya Embankment in Moscow in violation of industrial safety requirements. The objectives of this audit are to monitor the measures taken to ensure that a legal entity, an individual entrepreneur, complies with mandatory industrial safety requirements. prevention, detection and suppression violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of industrial safety mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and bringing to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts The purpose of this audit is to comply with mandatory requirements


# 771904133456
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 771903988958
Unscheduled inspection
Start date: 2019-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 771903840836
Unscheduled inspection
Start date: 2019-10-10, end date: —, duration:
Authority:
Purpose of inspection:


# 771903628707
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 77190803430392
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803424393
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803417818
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803404894
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 77190803371739
Unscheduled inspection
Start date: 2019-03-15, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803274508
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803167358
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-08-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771800537945
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: establishment of compliance of the licensee's license applicant with licensing requirements verification of information on the activities of the licensee's license applicant on the availability and condition of equipment tools technical means measuring instruments technical documentation and other objects used by the licensee to carry out the licensed type of activity on compliance of employees of the licensee's license applicant with licensing requirements compliance of information contained in the application and documents of a legal entity or individual entrepreneur on the provision of legal the status of a special permit license for the right to carry out certain types of activities or permit approval for other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities unified state register of legal entities the register of individual entrepreneurs and other federal information resources the condition of premises buildings structures technical means equipment and other facilities that are supposed to be used by the license applicant or licensee in the implementation of the licensed type of activity and the availability of employees necessary for the implementation of the licensed type of activity in order to assess the compliance of such facilities and employees with licensing requirements


# 77180803168210
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803148511
Unscheduled inspection
Start date: 2018-05-29, end date: 2018-06-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803089791
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-04-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802997647
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802948817
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802869832
Unscheduled inspection
Start date: 2017-11-21, end date: 2017-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802863234
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802651413
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802646069
Unscheduled inspection
Start date: 2017-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701909901
Unscheduled inspection
Start date: 2017-08-18, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701889859
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701791326
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701769033
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701722301
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701695781
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701772960
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701637167
Unscheduled inspection
Start date: 2017-05-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701537741
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701558964
Unscheduled inspection
Start date: 2017-04-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701466840
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701466838
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701454988
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701354018
Unscheduled inspection
Start date: 2017-02-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701372228
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701208615
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701206984
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701087745
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701087748
Unscheduled inspection
Start date: 2016-11-03, end date: 2016-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701040636
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate an identified violation of mandatory requirements. The objectives of this audit are to prevent identify and suppress violations of technical regulations and project documentation by the person being audited. The subject of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1002316 dated 23092016


# 77160700806404
Unscheduled inspection
Start date: 2016-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700483764
Unscheduled inspection
Start date: 2016-09-09, end date: 2016-10-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program, prevention of detection and suppression of violations of technical regulations and project documentation committed by the audited person, compliance of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for used energy resources


# 77160700791281
Unscheduled inspection
Start date: 2016-09-16, end date: 2016-09-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program The tasks of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.