Found 38 inspections:

# 342101451246
Unscheduled inspection
Start date: 2021-12-07, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of LLC "SZ "Peresvet — Yug" in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation and project documentation, b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.


# 342101388888
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of LLC "SZ "Peresvet — Yug" in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation and project documentation, b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation.


# 342101366450
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug Kvartal", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342101366358
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342101357478
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and approved project documentation. 7. The subject of this audit is compliance with: 1) the conformity of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by parts 2 and 3.1 of Article 52 of the GsK RF; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts


# 342101173523
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this review is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342101176859
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this review is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342101173380
Unscheduled inspection
Start date: 2021-10-07, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this review is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342101263488
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342101263820
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 342100441793
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100441738
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC Peresvet-Yug in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100508559
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation.


# 342100456255
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, technical regulations and project documentation; The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100347478
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100347447
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 342100347375
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 342100384370
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a) this inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (including changes made to working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK RF); 2) building permit requirements; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Civil Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Civil Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements to the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100384341
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100232321
Unscheduled inspection
Start date: 2021-05-25, end date: —, duration:
Authority:
Purpose of inspection:


# 342100143754
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-04-16, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, including technical regulations, and design documentation. Documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation


# 342100119618
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-11, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the facility with the requirements of the approved project documentation; The objective of this audit is to ensure that the facility meets the requirements of the approved design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of the approved design documentation.


# 342100090036
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in accordance with the inspection program received by the representative of the developer LLC "SZ"Peresvet-Yug", in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation; The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping the facility with metering devices for used energy resources; b) availability of a building permit; c) meeting the requirements set out in Parts 2.3 and 3.1 of art.52 of the Code.


# 342100090065
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: This inspection is carried out in accordance with the inspection program received by a representative of the developer LLC Peresvet-Region-Don in order to assess the compliance of activities carried out at the facility with the requirements of urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and project documentation.; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with the mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping the facility with metering devices for used energy resources; b) availability of a building permit; c) meeting the requirements set out in Parts 2.3 and 3.1 of art.52 of the Code.


# 342105313630
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-01-28, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation; The purpose of this inspection is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation.The subject of this audit is compliance with mandatory requirements regarding:a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the facility with metering devices used energy resources; b) availability of a construction permit; c) compliance with the requirements set out in Parts 2.3 and 3.1 of art.52 of the Code.


# 342105313560
Unscheduled inspection
Start date: 2021-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 342105305518
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-25, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, including The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation.The subject of this audit is compliance with mandatory requirements regarding:a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342005282116
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-30, duration: 11
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the conformity of the facility with the requirements of the approved design documentation b The objective of this audit is to ensure that the facility meets the requirements of the approved design documentation 7 The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works, their results and the building materials used with the requirements of the approved design documentation


# 342005283879
Unscheduled inspection
Start date: 2020-12-22, end date: 2021-01-27, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In connection with the receipt of notice reg 564 14122020 to the inspectorate on the completion of the construction of the facility in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and the requirements of project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and the requirements of project documentation. The purpose of this audit is to comply with mandatory requirements regarding the compliance of construction works with their results and applied construction materials requirements of the approved project documentation


# 342005234404
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-18, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program received by the representative of the developer LLC Peresvetyug in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and PD, the purpose of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationthe subject of this inspection is compliance with mandatory requirements in relation to the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a construction permit, compliance with the requirements established by hh 23 and 31st st52 of the Code


# 342005234374
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 342005191720
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-23, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the program of inspections to assess compliance activities conducted at the site to the requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project dokumentalistika of this review is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements provided for by parts 2 3 31 and articles


# 342005187908
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-27, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection and sanitary and epidemiological welfare of the population fire safety technical regulations and project documentation7 The objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation technical regulations and project documentation7 The subject of this audit is compliance with mandatory requirements in relation to compliance the execution of works and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2, 3, and 31 of Article 52 of the Urban Planning Code Russian Federation


# 342005178161
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-15, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program, in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation, the objective of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements regarding the compliance of work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation and the maintenance of an information model is mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by hh 23 and 31 of Article 52 of the Code


# 342005178077
Unscheduled inspection
Start date: 2020-10-09, end date: 2020-10-15, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the inspection program in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, fire safety requirements, including technical regulations and design documentation, the objective of this inspection is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this inspection is compliance with mandatory requirements in relation to the conformity of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation hereinafter referred to as the Code of Design Documentation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by hh 23 and 31 of the Code


# 342005178158
Unscheduled inspection
Start date: 2020-10-09, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342005178048
Unscheduled inspection
Start date: 2020-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 342005201182
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-25, duration: 20
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In connection with the receipt of the inspection notice reg 564 on the completion of the construction of the facility in 20102020 in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and the requirements of project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and the requirements of project documentation. The purpose of this audit is to comply with mandatory requirements regarding the compliance of construction works with their results and applied construction materials requirements of the approved project documentation