Found 21 inspection:

# 022105297506
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection:


# 022005160242
Unscheduled inspection
Start date: 2020-10-07, end date: 2020-11-05, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: Based on the notice of completion dates for works subject to inspection during construction reconstruction and major repairs of a capital construction facility dated 21092020 BN BX 23529 dated 21092020, the objectives of this inspection are to identify, prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts


# 362101293699
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This check is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed, reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction (reconstruction) of the capital construction facility. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer. The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 742100771318
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-19, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100384348
Unscheduled inspection
Start date: 2021-08-11, end date: 2021-09-07, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100337968
Unscheduled inspection
Start date: 2021-07-13, end date: 2021-07-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Matching performance of works on installation of reinforced concrete slabs and in-situ plots after the actual completion of the work, installation of exterior sandwich panels after the actual completion of the work, the installation of internal partitions built premises and ABA in the axes 1-17/R-N, 1-5/A-K, 1-3/K-N device partitions of sandwich panels in the axes 1-17/R-N, 1-5/A-K 1-3/K-N device fire walls ABK of sandwich panels in the axes 1-17/N execution of works on the device of the roof after the actual completion of the work assembling the outer gates and Windows after the actual completion of the work with the device of floors in the axes 5-17/A-B, 5-13/V-W, 5-17/N-R, 1-5/A And landscaping on the site development, except for the plot down the line R the installation of internal engineering networks axes 1-17/R-N compliance with fire protection measures in the axes 1-17/N-R installation of external engineering networks after the actual completion of the work finishing in the axes 1-17/N-And fire protection of metal and concrete structures in the axes 1-17/N and construction materials used in the process of construction, reconstruction of capital construction object, as well as the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of this Code project documentation (including changes included in the project documentation in accordance with paragraphs 3.8 and 3.9 of article 49 of the Code) and (or) information model (in the case that the formation and maintenance of information models are required in accordance with the requirements of this Code), including the requirements for energy efficiency (with the exception of capital construction objects, for which the energy performance requirements do not apply) and the requirements of the equipment of a capital construction object metering devices of energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 022100064917
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-04-07, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: for the purpose of: on the basis of the notice on the elimination of violations during the construction and reconstruction of the capital construction facility of JSC National Logistics Technologies dated 03.03.2021 No. 1/u (ex. No. 5302 dated 05.03.2021; the objectives of this audit are: identification, prevention and suppression of violations of legislation on urban development, including technical regulations and project documentation; the subject is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies


# 232100044022
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-30, duration: 20
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: Purpose: implementation of the inspection program dated September 23, 2020 (notice of completion of construction and reconstruction of capital construction facility No. 4 dated February 20, 2021 (Exhibit No. 2305 dated February 24, 2021).; tasks: prevention, identification and suppression of violations committed by the developer, the technical customer, as well as the person carrying out the construction on the basis of an agreement with a developer or a technical customer (contractor), violations of legislation on urban planning activities, including project documentation; subject of the KNM: compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 742105354264
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of metal structures of the canopy, installation of metal structures of the floor frame of the production area, installation of reinforced concrete slabs and monolithic sections during the work, installation of sandwich panels during the work and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), in including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 362105330336
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 022105297506
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-05, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The inspection is carried out for the following purposes: on the basis of a notice on the completion dates of works subject to inspection during construction and reconstruction of a capital construction facility dated 12/23/2020 No. 1 (ex. No. 31940 dated 12/25/2020); The objectives of this audit are: to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation; the subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 242005243088
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority:
Purpose of inspection:


# 742005239124
Unscheduled inspection
Start date: 2020-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 272005281923
Unscheduled inspection
Start date: 2020-12-25, end date: —, duration:
Authority:
Purpose of inspection:


# 272005176198
Unscheduled inspection
Start date: 2020-10-22, end date: 2020-11-19, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of the capital construction facility dated 28092020 bn BX 4898 dated 28092020the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including design documentationthe subject of the inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility construction as well as the results of such work to the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 022005160242
Unscheduled inspection
Start date: 2020-10-07, end date: 2020-11-05, duration: 20
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: Based on the notice of completion dates for works subject to inspection during construction reconstruction and major repairs of a capital construction facility dated 21092020 BN BX 23529 dated 21092020, the objectives of this inspection are to identify, prevent and suppress violations of legislation on urban development activities, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements or requirements established by municipal legal acts


# 232005179213
Unscheduled inspection
Start date: 2020-10-14, end date: —, duration:
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection:


# 742004465392
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 242004434619
Unscheduled inspection
Start date: 2020-06-16, end date: 2020-06-30, duration: 11
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program from 300-42020 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design documentation7 The subject of this audit is71 Verification of the compliance of the work performed and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used72 Compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation73 Verification of a building permit


# 272004414356
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program for the Facility dated 1701-2020the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including project documentation. The purpose of the inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation. documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources


# 272004229261
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


Information about inspections