# 002004409337
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-05-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the audit program.
# 662100240207
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: 7
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie, vyyavlenie i presechenie narushenii pri osuschestvlenii meropriyatii po kontrolyu za soblyudeniem trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti.
# 742100225051
Unscheduled inspection
Start date: 2021-05-24, end date: 2021-06-21, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po Proverka zakonchennogo stroitelstvom obekta i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Proverka ispolneniya predpisaniya ot 09.04.2021g., srok ispolneniya 07.06.2021 3. Nalichie razresheniya na stroitelstvo. 4. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742100049392
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-04-07, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site
2. Availability of a building permit.
3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 002005280456
Unscheduled inspection
Start date: 2020-12-18, end date: 2020-12-28, duration: 7
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development
# 742005266165
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-31, duration: 9
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po po vynosu kollektora Igumenka 2d2000 mm ustroistvo obratnoi zasypki i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 002004494284
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-08-26, duration: 6
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the audit program.
# 002004409337
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-05-29, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the audit program.
# 742004197126
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-01-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya HP «KongressHoll» ranee vydannyh predpisanii ot 08112019 Sv5395r ot 31072019 Sv2977r ot 13082019 Sv3429r srok dlya ispolneniya kotorogo istekZadachei nastoyaschei vneplanovoi vyezdnoi proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisaniyah ot 08112019 Sv5395r ot 31072019 Sv2977r ot 13082019 Sv3429rPredmetom nastoyaschei vneplanovoi vyezdnoi proverki yavlyaetsyakontrol vypolneniya predpisanii organov gosudarstvennogo kontrolya nadzora ot 08112019 Sv5395r ot 31072019 Sv2977r ot 13082019 Sv3429r
# 742004214110
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Sootvetstvie vypolneniya rabot po montazhu kollektora ot Skvera Iskusstv do kollektora Igumenka vynosu kollektora Igumenka ustroistvu vrezki v suschestvuyuschuyu set i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741903992237
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903894395
Unscheduled inspection
Start date: 2019-10-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903925873
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-08, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the audit program.
# 741903925974
Unscheduled inspection
Start date: 2019-10-31, end date: 2019-11-08, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya HP «KongressHoll» ranee vydannogo predpisaniya ot 31062019 Sv2981r srok dlya ispolneniya kotorogo istek
# 741903773319
Unscheduled inspection
Start date: 2019-10-10, end date: 2019-10-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of the works on the installation of the collector from the Arts Square to the Igumenka collector with the removal of the Igumenka collector and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903132155
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka fakticheskogo sostoyaniya obekta kapitalnogo stroitelstva2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902908904
Unscheduled inspection
Start date: 2019-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902855587
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902855653
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Zadachei nastoyaschei vneplanovoi vyezdnoi proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 05032019 Sv957r
# 741902653419
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the audit program.
# 741902542132
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-05, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Zadachei nastoyaschei vneplanovoi vyezdnoi proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v predpisanii ot 12112018 Sv6054r
# 741802092926
Unscheduled inspection
Start date: 2018-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800858508
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-10-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800633095
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800587010
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po vrezke 6 v K11 vrezke 7 v K12 ustanovke betonnyh plomb i vyvedeniyu iz ekspluatacii ranee deistvuyuschih setei vosstanovleniyu blagoustroistva i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800488447
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu zhb kamer K11 K12 ustroistvu obratnoi zasypki na uchastke K11K13 ustroistvu vrezki 9 v KK8suschv tch almaznaya rezka susch truby v KK8susch ustroistvu betonnoi plomby v KK9susch demontazhu zaglushki d 1250mm v KK2susch d 1500mm v KK1susch i d1750mm v KK2’susch demontazhu vremennyh truboprovodov 5 4 d720mm a takzhe ns 4 2 vosstanovleniyu blagoustroistva i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800422799
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po razrabotke grunta na uchastke K4K13 ustroistvu vodoponizitelnoi sistemy na uchastke K4K13 ustroistvu zumpfov ustroistvu osnovaniya pod kollektor na uchastke K4K13 montazhu kollektora iz trub Korsis d 1600mm na uchastke K4K13 montazhu zhb kamery K13 i Knov ustroistvu obratnoi zasypki na uchastke K6K4 K4K13 K4KKsusch podgotovitelnym rabotam dlya vrezki 8 v KK6 susch i KK7 susch montazhu pnevmozaglushek d 1600 1 sht v K13 ustroistvu kanala mezhdu kamerami KK7susch i KK8susch almaznoi rezki susch truby d 1200mm kanala mezhdu kamerami KK7susch KK8 susch montazhu pnevmozaglushek d 1200mm 1sht v KK7 susch vklyucheniyu ns 1 dlya perekachki stokov po vremennym trubam 2d 720mm 1 montazhu pnevmozaglushek d 1000mm 1sht v K4 otklyucheniyu nasosov ns 2 v raione kanala KK10susch demontazhu zaglushek d 1500 mm v kanale u KK10susch ustroistvu vrezki 8 v KK6susch i KK7susch podgotovitelnym rabotam dlya vrezki 4 v KKsusch ustroistvu vremennogo truboprovoda 4 2d 700 mm nasosnoi stancii 41v raione KK1susch ustroistvu otverstii v susch trube d 1000 mm i betonnoi plomby v KKsusch ustroistvu vrezki 4 v KKsusch demontazhu pnevmozaglushek d 1000mm v KK12 susch d 1000 mm v K4 otkrytiyu shibernogo zatvora 2 v K8 demontazhu vremennyh truboprovodov 2 3 i 4 2d 720mm a takzhe nasosov i estancii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2Nalichie razresheniya na stroitelstvo 3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800434647
Unscheduled inspection
Start date: 2018-06-07, end date: 2018-07-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva 2Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800341893
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu zhb kamer K10 K9 i K8 montazhu shibernyh zatvorov 1 i 2 v kamere K8 v proektnoe polozhenie ustroistvu obratnoi zasypki na uchastke K10 i K8 ustroistvu osnovaniya pod kollektor na uchastke K8K1 montazhu kollektora iz trub Korsis d 1800mm na uchastke K8K1 montazhu zhb kamery K7 ustroistvu obratnoi zasypki na uchastke K8K1 K8K7 razrabotke grunta na uchastke K7K6 ustroistvu osnovaniya pod kollektor na uchastke K7K6 montazhu kollektora iz trub Korsis d 2000mm na uchastke K7K6 montazhu zhb kamery K6 montazhu kollektora iz trub Korsis d 2000mm na uchastke K8K3 montazhu zhb kamery K3 obratnoi zasypke na uchastke K8K3 ustroistvu vrezki 3 v K3 v tch almaznaya vrezka tehnolog okna v suschestvuyuschem tonnele v K3 montazhu zaglushki 3G1 v K3 almaznoi rezke stenki susch tonnelya podgotovitelnym rabotam dlya vrezki 2 v K2 v tch montazhu pnevmozaglushki d 1250mm 1sht v KK2susch montazhu vremennoi peregorodki iz blokov fbs v KK4 susch ustroistvu obratnoi zasypki na uchastke K7K6 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2Nalichie razresheniya na stroitelstvo 3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800401640
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po razrabotke grunta ustroistvu transhei ustroistvu zumpfov truboprovodov dlya otvoda vody osusheniyu kotlovanov ustroistvu betonnogo osnovaniya dyukerov ustroistvu betonnyh oboim dyukerov zasypke pazuh skalnym gruntom ustroistvu IZU iz skalnogo grunta i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800213172
Unscheduled inspection
Start date: 2018-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800028709
Unscheduled inspection
Start date: 2018-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800077159
Unscheduled inspection
Start date: 2018-02-28, end date: 2018-03-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po razrabotke grunta i demontazhu susch kanalizacionnyh kamer i kollektorov d 2000 mm d 1800 mm na uchastke KK14’KK5 montazhu kollektora iz trub Korsis d 2000 mm na uchastke KK14’KK3 Lobsch=894m v tch montazhu otvodov s ustroistvom kolodcev Korsis KK13 KK14 i KK14’ montazhu zhb kamer KK12 i KK3 ustroistvu vrezki 3 v KK3 v tch ustroistvo vremennogo truboprovoda 2 2d 700mm nasosnoi stancii dlya perekachki stokov montazhu pnevmozaglushek d 1800 mm 1 sht d 2000mm 2 sht v KK12 montazhu vremennogo shibernogo zatvora 24h24m v KK5susch ustroistvu vremennogo truboprovoda 3 2d 700mm nasosnoi stancii dlya perekachki stokov montazhu pnevmozaglushek d 1250mm 1sht v KK15susch i d 1200 mm 1sht v KK14 susch ustroistvu vrezki 9 v KK8 susch v tch montazh pnevmozaglushek d 1250mm 1sht v KK9susch razrabotke grunta i demontazhu susch kollektora d 1250 mm na uchastke KK2suschKK2 d 1500mm na uchastke KK1suschKK1 razrabotke grunta i demontazh susch kollektora d 1250 mm na uchastke KK15suschKK9susch d 1200mm na uchastke KK14suschKK9suschi primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2Nalichie razresheniya na stroitelstvo 3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF