Found 100 inspections:

# 002005252328
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-13, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out on the basis of the received request dated October 05, 2020 RMRkD3223 of PJSC ROSSETI Moscow Region for conducting an inspection in order to comply with the previously issued order dated August 07, 2020 PRP2001049o


# 002005222498
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-13, duration: 3
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the previously issued order from 21082020 532051vnP03012020 hereinafter the Order, the deadline for which expired on the basis of an application received from PJSC ROSSETI Moscow Region to conduct an inspection in order to recognize the Order fulfilled from 15102020 RMRGD3358 bx from 19102020 21045514 The task of this check is to establish the facts of non-fulfillment by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the above-mentioned prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal entity


# 002005206648
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-06, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the execution by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the previously issued order from 21082020 532051vnP03012020 hereinafter the Order, the deadline for which expired on the basis of an application received from PJSC ROSSETI Moscow Region to conduct an inspection in order to recognize the Order fulfilled from 15102020 RMRGD3358 bx from 19102020 21045514 The purpose of this inspection is to establish the facts of non-fulfillment by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the above-mentioned prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal entity


# 002005208144
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-09, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the execution of a previously issued prescription 532064vnP03092020 from 21082020, the deadline for which the task expires is to establish the facts of fulfillment of non-fulfillment of the above prescriptionsubject fulfillment of the prescription by a legal entity


# 002005207616
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-09, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the KNM is to control the fulfillment by the branch of PJSC ROSSETI Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103vnP03122020 on the basis of a request for verification from 19102020 4299 Task of the KNM is to establish the facts of fulfillment by the branch of PJSC Rosseti Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103VNP03122020 by the KNM branch of PJSC Rosseti Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103vnP03122020 on the basis of a request for verification from 15102020 RMRGD3358


# 002004940857
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-08-07, duration: 20
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated July 08, 2020 267 "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period of 2020-2021" issued on the basis of an instruction from the Government of the Russian Federation dated July 03, 2020 YUBP97109


# 001903713366
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to control the execution by the branch of PJSC MOESK Northern Electric Networks of the previously issued instruction dated 30082019 312107P07322019 hereinafter referred to as the Instruction, the deadline for which has expired The task of this inspection is to establish the facts of non-fulfillment by the branch of PJSC MOESK Northern Electric Networks of the Prescription


# 001904072695
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-11-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the audit received from Gazpromneftepz JSC on the issue of violations of the operation of electrical installations at the address In the Fields of the Kapotnya Refinery, Moscow 109429the objectives of this audit are to monitor the measures taken to comply with mandatory safety requirements in the electric power industry by a legal entity, an individual entrepreneur, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of the adoption of measures to eliminate violations of mandatory requirements in the event of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulations


# 001903716054
Unscheduled inspection
Start date: 2019-10-22, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903713387
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-01, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution by the branch of PJSC MOESK Southern Electric Networks of the previously issued prescription dated 16082019 312048P06692019 has been given an instruction the deadline for which has expired The task of this audit is to establish the facts of the fulfillment of the fulfillment by the branch of PJSC MOESK Southern Electric Networks of the prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal person


# 001903712067
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-01, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by the branch of PJSC MOESK Eastern Electric Networks of the previously issued regulation dated 27082019 312105vnP07182019, the deadline for which has expired


# 001903149570
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-13, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of PJSC MOESK "Eastern Electric Networks" 15 1719 21 22 24 39 213 247250 303 304 308 327 The previously issued Rostechnadzor regulation dated June 8, 2018 132rpP2018 The task of this audit is to establish the facts of non-fulfillment by the branch of PJSC MOESK "Eastern Electric Networks" of the above points Rostechnadzor regulations dated June 8, 2018 132RPP2018 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001903149530
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-13, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of PJSC MOESK "New Moscow" 3 29 30 66 7578 92 107 114 115 133 155 156 160 172 175177 198 201 The previously issued Rostechnadzor regulation dated June 8, 2018 133rpP2018 The purpose of this audit is to establish the facts of non-compliance by the branch of PJSC MOESK "New Moscow" the above-mentioned paragraphs of the Rostechnadzor regulation dated June 8, 2018 133RPP2018 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001902889548
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-23, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution by the branch of PJSC MOESK of the Eastern electric networks of the points of Z 69 135 139 142 149 151 169173 178 185189 192 197 200203 205 212 214 215 219 225 248 259 263 266 268 270 271 279 284 296 299 302 303 Z 13 315 Z 16 336 343 524 536 555 647649 653 previously issued prescription dated 14092018 N 312559vnP08892018 the deadline for which has expired


# 001902757463
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-07-19, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the fulfillment of regulation 1036995 of 22062018, namely, verification of the fact of emissions of harmful pollutants into the atmospheric air at the MOESK PJSC facility at 121609 Moscow Osennaya vl 27 CJSC PS 833 Krylatskaya on the basis of a special permit


# 001802063423
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001802063552
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to control the fulfillment by the branch of PJSC MOESK Southern Electric Networks of paragraphs 1325 of the previously issued instruction dated June 8, 2018 131rpP2018 The purpose of this inspection is to establish the facts of non-fulfillment by the branch of PJSC MOESK Southern Electric Networks of the above-mentioned paragraphs of the instruction dated June 8, 2018 131rpP2018 The subject of this inspection is the fulfillment regulations of the state control and supervision bodies


# 001802063454
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-14, duration:
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the fulfillment of the points by the branch of PJSC MOESK "New Moscow" 1 2 428 3165 6774 7991 93106 108113 116132 134154 157159 161171 173 174 178197 199 200 previously issued regulation No. 133rpP2018 dated June 8, 2018, the task of this audit is to establish the facts of non-compliance by the branch of PJSC MOESK "New Moscow" the above-mentioned paragraphs of the regulation dated June 8, 2018 133rpP2018 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies


# 001802063389
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration:
Authority:
Purpose of inspection:


# 001801038112
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Order of the Federal Service for Environmental Technological and Nuclear Supervision dated August 01, 2018 329 "On monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period 20182019" issued on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation DNKOZAK dated June 19, 2018 DKP94467


# 001801200721
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-24, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated August 01, 2018 329 "On monitoring the preparation of electric power facilities for operation in the autumn-winter period 20182019" issued on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation DNKOZAK dated June 19, 2018 DKP94467


# 00160700051368
Unscheduled inspection
Start date: 2016-07-27, end date: —, duration:
Authority: Federalnoe agentstvo po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection:


# 00160700051360
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-07-29, duration:
Authority: Federalnoe agentstvo po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: compliance with mandatory requirements


# 00150601207990
Unscheduled inspection
Start date: 2015-09-28, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription


# 00150601205594
Unscheduled inspection
Start date: 2015-09-28, end date: —, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the fulfillment of the prescription


# 00150601268281
Unscheduled inspection
Start date: 2015-09-16, end date: 2015-10-13, duration:
Authority: Centralnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: Federal State control and supervision over compliance with the requirements of technical regulations and mandatory requirements of standards in the field of technical regulation in accordance with Federal Law No. 184 FZ of December 27, 2002 "On Technical Regulation"


# 00150600020712
Unscheduled inspection
Start date: 2015-08-03, end date: —, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the progress of preparation and assessment of the readiness of electric power and heat supply facilities for operation in the autumn-winter period 2015-2016


# 772101433945
Unscheduled inspection
Start date: 2021-12-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 502101523738
Unscheduled inspection
Start date: 2021-12-24, end date: 2022-01-28, duration: 1
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by municipal legal acts; Verification of the facts set out in the citizens' appeal; Verification of the completeness, reliability, and relevance of information posted by management organizations in the GIS housing and communal services system


# 772101489766
Unscheduled inspection
Start date: 2021-12-21, end date: 2021-12-28, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: the fulfillment by the developer of the requirements of part 3.1 of Article 52 of the Urban Planning Code compliance with the performance of works and applied building materials during construction reconstruction of the capital construction facility, as well as the results of such work to the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used, including verification of the elimination of violations of compliance of completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772101398246
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 502101259121
Unscheduled inspection
Start date: 2021-10-21, end date: 2021-11-19, duration: 30
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by housing legislation, legislation on energy conservation and energy efficiency improvement; Verification of the facts set out in the citizens' appeal; Verification of compliance with mandatory requirements for determining the amount and payment of utility bills; Verification of ensuring the rights and legitimate interests of citizens and the state in providing housing and communal services to the population; Verification of compliance requirements of the housing legislation of the Russian Federation


# 772100685193
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 502101129413
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration:
Authority:
Purpose of inspection:


# 772100408760
Unscheduled inspection
Start date: 2021-08-04, end date: 2021-08-10, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation and legislation on urban development by the person being audited; The subject of the audit: the developer's compliance with the requirements of part 3.1 of Article 52 of the Urban Planning Code


# 772100498141
Unscheduled inspection
Start date: 2021-08-20, end date: 2021-08-24, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100248010
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification based on the notice of completion of construction P001-4504415167-45560068 dated 05/20/2021. assessment of compliance of the work performed with the requirements of design documentation at the capital construction facility "110 kV Ramenskaya Electric Substation No. 195", located at the address: Russian Federation, Moscow region, Ramenskoye, Sportivny proezd, 2.


# 772100240800
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 772100244779
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 772100242831
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: 5
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Verification of the execution of previously issued regulation No. R-SV-00054-OES/1 dated 04/23/2021 Prevention, detection and suppression of violations of legal requirements compliance with the instructions of state control (supervision) bodies, municipal control bodies


# 772100143482
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-05-17, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: Purpose: verification of facts about non-compliance with mandatory requirements of sanitary legislation according to the information set out in the reasoned submission dated April 05, 2021 No. 01-08364-2, based on the results of consideration of a citizen's appeal (Ex. No. 01-08364-2 dated 03.03.2021) Tasks: monitoring compliance with mandatory requirements in the field of sanitary and epidemiological human well–being Subject: compliance with mandatory requirements and (or) requirements established by municipal legal acts; holding events: to prevent harm to the life and health of citizens


# 502100167150
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-05-17, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by municipal legal acts; Verification of facts stated in the application of other persons; Verification of compliance with the requirements of housing legislation of the Russian Federation; Verification of completeness, reliability, relevance of information posted by management organizations in the GIS housing and communal services system


# 772100142909
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-07, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: this inspection is carried out for the purpose of: monitoring the implementation of the previously issued prescription dated 02/27/2019 No. 11/1/1, the deadline for which has expired; The objectives of this inspection are: to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, and taking action on the results of the audit. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies


# 772100142796
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-07, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: this inspection is carried out for the purpose of: monitoring the implementation of the previously issued prescription dated 30.03.2017 No. 42/1/1, the deadline for which has expired; The objectives of this inspection are: to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, and taking action on the results of the audit. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies


# 772100142680
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-07, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: this inspection is carried out for the purpose of: monitoring the implementation of the previously issued prescription dated 02/28/2019 No. 7/1/1, the deadline for which has expired; The objectives of this inspection are: to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, and taking action on the results of the audit. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies


# 502100196499
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-06-03, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti «Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti»
Purpose of inspection: Compliance with mandatory requirements or requirements established by housing legislation, legislation on energy conservation and energy efficiency improvement; Verification of the facts set out in the citizens' appeal; Verification of compliance with the requirements of housing legislation of the Russian Federation; Verification of completeness, reliability, relevance of information posted by management organizations in the GIS housing and communal services system


# 772100191508
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the facts set out in the memo of the head of the ONzS No.5 dated 03/23/2021. assessment of compliance of the parameters of capital construction facilities with the maximum parameters of permitted construction, established rules of land use and development, documentation on the layout of the territory, and mandatory requirements for the parameters of capital construction facilities: "Construction of PS 220/110/10kV Tyutchevo" at the address: Moscow region, Pushkinsky district, Pravdinsky settlement, in the Stepankovskoye highway area (near the turn of the highway to Eldigino).


# 772100184240
Unscheduled inspection
Start date: 2021-04-23, end date: —, duration: 5
Authority: Gosudarstvennaya zhilischnaya inspekciya goroda Moskvy
Purpose of inspection: Ensuring the placement of complete and reliable information by persons providing housing and communal services in order to implement, from July 1, 2021, the provisions of Articles 159 and 160 of the Housing Code of the Russian Federation as amended by Federal Law No. 442-FZ of November 28, 2018 "On Amendments to Articles 159 and 160 of the Housing Code of the Russian Federation"; Prevention, detection and suppression of violations of legal requirements; Compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 772100179305
Unscheduled inspection
Start date: 2021-04-23, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po gorodu Moskve
Purpose of inspection: The inspection is carried out in order to verify the facts of the threat of harm to the life and health of citizens according to the information set out in the reasoned submission No. 24-0062-MP dated 04/12/2021. based on the results of consideration of the appeal (information) No.21075/Zh-2021 dated 03/19/2021. The objectives of this audit are to monitor compliance with mandatory requirements in the field of sanitary and epidemiological human well-being. The subject of this audit is compliance with mandatory requirements, carrying out measures to prevent harm to the life and health of citizens.


# 772100059542
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: this inspection is carried out for the purpose of: monitoring the implementation of the previously issued prescription dated 06/08/2018 No. 162/1/1, the deadline for which has expired; The objectives of this inspection are: to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, and taking measures based on the results of the audit; The subject of this audit is the fulfillment of the instructions of state control (supervision) bodies, municipal control bodies


# 772100024175
Unscheduled inspection
Start date: 2021-03-26, end date: 2021-03-31, duration: 4
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to control the execution by the branch of PJSC ROSSETI Moscow Region - Eastern Electric Networks of the previously issued order No. 5.3-3733vn-P/0539-2020 dated 12/24/2020 (hereinafter referred to as the Order), the deadline for which has expired. The purpose of this audit is to establish the facts of fulfillment (non-fulfillment) by the branch of PJSC ROSSETI Moscow Region - Eastern Electric Networks of the above-mentioned Prescription. The subject of this check is the fulfillment of the Prescription by a legal entity


# 772100042112
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-31, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: control over the implementation of the GPN regulation No. 15/1/1 dated 02/11/2020 on the elimination of violations of fire safety requirements, on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire


# 772100023048
Unscheduled inspection
Start date: 2021-02-20, end date: 2021-03-18, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification based on the notice of completion of construction P001-3401830898-42652198 dated 02/09/2021, assessment of compliance of the work performed with the requirements of design documentation at the capital construction facility 110 kV Ramenskaya Electric substation No. 195 at the address: Russian Federation, Moscow region, Ramenskoye, Sportivny passage, 2


# 772105343440
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: this inspection is carried out for the purpose of: monitoring the implementation of the previously issued regulation No. 512/1/1 dated 10/28/2019, the deadline for which has expired. The objectives of this inspection are: to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them, and taking action on the results of the audit. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies


# 772105326365
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-02-22, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: monitoring the implementation of the previously issued legal order of the State Fire Supervision Authority No. 8/1/1 dated February 28, 2019; assessment of compliance of activities or actions (inaction) carried out by a legal entity (individual entrepreneur) with mandatory fire safety requirements; compliance with the instructions of state control (supervision) bodies, municipal control bodies


# 002005286369
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-24, duration: 1
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the check is carried out on the basis of violations of the Rules of technical operation of electric power plants and networks of the Russian Federation approved by the order of the Ministry of Energy of the Russian Federation dated 19062003 229 registered by the Ministry of Justice of the Russian Federation 20062003 registration 4799 Rules for the installation of electrical installations 6th edition approved by the order of the Ministry of Energy of the Russian Federation dated 08072002 204 "On approval of the chapters of the Rules for the installation of electrical installations" during the operation of an electrical installation of a high-voltage cable line located at the address Moscow region Pavlovo Posadsky district village Kriulino coordinates 557509710 385482087 located on the balance sheet of PJSC ROSSETI Moscow Region in the area of operational responsibility of the Eastern Electric Networks branch identified as a result of consideration of the application of the master of the Moscow Distance of engineering structures of the Moscow Directorate of Infrastructure of the structural subdivision of the Central Directorate of Infrastructure of the branch of JSC Russian Railways Shaldakov BB received with a letter from the Eastern Transport the Prosecutor's Office dated 19112020 1p20201999 bx dated 03122020 21053931 and during the preliminary verification of the information received without interaction with a legal entity, which is a threat to harm the life and health of citizens, the task of this audit is to prevent identify and suppress violations of the requirements of the Rules of Technical Operation of Electric Power plants and networks, the Rules of electrical installations, the subject of this audit is to verify the facts stated in the appeal compliance with mandatory requirements by a legal entity Rules for the technical operation of electric power plants and networks Rules for the installation of electrical installations


# 772005252943
Unscheduled inspection
Start date: 2020-12-02, end date: 2020-12-15, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of the audit is the fulfillment by the person carrying out the construction requirements of part 3 of Article 52 of the Urban Planning Code


# 502005252445
Unscheduled inspection
Start date: 2020-12-03, end date: 2020-12-25, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Assessment of the compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Reconstruction of the 110 kV 308 NaroFominsk substation with power lines at the address Moscow region gNaroFominsk Krasnoarmeysky Lane


# 502005209061
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-12-01, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: conducting an inspection based on the notice of completion of construction P001756001182339813412 dated 21102020


# 002005252328
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-13, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out on the basis of the received request dated October 05, 2020 RMRkD3223 of PJSC ROSSETI Moscow Region for conducting an inspection in order to comply with the previously issued order dated August 07, 2020 PRP2001049o


# 002005222498
Unscheduled inspection
Start date: 2020-11-11, end date: 2020-11-13, duration: 3
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to control the execution by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the previously issued order from 21082020 532051vnP03012020 hereinafter the Order, the deadline for which expired on the basis of an application received from PJSC ROSSETI Moscow Region to conduct an inspection in order to recognize the Order fulfilled from 15102020 RMRGD3358 bx from 19102020 21045514 The task of this check is to establish the facts of non-fulfillment by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the above-mentioned prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal entity


# 502005190501
Unscheduled inspection
Start date: 2020-10-05, end date: 2020-10-27, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: conducting an inspection based on the notice of completion of construction P001700119079338855232 dated 23092020


# 002005206648
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-06, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the execution by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the previously issued order from 21082020 532051vnP03012020 hereinafter the Order, the deadline for which expired on the basis of an application received from PJSC ROSSETI Moscow Region to conduct an inspection in order to recognize the Order fulfilled from 15102020 RMRGD3358 bx from 19102020 21045514 The purpose of this inspection is to establish the facts of non-fulfillment by the branch of PJSC ROSSETI Moscow Region Southern Electric Networks of the above-mentioned prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal entity


# 002005208144
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-09, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the execution of a previously issued prescription 532064vnP03092020 from 21082020, the deadline for which the task expires is to establish the facts of fulfillment of non-fulfillment of the above prescriptionsubject fulfillment of the prescription by a legal entity


# 002005207616
Unscheduled inspection
Start date: 2020-10-29, end date: 2020-11-09, duration: 7
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the KNM is to control the fulfillment by the branch of PJSC ROSSETI Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103vnP03122020 on the basis of a request for verification from 19102020 4299 Task of the KNM is to establish the facts of fulfillment by the branch of PJSC Rosseti Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103VNP03122020 by the KNM branch of PJSC Rosseti Moscow region Eastern Electric Networks of the previously issued prescription from 28082020 532103vnP03122020 on the basis of a request for verification from 15102020 RMRGD3358


# 002004483655
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-11, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out as part of the implementation of federal state energy supervision the registration number of the function in the federal state information system "Federal Register of State and Municipal Services of Functions" 313853436 Establish that this audit is carried out in order to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 2020-2021 on the basis of an order from the Government of the Russian Federation dated 03072020 YUBP97109 and an order from the Federal Service for Environmental Technological Development and Nuclear Supervision from 08072020 267 "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period of 2020-2021"The purpose of this audit is to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 2020-2021. The purpose of this audit is compliance by a legal entity in the process of carrying out activities with mandatory requirements for the safe conduct of work at electric power facilities, safety requirements in the field of electric power aimed at ensuring reliable power supply in preparing enterprises for the upcoming winter period


# 502005192468
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration:
Authority:
Purpose of inspection:


# 002004472554
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-21, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the progress of preparation of electric power facilities for operation in the autumn winter period of 2020-2021 on the basis of the instruction of the Government of the Russian Federation from 03072020 YUBP97109 and the order of the Federal Service for Environmental Technological and Nuclear Supervision from 08072020 267 On the progress of preparation of electric power and heat supply facilities for operation in the autumn winter period of 20202021 The purpose of this inspection is to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 2020-2021, the subject of this audit is compliance by a legal entity in the course of carrying out activities with mandatory requirements for the safe conduct of work at electric power facilities, safety requirements in the field of electric power industry aimed at ensuring reliable power supply in preparing enterprises for the upcoming autumn-winter period


# 002004474448
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-21, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 20202021 on the basis of the instruction of the Government of the Russian Federation dated 03072020 YUBP97109 and the order of the Federal Service for Environmental Technological and Nuclear Supervision dated 08072020267 "On monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period of 20202021"The purpose of this audit is to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 2020-2021


# 502004470384
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: check


# 002004477800
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-28, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparation of electric power facilities for operation in the autumn-winter period of 20202021 on the basis of the instruction of the Government of the Russian Federation from 03072020 YUBP97109 and the order of the Federal Service for Environmental Technological and Nuclear Supervision from 08072020 267 "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period of 20202021"The objective of this audit is to monitor the progress of preparation of electric power facilities for operation in the autumn-winter period of 2020-2021


# 002004940857
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-08-07, duration: 20
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated July 08, 2020 267 "On monitoring the progress of preparation of electric power and heat supply facilities for operation in the autumn-winter period of 2020-2021" issued on the basis of an instruction from the Government of the Russian Federation dated July 03, 2020 YUBP97109


# 772004322745
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the execution of the instruction GPN 4211 of 30032017g 1111 of 27022019g on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire, the subject of this audit is to note the necessary fulfillment of the instructions of state control bodies supervision of municipal control bodies the tasks of this audit are the prevention detection and suppression of violations by organizations and citizens of the requirements established the legislation of the Russian Federation on fire safety


# 772004253333
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-03-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of the instruction to eliminate violations of mandatory fire safety requirements dated March 05, 2019 4711, the deadline for which expires is the implementation, in accordance with the procedure established by the legislation of the Russian Federation, of checking compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them and taking measures based on the results of the audit, compliance with the instructions of the authorities state control supervision of municipal control bodies


# 772004220341
Unscheduled inspection
Start date: 2020-01-14, end date: 2020-02-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of regulation 1 of 27022019 on the elimination of violations of requirements in the field of protection of the population and territories from natural and man-made emergencies, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with requirements in the field of protection of the population and territories from natural and man-made emergencies prescribed for elimination by a previously issued prescription, as well as taking measures based on the results inspections Compliance with the instructions of state control bodies supervision of municipal control bodies


# 772004200875
Unscheduled inspection
Start date: 2020-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 771904140200
Unscheduled inspection
Start date: 2019-12-20, end date: 2020-01-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 771904150436
Unscheduled inspection
Start date: 2019-12-25, end date: 2020-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used


# 771904096305
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 001903713366
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-12, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to control the execution by the branch of PJSC MOESK Northern Electric Networks of the previously issued instruction dated 30082019 312107P07322019 hereinafter referred to as the Instruction, the deadline for which has expired The task of this inspection is to establish the facts of non-fulfillment by the branch of PJSC MOESK Northern Electric Networks of the Prescription


# 001904072695
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-11-29, duration:
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of the audit received from Gazpromneftepz JSC on the issue of violations of the operation of electrical installations at the address In the Fields of the Kapotnya Refinery, Moscow 109429the objectives of this audit are to monitor the measures taken to comply with mandatory safety requirements in the electric power industry by a legal entity, an individual entrepreneur, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of the adoption of measures to eliminate violations of mandatory requirements in the event of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulations


# 771904041635
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-23, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the execution of a previously issued order on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire 321113ot 25092018


# 771904032655
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to ensure that the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code complies with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 501903801806
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801803
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801800
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801790
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801788
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801787
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801785
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801784
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801783
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801780
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 501903801778
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration:
Authority: Glavnoe upravlenie Moskovskoi oblasti Gosudarstvennaya zhilischnaya inspekciya Moskovskoi oblasti
Purpose of inspection: Compliance with the instructions of state control bodies, supervision of municipal control bodies, Verification of the fulfillment of prescriptions, verification of the implementation of measures according to the prescription


# 771903895627
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person being audited, to ensure that the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code complies with the performance of works and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work to the requirements of technical regulations of the design documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 001903716054
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-01, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of the regulation of 30082019 312106vnP07372019


# 001903713387
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-01, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution by the branch of PJSC MOESK Southern Electric Networks of the previously issued prescription dated 16082019 312048P06692019 has been given an instruction the deadline for which has expired The task of this audit is to establish the facts of the fulfillment of the fulfillment by the branch of PJSC MOESK Southern Electric Networks of the prescriptionthe subject of this audit is the fulfillment of the Prescription by a legal person


# 001903712067
Unscheduled inspection
Start date: 2019-10-22, end date: 2019-11-01, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the execution by the branch of PJSC MOESK Eastern Electric Networks of the previously issued regulation dated 27082019 312105vnP07182019, the deadline for which has expired


# 771903820479
Unscheduled inspection
Start date: 2019-10-09, end date: —, duration:
Authority:
Purpose of inspection:


# 771903845086
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-11-01, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: this inspection is carried out in order to monitor the implementation of the points of the previously issued prescription dated 21122018 69711, the deadline for which expired on 01092019. The objectives of this inspection are to carry out, in accordance with the procedure established by the legislation of the Russian Federation, verification of compliance with fire safety requirements at the protection facility established by federal laws and other regulatory legal acts of the Russian Federation adopted in accordance with them and taking measures based on the results The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.