Found 17 inspections:

# 742100590204
Unscheduled inspection
Start date: 2021-09-08, end date: 2021-09-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of the power supply system (after completion of work), finishing work (after completion of work). Verification of fire-fighting, sanitary and epidemiological measures and landscaping of the territory and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100368783
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-07-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the installation of enclosing structures and roofs (after completion of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100226289
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 742100151624
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 02/26/2021, due on 03/29/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100104710
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-04-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the works on the installation of enclosing structures: installation of sandwich panels, masonry walls (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105352699
Unscheduled inspection
Start date: 2021-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 742004461497
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742004436253
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802707922
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802350867
Unscheduled inspection
Start date: 2017-09-15, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701828468
Unscheduled inspection
Start date: 2017-08-01, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701656714
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701563796
Unscheduled inspection
Start date: 2017-04-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701401147
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work bricklaying walls finishing works installation of ventilation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation


# 74170701277012
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of basement beams enclosing structures floor slabs mk radiator platforms bricklaying walls finishing work installation of underlying layers of rough floors and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 art 52 of the Urban Planning Code of the Russian Federation


# 74160701184216
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of basement beams enclosing structures floor slabs mk radiator platforms installation of foundations of the MK overpass external water supply and sewerage networks Installation of an external supply gas pipeline and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of h 23 art 52 of the Urban Planning Code of the Russian Federation


# 74160701028290
Unscheduled inspection
Start date: 2016-10-24, end date: —, duration:
Authority:
Purpose of inspection: