# 772101280424
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-11-12, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with checking the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the maximum parameters of permitted construction, reconstruction of capital construction facilities established by the rules of land use and development, documentation on the planning of the territory, and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code, other federal laws; Subject of verification: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100939714
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100407786
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-17, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the inspection: to carry out control measures in connection with the verification of compliance with the order; The objectives of the inspection: prevention, detection and suppression of violations of the requirements for a construction permit and the requirements specified in the construction permit by the person being checked; The subject of the inspection: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100262481
Unscheduled inspection
Start date: 2021-05-26, end date: 2021-06-15, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: to carry out control measures in connection with the establishment of violations of the requirements for a construction permit and the requirements specified in the construction permit; Objectives of the audit: prevention, detection and suppression of violations of the requirements for a construction permit and the requirements specified in the construction permit by the person being audited; Subject of the audit: the presence of a permit for construction