Found 23 inspections:

# 002105297670
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005232135
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-04, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection shall be conducted for the purpose of execution of the Program inspections approved by the Deputy head of the Siberian Department of Rostechnadzor by Pleshivtseva AA from 30082019 g Objectives of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of an agreement with the developer or the owner, the contractor violations of the legislation on town-planning activities including project documents the Subject of this review is to check the compliance of contractors and construction materials used in the process of reconstruction of capital construction object "Production of air separation products Kemerovo oblast Novokuznetsk g Cosmic highway" at Russian Federation Kemerovo oblast Novokuznetsk city district g Novokuznetsk Factory area of road Space structure 26 and the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 3_8 and 3_9 article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the requirements for energy efficiency does not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of the town planning code of the Russian Federation


# 002004493908
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-09-01, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019bnthe objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the process of reconstruction of the capital construction facility "Integrated development of the Mezhdurechensktayshet section of the Krasnoyarsk railway Construction of second tracks on the Mezhdurechenskkaraj stage 1 Construction of the second track" as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices the energy resources used, the availability of a building permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004368935
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004237643
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001904100353
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev bn, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the compliance of the work performed and the applied construction materials and results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work on project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices energy resources used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903935867
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the BN Inspection Program from 30082019 approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903839658
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 422100015380
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-02-18, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the implementation of the instruction of the Siberian Rostechnadzor Department dated 09/20/2019 No. 25-04-258/1 on the elimination of identified violations, the deadline for which has expired. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). The subject of this audit is the fulfillment of the instructions of the federal state construction supervision authorities.


# 002105297670
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out on the basis of the Notice of Air Liquid Kuzbass LLC on the completion of the construction of the capital construction facility dated December 23, 2020 No. 3-20 (ex.No. 340/31883 dated December 24, 2020). The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out capital construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor). The subject of this audit is to verify the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility "Production of air separation products, Kemerovo region, Novokuznetsk, Kosmicheskoe Highway" at the address: Russian Federation, Kemerovo region, Novokuznetsk city district, Novokuznetsk, Zavodskoy district, Kosmicheskoe Highway, building No. 26, and as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of information models are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements set out in parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422005259933
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority:
Purpose of inspection:


# 002005232135
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-04, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection shall be conducted for the purpose of execution of the Program inspections approved by the Deputy head of the Siberian Department of Rostechnadzor by Pleshivtseva AA from 30082019 g Objectives of this review are to prevent detection and suppression approved developer by the customer and a person engaged in construction on the basis of an agreement with the developer or the owner, the contractor violations of the legislation on town-planning activities including project documents the Subject of this review is to check the compliance of contractors and construction materials used in the process of reconstruction of capital construction object "Production of air separation products Kemerovo oblast Novokuznetsk g Cosmic highway" at Russian Federation Kemerovo oblast Novokuznetsk city district g Novokuznetsk Factory area of road Space structure 26 and the results of such work requirements approved in accordance with parts 15 and 15_2 15_3 of article 48 of the town planning code of the Russian Federation project documentation to reflect changes made to the project documentation in accordance with paragraphs 3_8 and 3_9 article 49 of the town planning code of the Russian Federation or of the information model in the case of the formation and maintenance of information models are required in accordance with the requirements of the town planning code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the requirements for energy efficiency does not apply and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of the town planning code of the Russian Federation


# 422005199760
Unscheduled inspection
Start date: 2020-11-06, end date: 2020-11-10, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose of checking the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used. The task of checking is to determine the compliance of the constructed facility with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for regarding the equipment of the capital construction facility with metering devices for used energy resources, the subject of verification is compliance with the requirements of the legislation of the Russian Federation in the field of urban planning


# 002004493908
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-09-01, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019bnthe objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor. The purpose of this inspection is to verify the compliance of the work and the construction materials used in the process of reconstruction of the capital construction facility "Integrated development of the Mezhdurechensktayshet section of the Krasnoyarsk railway Construction of second tracks on the Mezhdurechenskkaraj stage 1 Construction of the second track" as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Development Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Development Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices the energy resources used, the availability of a building permit, the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004414302
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-11, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev bn, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor, including project documentation. The subject of this inspection is the compliance of the work and the construction materials used and the results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work in the design documentation, including energy efficiency requirements and equipment requirements for the capital construction facility accounting for the energy resources used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004368935
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-10, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev bn, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor, including project documentation. The subject of this inspection is the compliance of the work and the construction materials used and the results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work in the design documentation, including energy efficiency requirements and equipment requirements for the capital construction facility accounting for the energy resources used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004237643
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019bnthe objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or customer contractor, including project documentation. The subject of this inspection is the compliance of the work performed and the applied construction materials and results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices energy resources used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001904100353
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev bn, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the compliance of the work performed and the applied construction materials and results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work on project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices energy resources used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421903928976
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001903935867
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the BN Inspection Program from 30082019 approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices used availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421903709934
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001903839658
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-30, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the conformity of the work performed and the construction materials used and the results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work on design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy consumption resources availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903384063
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to implement the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, dated 30082019. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The subject of this inspection is the conformity of the work performed and the construction materials used and the results during the construction of the capital construction facility "Production of air separation products Kemerovo region Novokuznetsk Kosmicheskoe Shosse" at the address of the Russian Federation Kemerovo region Novokuznetsk city district Novokuznetsk Zavodskoy district highway Kosmicheskoe shosse 26, as well as the results of such work on design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy consumption resources availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation