# 422101441843
	
Unscheduled inspection
	
Start date: 2021-12-09, end date: 2021-12-17, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: This inspection is carried out in order to verify the conformity of the work performed and the construction materials and products used during the construction of the facility (concrete preparation device for the slab, foundation plate, metal frame (blocks A and B), fire protection of the metal frame and wooden arches, partitions, floor slabs, floors, interior decoration, sports equipment coverings of the main arena, prefabricated railway stands, fencing of boxes, bricklaying of walls, installation of monolithic elevator shafts, stairs, roofs, exterior decoration, installation of stained glass windows, porches, descents in the technical field, installation of elevators, power equipment, heating, electric lighting, plumbing, sports lighting and sound, ventilation, heat- and cold supply, installation of a swimming pool, installation of automatic gas fire extinguishing, automation of heating units, hot water and heat supply systems, hall climate, low-current systems, a complex of safety systems, an aspiration system, a fire alarm system, landscaping (vertical layout, filling)), as well as the results of such work to the requirements of the design documentation (including taking into account the changes made to the working documentation and which are in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, the task of this audit is to comply with the legislation of the Russian Federation on urban planning activities during construction, the subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities.
	# 422101331458
	
Unscheduled inspection
	
Start date: 2021-11-16, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422100848464
	
Unscheduled inspection
	
Start date: 2021-09-17, end date: 2021-10-15, duration: 20
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: Purpose, Hadachi, Subject name
	# 422100809675
	
Unscheduled inspection
	
Start date: 2021-09-20, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422100270227
	
Unscheduled inspection
	
Start date: 2021-06-15, end date: —, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: in order to verify the conformity of the work performed and the building materials used during the construction of the facility (installation of a metal frame, a fire protection device for the frame, partitions, floor slabs (block B), flooring, prefabricated railway stands, monolithic elevator shafts, profiled floors, stairs, surfaced roof, foundation and coating "Riverclack 55", stained glass windows, bricklaying walls, installation of power electrical equipment, plumbing work, installation of heating points, ventilation, heat and cold supply, installation of automatic gas fire extinguishing systems, heating units, hot water and heat supply systems, installation of low-current systems, fire alarm systems, AUPT, various works), as well as the results of such work requirements project documentation, verification of compliance with the requirements of Parts 2, 3, 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; the task and subject of this audit is compliance with the legislation of the Russian Federation on urban planning activities during construction
	# 422100270176
	
Unscheduled inspection
	
Start date: 2021-06-07, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422100141897
	
Unscheduled inspection
	
Start date: 2021-04-15, end date: 2021-05-14, duration: 20
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: the purpose is to verify the compliance of the completed works and the construction materials used during the construction process, as well as the results of such work with the requirements of the design documentation, to verify compliance with the requirements of parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; The purpose of the audit is to determine the compliance of the constructed capital construction facility with the requirements of the design documentation; The subject of this audit is:
 compliance with the legislation of the Russian Federation on urban planning activities during construction
	# 422100051782
	
Unscheduled inspection
	
Start date: 2021-03-22, end date: —, duration: —
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: 
	# 422005255976
	
Unscheduled inspection
	
Start date: 2020-12-10, end date: 2020-12-25, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: in order to verify the compliance of the work performed and the building materials used during the construction of the facility, the device of concrete preparation for the base plate of the monolithic reinforced concrete grillwork abutments below otm 0000, the installation of the frame, the device of puffs, the gravy for columns, as well as the results of such work with the requirements of the design documentation, the verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation, the task and subject of this The purpose of the audit is to ensure compliance with the legislation of the Russian Federation on urban planning activities during construction
	# 422005270026
	
Unscheduled inspection
	
Start date: 2020-11-19, end date: —, duration: —
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: 
	# 422005154561
	
Unscheduled inspection
	
Start date: 2020-10-01, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422005189991
	
Unscheduled inspection
	
Start date: 2020-10-22, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422004481622
	
Unscheduled inspection
	
Start date: 2020-08-13, end date: —, duration: —
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: 
	# 422004443465
	
Unscheduled inspection
	
Start date: 2020-07-02, end date: 2020-07-29, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation and other regulatory acts to verify compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation. The purpose of this audit is to comply with the legislation of the Russian Federation on urban planning activities during construction. The subject of this audit is compliance with the legislation of the Russian Federation about urban planning activities
	# 422004438856
	
Unscheduled inspection
	
Start date: 2020-06-19, end date: 2020-06-30, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: the purpose of verifying the conformity of the work performed and the building materials used during the construction of the Kuzbass Ice Palace capital construction facility located at 12 Pritomsky Avenue, Kemerovo, Kemerovo Region, as well as the results of such work is the installation of metal structures fire protection of metal structures overlap device installation of arches covering the ice field including fire protection roofing device masonry exterior and interior installation of stained glass windows and exterior facade decoration installation of doors external water supply networks sewerage heat supply stormwater drainage pool installation of heating and air heating systems installation of the foundation of a refrigeration unit installation of transformer substations KTP and outdoor networks various works to meet the requirements of design documentation and verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation The task of verification is compliance with the requirements of the legislation of the Russian Federation The subject of this audit is compliance with the mandatory requirements of the legislation of the Russian Federation on urban development
	# 422004411020
	
Unscheduled inspection
	
Start date: 2020-05-21, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 422004387865
	
Unscheduled inspection
	
Start date: 2020-04-13, end date: 2020-04-21, duration: —
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: the purpose of verifying the compliance of the work performed and the building materials used during the construction of a capital construction facility with the requirements of the design documentation and in order to verify compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the task and subject of this audit is compliance with the requirements of the legislation of the Russian Federation on urban planning activities during construction
	# 422004251382
	
Unscheduled inspection
	
Start date: 2020-02-06, end date: 2020-02-14, duration: 7
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation and verification of compliance with the requirements of parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation The task and subject of this audit is compliance with the requirements of the legislation of the Russian Federation on urban planning
	# 421904061229
	
Unscheduled inspection
	
Start date: 2019-12-11, end date: 2019-12-24, duration: —
	
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
	
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning