# 00160701157284
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-16, duration: —
Authority: Ministerstvo zhilischnoi politiki Moskovskoi oblasti
Purpose of inspection: Execution of Regulations
# 772101399658
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 772101358183
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Conducting an inspection based on the completion notice No. P001-8899961188-52027188 dated 11/15/2021
# 772101207562
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: conducting an inspection based on the completion notice No. P001-8899961188-50625164 dated 07.10.2021.
# 772100897482
Unscheduled inspection
Start date: 2021-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100289333
Unscheduled inspection
Start date: 2021-06-22, end date: 2020-12-31, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Inspection based on the completion notice No. P001-8133083580-46091314 dated 06/07/2021
# 502005207441
Unscheduled inspection
Start date: 2020-11-02, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502005245423
Unscheduled inspection
Start date: 2020-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502005245413
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-17, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility Multi-apartment residential development with social engineering and transport infrastructure facilities at Moscow region Leninsky municipal district Bulatnikovskoye joint venture near Lopatino village 21st start-up complex residential building pos 33 with on-site engineering networks at Moscow region Leninsky district Lopatino
# 502005245385
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-17, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility "Multi-apartment residential development with social engineering and transport infrastructure facilities at Moscow region Leninsky municipal district Bulatnikovskoye joint venture near Lopatino 21st start-up complex residential building pos 31 with on-site engineering networks" at Moscow region Leninsky municipal district Bulatnikovskoye joint venture near Lopatino
# 502005230708
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502005216107
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502005153593
Unscheduled inspection
Start date: 2020-10-07, end date: 2020-10-29, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: inspection based on the notice of completion of construction P001990586213238778304 dated 21092020
# 502005233980
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502005195751
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-03, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction site Water control unit for the construction site at the address Moscow region Leninsky district rural settlement Bulatnikovskoye
# 502005195688
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502005195623
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004491618
Unscheduled inspection
Start date: 2020-08-04, end date: 2020-08-26, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Inspection based on the completion notice P001238649688136578369 dated 21072020
# 502004490970
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 502004484389
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502004791718
Unscheduled inspection
Start date: 2020-08-25, end date: 2020-09-16, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: inspection based on the notice of completion of construction P001384190322537318135 dated 17082020
# 502004840914
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-09-07, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility Multi-apartment residential development with social engineering and transport infrastructure facilities at Moscow region Leninsky municipal district Bulatnikovskoye joint venture near Lopatino village 20th start-up complex residential building pos 9 with on-site engineering networks at Moscow region Leninsky district Lopatino
# 502004833060
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 502004674025
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-09-07, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Conducting an inspection based on the notice of completion of construction P001526417239537017031 dated 06082020 assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility Multi-apartment residential building with social engineering and transport infrastructure facilities at Moscow region Leninsky municipal district Bulatnikovskoye joint venture near Lopatino village 20th start-up complex residential building pos 10 with on-site engineering networks at Moscow region Leninsky Lopatino ph
# 502004477193
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 001904065517
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-30, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: the real test is conducted to test indicated in the treatment of citizens of violations of requirements of the Law 214ФЗ regulatory legal acts of the President of the Russian Federation, normative legal acts of the government of the Russian Federation, normative legal acts of the authorized body of the acts of local self-government appeal raichenko DV 27641702 from 23112019 on 1 sheet the purpose of this inspection is compliance OOO "GRENELLE" requirements of legal acts regulating legal relations in the field of participatory strive railway and apartment or other real estate in the implementation of attracting gensrv citizens and legal entities for the purposes Stra railway at MO go g Balashikha Balashikha district 39 St Trubetskaya possession of a residential building 2B 3 4 5 6 poses 51 St Korolev MD Bolshevo d 20 2223 Moscow oblast g Korolev MD Bolshevo ul Field house 9 houses 13 14 15 16 1718 21 2930 GP poses at the 33rd Moscow region Korolev St MKR Bolshevo ul Polevaya, d 19 24 25 MO Lenin Mr SP of bulatnikovskoye of near the village Lopatino d 16 19 poses 7 8 9 10 31 32 33 34 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Maskall pH GP Mytishchi Mytishchi East Pogorelki d d 8 9 12 13 17 Subject to compliance OOO "GRENELLE" req h 2 St 1 and st18 19 20 21 Law 214ФЗ when strve railway at MO g Balashikha mkrn 39 St Trubetskaya possession of the railway 2B 3 4 5 6 poses 51 St Korolev MD Bolshevo d 20 2223 Moscow oblast g Korolev MD Bolshevo ul Field house 9 houses 13 14 15 16 1718 21 2930 GP poses at 33 MO go Korolev MD Bolshevo ul Polevaya, d 19 24 25 MO Lenin Mr SP of bulatnikovskoye of near the village Lopatino d 16 19 poses 7 8 9 10 31 32 33 34 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Maskall pH GP Mytishchi Mytishchi East Pogorelki d d 8 9 12 13 17 for the period from 2 кв2015 3 kV 2019
# 501904244611
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001644882661231561974 dated 04122019 within the framework of regulation 0764162400502 dated 25112019 with a deadline of up to 24012020 assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility "Intermediate sewage pumping station for storm drains" at the construction site "Multi-apartment residential development with social engineering and transport infrastructure facilities" in the Moscow region Leninsky municipal district of Bulatnikovskoye joint venture near Lopatino village"
# 501904243815
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001088746548231558177 dated 04122019 within the framework of regulation 0764162300502 dated 25112019 with a deadline of up to 24012020 assessment of the compliance of the work performed with the requirements of the design documentation at the capital construction facility "Intermediate sewage pumping station of household wastewater" at the construction site "Multi-apartment residential development with social engineering and transport infrastructure facilities" at the address Leninsky Moscow region municipal district of Bulatnikovskoye joint venture near Lopatino village"
# 501903911979
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501902869396
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 501802091527
Unscheduled inspection
Start date: 2018-11-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501801396389
Unscheduled inspection
Start date: 2018-08-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501801398174
Unscheduled inspection
Start date: 2018-08-16, end date: 2018-09-12, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the elimination of violations notification of the elimination of violations from 02082018 P001204537722714917350 within the framework of the instruction from 26072018 0764144900501 with a deadline of up to 26092018 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Multi-apartment residential development with social engineering and transport infrastructure residential pos162 launch complex 19 at the address Russian Federation Leninsky district Lopatino
# 501801394657
Unscheduled inspection
Start date: 2018-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501800426954
Unscheduled inspection
Start date: 2018-05-30, end date: 2018-06-27, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order dated 22032018 0461124000502 with a deadline of 22052018 notification of the elimination of violations P001816466798213135433 dated 21052018
# 501800462645
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-06, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the fulfillment of the instruction from 07032018 0764138800502 on the notification of the elimination of violations of the requirements of technical regulations and project documentation from 24042018 R001946350376712580168 assessment of the compliance of the work performed with the requirements of technical regulations and project documentation at the capital construction Multi-apartment residential building with social engineering and transport infrastructure facilities 1st stage of construction Residential building of the 3rd stage pos 15 with on-site engineering networks for address Moscow region Leninsky district Lopatino
# 50170802983932
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-25, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the elimination of violations notification of the elimination of violations dated 20112017 P00165431807739442170 within the framework of the regulation dated 13112017 0764125218501 with a deadline of 13122017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Multi-apartment residential development with social engineering and transport infrastructure facilities 1st stage of construction 2nd stage Residential building 30 at the address Moscow region Leninsky municipal district Bulatnikovskoye rural settlement near Lopatino village
# 50170802984026
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-25, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the elimination of violations notification of the elimination of violations dated 20112017 P00159370382629439554 within the framework of the regulation dated 13112017 0764141500501 with a deadline of 18122017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility "Multifunctional residential development with social engineering and transport infrastructure facilities at the address Moscow region Leninsky municipal district Bulatnikovskoye rural settlement near Lopatino 1st construction stage 3, stage 19, according to the general plan, 710-storey 4-section residential building" at the address Moscow region Leninsky district Bulatnikovskoye joint venture near Lopatino
# 50170802954319
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 50170701855053
Unscheduled inspection
Start date: 2017-08-10, end date: —, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection:
# 50170701893346
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-04, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the fulfillment of regulation 0764142900502 dated 21062017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Sewage pumping station for domestic wastewater at the address Moscow region Leninsky district Bulatnikovskoye joint venture near the village of Lopatino
# 50170701711504
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-21, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the fulfillment of regulation 0764142900501 dated 17052017 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Sewage pumping station for domestic wastewater at the address Moscow region Leninsky district Bulatnikovskoye joint venture near the village of Lopatino
# 50170701614008
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-17, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the instructions of the IO head of the Basenin AE Main Directorate official note from the head of ONzS 7 Zvereva VF dated 03052017 verification of the availability of permits and design documentation for the capital construction facility Sewage pumping station for domestic wastewater at the address Moscow region Leninsky district Bulatnikovskoye joint venture near the village of Lopatino
# 50160701237808
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-10, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of compliance with regulation 0764125212502 dated 10102016 assessment of compliance of work performed with the requirements of technical regulations and design documentation at the capital construction facility Multi-apartment residential building with social engineering and transport infrastructure facilities 1st stage of construction 2nd stage Residential building 25 according to the general plan with on-site engineering networks at the address Moscow region Leninsky district Bulatnikovskoye joint venture near Lopatino village
# 50160701220623
Unscheduled inspection
Start date: 2016-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160701157284
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-16, duration: —
Authority: Ministerstvo zhilischnoi politiki Moskovskoi oblasti
Purpose of inspection: Execution of Regulations
# 50160701279924
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50160701279829
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-11-02, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Verification of the fulfillment of regulation 0764125215502 dated 30092016 assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Multi-apartment residential building with social engineering and transport infrastructure facilities 1st stage of construction 2nd stage Residential building 23 at the address Moscow region Leninsky district Bulatnikovskoye joint venture near the village of Lopatino
# 50160601740610
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-22, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Moskovskoi oblasti
Purpose of inspection: control over the fulfillment of a previously issued prescription