Found 100 inspections:

# 002004369297
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-04-24, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this audit is conducted in order to exercise state control over the fulfillment by a legal entity of the instruction of the Territorial Department of the State Highway Supervision for the Magadan Region dated 21022020 134203 on the elimination of violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport, the deadline for which expires on 0401-2020. The objectives of this audit are to monitor the elimination of previously identified violations specified in the regulation


# 002004246299
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-26, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This audit is conducted in order to carry out state control over the compliance of a legal entity with regulatory legal acts regulating activities in the field of motor transport


# 001902991046
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-27, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this audit is conducted in order to exercise state control over the implementation by a legal entity of the instruction of the Territorial Department of the State Highway Supervision in the Magadan Region dated 03062019 025111 on the elimination of violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport, the deadline for which expires on 01092019


# 001902889617
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 001902889859
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902889660
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 001902889587
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902876712
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 06032019 053072018the tasks of this inspection are the conformity of the work performed and the construction materials used during the construction of the facility, the elimination of violations committed by the developer by the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer of violations of the legislation of fencing activities, including technical regulations and project documentation during the construction of the capital construction facility "Crushing Building with conveyor Under the general plan 22, the CIF platform overpass is part of the Mining and Ore Processing Enterprise based on the Shturmovsky gold Deposit in the Magadan Region of the Russian Federation, the First StageThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 001902863923
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-04, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 29052019 1The purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. activities including technical regulations and design documentation during the construction of the capital construction facility "Quarry according to the master plan 11, which is part of the facility "Mining and ore Processing Enterprise based on the Sturmovsky gold deposit"Magadan Region First stage" owned by the open joint stock company "Susuman Mining and Processing Plant "Susumanzoloto"7 The subject of this audit is 1 the conformity of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 The availability of a construction permit. 3 the fulfillment of the requirements set out in Parts 2 3 and 31 Articles 52 of the Urban Code of the Russian Federation


# 001902701121
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-03, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This inspection is carried out in order to carry out state control over compliance by a legal entity with regulatory legal acts regulating activities in the field of motor transport In connection with information received by the Territorial Department of Gosavtodornadzor in the Magadan region on 29042019 from the UGIBDD of the Ministry of Internal Affairs of Russia in the Magadan region on 26042019 142183 about a traffic accident during the transportation of dangerous goods involving a MAN TGS 33480 64 BBS car state registration plate B207EA49 with tank semi-trailer state registration plate ME027O49 owned by JSC Susumanzoloto the objectives of this inspection are to prevent and suppress violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport


# 001902527569
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902527531
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902527527
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. Crushed ore bunker with conveyor overpass and crushed ore warehouse. site ZIF according to the general plan 23, a mining and ore processing enterprise based on the Sturmovsky gold deposit in the Magadan region of the Russian Federation, First of all, subject to compliance with the execution of works and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902527537
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. A 9 MW solid fuel boiler site according to the master plan 9 part of the facility is a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, the first stage of the subject is compliance with the execution of works and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by the parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 001800757674
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on the completion notice dated 06022018 1 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical the customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Tailings storage at the Vetrensky mine stage I" To verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements equipment of the capital construction facility with metering devices for used energy resources


# 001800687018
Unscheduled inspection
Start date: 2018-01-16, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492100217336
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 7
Authority: Severo-Vostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the completeness, quality and timeliness of the execution of the previously issued order dated March 15, 2021 No. 03-56-r/P-2021 on the elimination of violations identified during a scheduled on-site inspection of Susumanzoloto JSC.


# 272100196734
Unscheduled inspection
Start date: 2021-05-13, end date: —, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This inspection is carried out for the purpose of: exercising state control over the implementation of the instruction of the Territorial Department of the State Highway Supervision in the Magadan Region dated 03/24/2021 No. 13-42/03 on the elimination of violations of licensing requirements, the deadline for which expires on 05/01/2021. The objectives of this audit are: implementation of state control over compliance with licensing requirements when carrying out activities for the transportation of passengers and other persons by buses. The subject of this review is - compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 492100202192
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 10
Authority: Severo-Vostochnoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The inspection is carried out pursuant to the instruction of the Government of the Russian Federation dated 04/22/2011 No. IS-P9-2558, in order to assess the completeness and timeliness of the execution of the Dalnedra Notification on violations of the terms of use of the subsoil dated 01/12/2021 No. 08/39 under license MAG 04891 BE. The notice expired on 04/29/2021. The purpose of this audit is to monitor compliance with mandatory requirements in the field of geological exploration, rational use and protection of subsurface resources, to assess the completeness and timeliness of measures taken by Susumanzoloto JSC to eliminate violations of the legislation on subsurface resources and the terms of license agreements specified in the Notification of Dalnedra dated 12.01.2021 No. 08/39 under license MAG 04891 BE. The subject of this audit is the fulfillment by Susumanzoloto JSC of the Dalnedra Notification on violations of the terms of use of the subsoil dated 12.01.2021 No. 08/39 under license MAG 04891 BE.


# 492100126932
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-18, duration: 3
Authority: Severo-Vostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to execute the order.: Federal Service for Environmental, Technological and Nuclear Supervision No. 545 dated December 17, 2020 "On conducting Inspections of Compliance with Mandatory Requirements by Electric Power Industry Entities, Heat Supply Organizations, Heating Grid Organizations and Consumers of Electric Energy in 2021", issued pursuant to the instruction of the Government of the Russian Federation dated December 11, 2020 No. AN-P9-16299. The objectives of this review are: -prevention, detection and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation. The subject of this audit is (please note): compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 492100345486
Unscheduled inspection
Start date: 2021-03-16, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Magadanskoi oblasti
Purpose of inspection: Execution of the previously issued regulation No. 4/1/1 dated 02/03/2020


# 492100345478
Unscheduled inspection
Start date: 2021-03-16, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Magadanskoi oblasti
Purpose of inspection: Execution of the previously issued regulation No. 3/1/1 dated 02/03/2020


# 492100345468
Unscheduled inspection
Start date: 2021-03-16, end date: —, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Magadanskoi oblasti
Purpose of inspection: Execution of the previously issued regulation No. 2/1/1 dated 02/03/2020


# 492100091386
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-23, duration: 2
Authority: Glavnoe upravlenie MCHS Rossii po Magadanskoi oblasti
Purpose of inspection: This check is carried out in order to expire the deadline for the execution of clauses. 1, 6, 7, 8, 9, 10, 11 a legal entity (Susuman Mining and Processing Plant Susumanzoloto Joint Stock Company) previously issued an order to eliminate identified violations of mandatory requirements and (or) requirements established by municipal legal acts dated 12/04/2020 № 2. The objectives of this audit are to carry out a set of measures to assess the compliance of the activities carried out with mandatory requirements in the field of protecting the population and territories from natural and man-made emergencies.


# 492005291372
Unscheduled inspection
Start date: 2020-12-22, end date: 2020-12-30, duration: 7
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The subject of this audit is the fulfillment of the instructions of the state supervision control authorities. This audit is conducted to monitor the instruction issued by the Northeast Department of Rostechnadzor dated September 27, 2019 03212RPP2019THE objectives of this audit are to assess the completeness, quality and timeliness of the previously issued instruction dated September 27, 2019 03212RPP2019 on the elimination of violations identified during a scheduled field inspection of Susumanzoloto JSC


# 492005215820
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-10, duration: 4
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on the completion notice dated 28102020 3 Prevention identification and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer activities, including technical regulations and design documentation during the construction of the capital construction facility "Dam 2, stage III service road to dam 2, river channel creek service road along the river channel Creek as part of the capital construction facility, Tailings storage at the Vetrensky mine, stage III" Compliance of work and construction materials used during the construction of the reconstruction of the capital construction facility and as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used2 the availability of a construction permit3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 492004542759
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration:
Authority:
Purpose of inspection:


# 492004499061
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492004483583
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 492004446260
Unscheduled inspection
Start date: 2020-07-06, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492004472720
Unscheduled inspection
Start date: 2020-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 492004463513
Unscheduled inspection
Start date: 2020-07-15, end date: —, duration:
Authority:
Purpose of inspection:


# 142004406372
Unscheduled inspection
Start date: 2020-05-12, end date: —, duration:
Authority:
Purpose of inspection:


# 492004405819
Unscheduled inspection
Start date: 2020-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 002004369297
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-04-24, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this audit is conducted in order to exercise state control over the fulfillment by a legal entity of the instruction of the Territorial Department of the State Highway Supervision for the Magadan Region dated 21022020 134203 on the elimination of violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport, the deadline for which expires on 0401-2020. The objectives of this audit are to monitor the elimination of previously identified violations specified in the regulation


# 492004318476
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-25, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: 6 This audit is conducted in order to assess the completeness and timeliness of the execution of the Instruction on the elimination of violations of mandatory requirements dated 03102019 267b191 The deadline for the execution of the instruction expires 02032020the purpose of this audit is to bring the company's activities in accordance with current legislation in case of violations based on the following measures bringing to administrative or other liability established by the legislation of the Russian Federation persons guilty of offenses taking other measures established by the legislation of the Russian Federation related to the competence of the Management7 The subject of this audit is the fulfillment by PJSC Susumanzoloto of the Instruction on the elimination of violations of mandatory requirements dated 03102019267b191


# 492004212519
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-17, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: 6 This audit is carried out in order to assess the completeness and timeliness of the execution of the Order on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 30112018 2774183 The deadline for the execution of the order expires on 31.012020the purpose of this audit is to bring the company's activities in accordance with current legislation in case of violations based on the following measures involving administrative or other measures established by law The subject of this audit is the fulfillment by PJSC Susumanzoloto of the Instruction on the Elimination of Identified Violations of Mandatory Requirements dated 30112018 2774183.


# 492004241892
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 492004241865
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-03-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Magadanskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Address 4972620OB dated 20012020 Stupina FA the objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions ensuring compliance by employers with labor legislation and other regulatory legal acts containing norms of labor law, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 002004246299
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-26, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This audit is conducted in order to carry out state control over the compliance of a legal entity with regulatory legal acts regulating activities in the field of motor transport


# 491904128868
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-17, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion of construction. The task is to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. including technical regulations and design documentation for the construction of a capital construction facility, the site of a drinking water pumping station, a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, is the first stage to ensure that the work performed and the building materials used during construction, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for used energy resources are also excluded.


# 491904129225
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-17, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion of construction. The task is to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. including technical regulations and design documentation during the construction of a capital construction facility, the external heat and water supply networks included in the facility, a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, are the first stage to ensure that the work performed and the building materials used during construction, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for used energy resources are also excluded.


# 491904129074
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-17, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion of construction. The task is to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. including technical regulations and design documentation for the construction of a capital construction facility, the highway from the SCC to the VM warehouse according to general plan 124, a mining and ore processing enterprise based on the Sturmovsky gold deposit in the Magadan Region of the Russian Federation, is the first stage to ensure that the work performed and the building materials used during construction, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources


# 491904164773
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, to review the documents of a legal entity, to identify violations during the construction of the capital construction facility "Highway from the State Customs Committee to the VM warehouse according to the general plan 124 included in the the structure of the Mining and Ore processing enterprise based on the Sturmovsky gold depositMagadan Region of the Russian Federation, First stage"7 The subject of this audit is1 the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources 2 the availability of a construction permit 3 the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491904041502
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated20112/2019 5The purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. activities, including technical regulations and design documentation for the construction of the capital construction facility "Crushed ore bunker with conveyor stage and crushed ore warehouse ZIF site according to master plan 23, which is part of the Mining and Ore Processing Enterprise based on the Sturmovsky gold deposit"Magadan Region of the Russian Federation, the first stage of the Susuman Mining and Processing Plant Susumanzoloto, owned by the public limited company7 The subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 The availability of a construction permit. 3 the fulfillment of the requirements set out in Parts 2 3 and 31 Articles 52 of the Urban Code of the Russian Federation


# 491904041455
Unscheduled inspection
Start date: 2019-11-28, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 491904041481
Unscheduled inspection
Start date: 2019-11-28, end date: 2019-12-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on the notice of completion of construction dated 2014/2019 4The purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction based on a contract with the developer or the technical customer. activities, including technical regulations and design documentation for the construction of the capital construction facility "Crushing building with conveyor stage ZIF site according to master plan 22, which is part of the facility "Mining and ore processing Enterprise at the base of the Sturmovsky gold deposit" Magadan region of the Russian Federation First stage" owned by the public joint Stock company "Susumansky Mining and Processing Plant "Susumanzoloto"7 The subject of this audit is the materials in the process of construction reconstruction of capital construction facilities, as well as the results of such work, the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used.2 The availability of a construction permit.3 The fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491904041431
Unscheduled inspection
Start date: 2019-11-28, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 491903886881
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-11-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review of documents of a legal entity, identify violations during the construction of the capital construction facility "Avtovesovaya according to the general plan 21, which is part of the facility "Mining and Ore Processing The enterprise at the base of the Sturmovsky gold deposit"Magadan Region of the Russian Federation First stage"7 The subject of this audit is the materials during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources2 the availability of a construction permit 3 the fulfillment of the requirements established by the Legislation of the Russian Federation. parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903886880
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-11-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review of documents of a legal entity, identify violations during the construction of the capital construction facility "Ammonium nitrate warehouse site according to the general plan 8 incoming construction of the mining facility and an ore processing enterprise based on the Sturmovsky gold deposit "Magadan Region of the Russian Federation, First Stage"7 The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices energy resources2 the availability of a construction permit3 the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903922759
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 491903922740
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 15/102019 7The purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. activities, including technical regulations and design documentation for the construction of the capital construction facility "Storage site for untreated tailings according to master plan 3, which is part of the facility "Mining and Ore Processing Enterprise at the base of the Sturmovsky gold deposit" Magadan region of the Russian Federation First stage" owned by the public joint Stock company "Susumansky Mining and Processing Plant "Susumanzoloto"7 The subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 The availability of a construction permit. 3 the fulfillment of the requirements set out in Parts 2 3 and 31 Articles 52 of the Urban Code of the Russian Federation


# 491903922723
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 491903886882
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-11-01, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs for conducting inspections on the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The purpose of this audit is to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility. "Dam 2, stage III, service road to dam 2, channel creek Flowery service roadway, channel creek Flowery as part of the capital construction facility "Tailings storage at the Vetrensky mine"stage III"The subject is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 491903059286
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection:


# 491903682904
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: An unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation to the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 18092019 W> 15The purpose of this inspection is to prevent identify and suppress violations of the law by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. urban planning activities, including technical regulations and design documentation for the construction of the capital construction facility "Quarry highway from quarry to dump according to general plan No. 125, which is part of the Mining and Ore Processing Enterprise based on the Sturmovsky gold mine" Magadan Region First Stage"owned by the public joint stock company "Susumanek Mining and Processing Plant "Susumanzoloto"7 The subject of this audit is 1 the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 The availability of a construction permit. 3 the fulfillment of the requirements set out in Parts 2 3 and 31 Articles 52 of the Urban Code of the Russian Federation


# 491903682833
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-10-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: An unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation to the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 1809201915the purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer including technical regulations and design documentation for the construction of the capital construction facility "Highway from the GTK quarry to the on-site highways according to the master plan 123, which is part of the IOR Mining and Ore Processing Enterprise at the base of the Sturmovsky gold deposit in the Magadan Region of the Russian Federation, the first stage" owned by the public joint stock company Susuman Mining and Processing Plant SusumanzolotoThe subject is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and with the requirements for equipping the capital construction facility with metering devices for energy resources 2 availability of a construction permit 3 compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Code Of the Russian Federation


# 491903782939
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration:
Authority:
Purpose of inspection:


# 491903682093
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of hazardous production facilities inspection of buildings premises structures technical devices equipment and materials used at hazardous production facilities used by a legal entity in the course of its activities using photographs and videos for no more than 3 working days examination and examination of documents of a legal entity for no more than 3 working days


# 491903623688
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility "Crushing building with conveyor overpass site ZIF according to the general plan 22 included in the the composition of the facility "Mining and metal processing enterprise based on the Ashturmovsky gold deposit" Magadan region, First stage"7 The subject of this audit is1 the conformity of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply, and the requirements of the equipment of the capital construction facility metering devices for used energy resources2 the availability of a construction permit3 the fulfillment of the requirements established by parts 2 3 and 31 of Article 52


# 491903623590
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility "Bunkered ore with a conveyor overpass and a warehouse of crushed ore site ZIF the general plan 23, which is part of the Mining and Ore Processing Enterprise at the base of the Sturmovsky gold deposit, Magadan Region, first stage.7 The subject of this audit is1 the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply and the requirements of equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903623497
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-11, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The tasks of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility "The main building of ABC ZIF with an assay laboratory, the creation of production water supply tanks, the ZIF site according to plan 242526, which is part of the Mining and Processing Enterprise based on the Ashturmovsky gold deposit, Magadan Region, First Stage, Magadan Region, First Stage,7 The subject of this audit is 1. compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which The requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources2 the availability of a construction permit 3 the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903075014
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection:


# 001902991046
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-27, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: this audit is conducted in order to exercise state control over the implementation by a legal entity of the instruction of the Territorial Department of the State Highway Supervision in the Magadan Region dated 03062019 025111 on the elimination of violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport, the deadline for which expires on 01092019


# 491903020901
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-01, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of paragraphs 19 previously issued by the Northeast Department of Rostechnadzor of the regulation dated 29032019 0424 2019 E B The objectives of this audit are to monitor the completeness and quality of the implementation of paragraphs 19 previously issued by the Northeast Department of Rostechnadzor of the regulation dated 29032019 0424 2019 E B The subject of this audit is to comply with the regulations of the state control and supervision authorities


# 141903298667
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-12, duration:
Authority: Lenskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the application of the licensee of PJSC Susumanzoloto dated 20062019 132147"On the renewal of the license for the production of surveying works" bx 762467 dated 21062019 verification of the compliance of the licensee of PJSC Susumanzoloto with the licensing requirements and conditions when carrying out the licensed type of activity "Production of surveying works"


# 491902959330
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 491902959271
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, the site of an ammonium nitrate warehouse according to the general plan 8 A mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, which is part of the facility, the first stage of this audit is1 the conformity of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements The requirements for equipping a capital construction facility with metering devices for used energy resources also do not apply.


# 491902959494
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review of documents of a legal entity, identify violations during the construction of a capital construction facility, technical water supply according to the master plan 10 of the incoming the facility includes a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 491902959127
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 06032019 053062018the tasks of this inspection are the conformity of the work performed and the construction materials used during the construction of the facility, the elimination of violations committed by the developer by the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer of violations of the legislation of fencing activities, including technical regulations and project documentation during the construction of the capital construction facility "Main Building of ABC ZIF with an assay laboratory, the building of industrial water supply tanks, the ZIF site according to the general plan 242525, which is part of the Mining and Ore Processing Enterprise based on the gold deposit of Shturmovsky, the Magadan region of the Russian Federation, the First stageThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 491902959458
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review of documents of a legal entity, identify violations during the construction of a capital construction facility Highway from the quarry of the State Customs Committee of Inter-site Highways according to the master plan 123, a mining and ore processing enterprise based on the Sturmovsky gold deposit in the Magadan Region of the Russian Federation, the first stage of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements energy efficiency requirements do not apply to the equipment of the capital construction facility with metering devices for used energy resources.


# 491902959253
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review documents of a legal entity, identify violations during the construction of a capital construction facility Access road to the shift settlement of interplanetary according to the general plan 121, which is part of the Mining and Ore Processing Enterprise facility based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which Energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources.


# 491902892800
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility, the main building of ABC ZIF with assay analysis the laboratory building of industrial water supply tanks, the ZIF site, according to the general plan 24 25 26, which is part of the Mining and ore processing enterprise facility based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, is the first stage of the subject of this inspection.1 The conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit 3 meeting the requirements set out in parts 23 and 3 of Article 52 of the Urban Planning Code of the Russian Federation 4 meeting the requirements of state control bodies, municipal control bodies


# 001902889617
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 001902889859
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review of documents of a legal entity, identify violations during the construction of a capital construction facility, technical water supply according to the master plan 10 of the incoming the facility includes a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements set out in parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation


# 001902889660
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 001902889656
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 001902889587
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Northeast Department of Rosstechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, review the documents of a legal entity, identify violations during the construction of a capital construction facility, Tailings farm site according to the master plan 3 a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region, Russian Federation, the first stage of the subject of this audit is1 the conformity of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply The requirements for equipping a capital construction facility with metering devices for used energy resources2 obtaining a construction permit3 meeting the requirements established by parts 23 and 3 of Article 521 of the Urban Planning Code of the Russian Federation also apply.


# 491902886946
Unscheduled inspection
Start date: 2019-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 001902876712
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 06032019 053072018the tasks of this inspection are the conformity of the work performed and the construction materials used during the construction of the facility, the elimination of violations committed by the developer by the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer of violations of the legislation of fencing activities, including technical regulations and project documentation during the construction of the capital construction facility "Crushing Building with conveyor Under the general plan 22, the CIF platform overpass is part of the Mining and Ore Processing Enterprise based on the Shturmovsky gold Deposit in the Magadan Region of the Russian Federation, the First StageThe subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 491902864251
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-23, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to establish the possibility of carrying out licensing activities attributed by the legislation and regulatory legal acts of the Russian Federation to the competence of Rostechnadzor on the basis of an application for renewal of the license for the type of activity "Production of surveying works" from the licensee of PJSC Susumanzoloto dated 21062019 g bx 762467


# 001902863923
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-04, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 29052019 1The purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. activities including technical regulations and design documentation during the construction of the capital construction facility "Quarry according to the master plan 11, which is part of the facility "Mining and ore Processing Enterprise based on the Sturmovsky gold deposit"Magadan Region First stage" owned by the open joint stock company "Susuman Mining and Processing Plant "Susumanzoloto"7 The subject of this audit is 1 the conformity of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used.2 The availability of a construction permit. 3 the fulfillment of the requirements set out in Parts 2 3 and 31 Articles 52 of the Urban Code of the Russian Federation


# 491902746306
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-25, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: 6 To establish that this audit is being conducted in order to assess the completeness and timeliness of the execution of Regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental protection requirements from 28082017 12hv2171 and from 25062018 257dip1182 The deadline for the execution of regulations expires 04062019the objectives of this audit are to monitor compliance with mandatory requirements in the field of geological exploration rational use and protection of subsurface bringing the company's activities to compliance with current legislation in the event of violations being identified by taking the following measures, bringing to administrative or other liability those responsible for violations established by the legislation of the Russian Federation, and taking other measures established by the legislation of the Russian Federation within the competence of the Department.7 The subject of this audit is the fulfillment by Susumanzoloto of Regulations on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements from 28082017 12hv2171 and from 25062018 257dip1182


# 001902701121
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-03, duration:
Authority: Dalnevostochnoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This inspection is carried out in order to carry out state control over compliance by a legal entity with regulatory legal acts regulating activities in the field of motor transport In connection with information received by the Territorial Department of Gosavtodornadzor in the Magadan region on 29042019 from the UGIBDD of the Ministry of Internal Affairs of Russia in the Magadan region on 26042019 142183 about a traffic accident during the transportation of dangerous goods involving a MAN TGS 33480 64 BBS car state registration plate B207EA49 with tank semi-trailer state registration plate ME027O49 owned by JSC Susumanzoloto the objectives of this inspection are to prevent and suppress violations of mandatory requirements of legislative and other regulatory legal and regulatory technical acts regulating activities in the field of motor transport


# 491902681289
Unscheduled inspection
Start date: 2019-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 491902493736
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-03-11, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: 6 To establish that this inspection is being carried out in accordance with the instructions of the Government of the Russian Federation dated 22042011 ISP92558 in order to assess the completeness and timeliness of the execution of Notifications from Dalnedra on violations of the terms of use of the subsoil dated 08022018 08266 and 08267 under licenses MAG 04437 BR and MAG 04486 BE The deadline for the execution of notifications expires 08022019 The purpose of this inspection is to monitor compliance with mandatory requirements in the field of geological study of the rational use and protection of subsurface resources assessment of the completeness and timeliness of measures taken by JSC Susumanzoloto to eliminate violations of the legislation on subsurface resources and the terms of the license agreement specified in the Notifications of Dalnedra dated 08022018 08266 and 08267 under licenses MAG 04437 BR and MAG 04486 BE 7 The subject of this audit is the fulfillment by JSC Susumanzoloto of Notifications of violations by Dalnedra terms of use of mineral resources from 08022018 08266 and 08267 under licenses MAG 04437 BR and MAG 04486 BE


# 001902527569
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identification of violations during the construction of a capital construction facility. The main building of ABC ZIF with an assay and analytical laboratory. the building of production tanks according to the general plan 242526, the ZIF site, which is part of the facility, is a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan region of the Russian Federation, the first stage of the subject is compliance with the performance of works and construction materials used during the construction of the reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of permits for construction 3 meeting the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902527558
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. Crushing building with conveyor overpass. ZIF site according to master plan 22. incoming the facility includes a mining and ore processing enterprise based on the Sturmovsky gold deposit in the Magadan region of the Russian Federation, the first stage of the subject is compliance with the execution of works and construction materials used during the construction of the reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements set out in Parts 2 Articles 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902527531
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. Avtovesovaya according to the general plan. 21 Mining and ore processing facility. The company is based on the Sturmovsky gold deposit in the Magadan region of the Russian Federation, the first stage


# 001902527527
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. Crushed ore bunker with conveyor overpass and crushed ore warehouse. site ZIF according to the general plan 23, a mining and ore processing enterprise based on the Sturmovsky gold deposit in the Magadan region of the Russian Federation, First of all, subject to compliance with the execution of works and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902527537
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the program of inspections for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of the Rostechnadzor Northeast Directorate for 2019. The task is to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation. review of documents of a legal entity. identify violations during the construction of a capital construction facility. A 9 MW solid fuel boiler site according to the master plan 9 part of the facility is a mining and ore processing enterprise based on the Sturmovsky gold deposit, Magadan Region of the Russian Federation, the first stage of the subject is compliance with the execution of works and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, requirements for equipping the capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by the parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation


# 491903892048
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility "9MW solid fuel boiler site according to the master plan 9 incoming The Magadan Region, Russian Federation, First Priority, is a part of the Mining and Metal Processing Enterprise based on the Ashturmovsky gold deposit.7 The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply, and the requirements of the facility's equipment capital construction metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903892111
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-03-06, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review the documents of a legal entity, identify violations during the construction of the capital construction facility "Avtovesovaya according to the general plan 21, which is part of the facility"Mining and ore processing enterprise at the base of the Sturmovsky gold deposit" Magadan Region of the Russian Federation First stage"7 The subject of this audit is1 the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements of energy efficiency, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply, and the requirements of equipping the capital construction facility with metering devices for used energy resources2 availability of a building permit3 meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491902493381
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-28, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: 6 To establish that this audit is conducted in order to assess the completeness and timeliness of the execution of the Instruction on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 16042018 242dip16182 The deadline for the execution of the instruction expires 01022019 The objectives of this audit are to monitor compliance with mandatory requirements in the field of geological exploration rational use and protection of subsurface resources bringing the company's activities in line with the current legislation in case of detection of violations based on the adoption of the following measures, bringing to administrative or other liability those responsible for violations established by the legislation of the Russian Federation, taking other measures established by the legislation of the Russian Federation within the competence of the Department 7 The subject of this audit is the fulfillment by JSC Susumanzoloto of the Regulations on the Elimination of Violations of legislation in the field of environmental protection and Violations of Environmental Protection Requirements dated 16042018 242dip16182


# 491802060678
Unscheduled inspection
Start date: 2018-11-06, end date: 2018-11-30, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: To establish that this audit is being conducted in order to assess the completeness and timeliness of the execution of Regulations to eliminate violations of legislation in the field of environmental protection and violations of environmental requirements dated August 28, 2017 12hv3171 and 12hv4171 The deadline for the execution of regulations expires on November 05, 2018 The objectives of this audit are to monitor compliance with mandatory requirements in the field of geological exploration rational use and protection of subsurface resources bringing activities in accordance with the current legislation, in the event of violations being detected by taking the following measures, bringing to administrative or other liability those responsible for violations established by the legislation of the Russian Federation, and taking other measures established by the legislation of the Russian Federation within the competence of the Management, the subject of this audit is the fulfillment by Susumanzoloto of the Instructions to eliminate violations of legislation in the field of environmental protection and violations Environmental requirements of August 28, 2017 12hv3171 and 12hv4171


# 491800592633
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-26, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the instruction issued by the Northeast Department of Rostechnadzor dated May 16, 2018 0320R2018. The objectives of this inspection are to assess the completeness, quality and timeliness of the previously issued instruction dated May 16, 2018 0320R2018 on the elimination of violations identified during the scheduled field inspection of JSC Susumanzoloto


# 491800498792
Unscheduled inspection
Start date: 2018-06-05, end date: 2018-06-25, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: The audit is conducted in order to assess the completeness and timeliness of the execution of the Instruction to eliminate violations of legislation in the field of environmental protection and violations of environmental requirements dated August 28, 2017 12h1171 The deadline for the execution of the instruction expires on June 04, 2018 The objectives of this audit are to monitor compliance with mandatory requirements in the field of geological exploration rational use and protection of the subsoil, bringing the company's activities in line with current legislation. in the event of violations being identified based on the adoption of the following measures, bringing to administrative or other liability those responsible for violations established by the legislation of the Russian Federation, and taking other measures established by the legislation of the Russian Federation within the competence of the Department, the subject of this audit is the fulfillment by Susumanzoloto of the Regulations on the Elimination of Violations of legislation in the field of environmental protection and Violations of Environmental Protection Requirements dated August 28 2017 12h1171


# 491800219976
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-16, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Magadanskoi oblasti
Purpose of inspection: To establish that this audit is conducted in order to assess the completeness and timeliness of the implementation of Regulations to eliminate violations of legislation in the field of environmental protection and violations of environmental requirements dated August 28, 2017 12nv15171 12nv16171 12nv17171 12nv18171 12nv19171 12nv20171 12nv21171 12nv22171 12nv23171 12nv24171 12nv25171 12nv26171 12nv27171 12nv28171 12nv29171 12nv30171 12nv31171 12nv32171 The deadline for the execution of regulations expires on April 02, 2018 The objectives of this audit are supervision for compliance with mandatory requirements in the field of geological exploration rational use and protection of subsurface resources, bringing the company's activities into line with current legislation in case of violations by taking the following measures: bringing to administrative or other liability established by the legislation of the Russian Federation those responsible for offenses, taking other measures established by the legislation of the Russian Federation related to the competence of Management


# 001800757674
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on the completion notice dated 06022018 1 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical the customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Tailings storage at the Vetrensky mine stage I" To verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, design documentation, including energy efficiency requirements equipment of the capital construction facility with metering devices for used energy resources


# 001800757387
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-20, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to verify the fulfillment of the previously issued instruction from 02022018 056012018C based on the notice of elimination of violations from 06022018 2 The task is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and design documentation during the construction of a capital construction facility The construction of the "Tailings storage facility at the Vetrensky mine stage I" is subject to verification of the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including energy efficiency requirements, the requirements for equipping the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.