# 001902926784
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 14 marta 2019 g 208G3320vnppZadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 001902550701
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 21112018 845G3320vnpp vydannogo ZAO «UKS IKSiD»
# 001801998965
Unscheduled inspection
Start date: 2018-11-20, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800589006
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 10052018 g 312G3327vnpp
# 00180803046979
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-22, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 11102017 g 562G3327vnpp
# 00170802654937
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062017 g 270G3327vnpp
# 00170701743605
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701478718
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062016 g 270G3327vnpp
# 772101506439
Unscheduled inspection
Start date: 2021-12-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101482659
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101461901
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101383426
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101258486
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101201951
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100548241
Unscheduled inspection
Start date: 2021-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100355212
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100341227
Unscheduled inspection
Start date: 2021-07-09, end date: 2021-08-05, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the person being checked; The subject of the audit: compliance by the person carrying out construction with the requirements of part 3 of Article 52 of the Urban Planning Code materials in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100375836
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100274012
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-25, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100247991
Unscheduled inspection
Start date: 2021-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100228271
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-06-07, duration: 13
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772100066466
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772105309658
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772105309656
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772105329125
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005272828
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-22, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005283860
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005259559
Unscheduled inspection
Start date: 2020-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005290343
Unscheduled inspection
Start date: 2020-12-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005288215
Unscheduled inspection
Start date: 2020-12-25, end date: 2021-01-15, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005256332
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005229576
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005237674
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005192203
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004478743
Unscheduled inspection
Start date: 2020-08-04, end date: 2020-08-24, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004523780
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004448772
Unscheduled inspection
Start date: 2020-07-09, end date: 2020-07-29, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004429769
Unscheduled inspection
Start date: 2020-06-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004442713
Unscheduled inspection
Start date: 2020-06-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004414934
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverkiprovedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchikao zavershenii stroitelstva etapa 5 Peshehodnyi most 3 i etapa 7 Peshehodnyi most 5Zadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkisootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 772004346287
Unscheduled inspection
Start date: 2020-03-09, end date: 2020-03-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004370622
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004380522
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-04-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 772004338378
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004269031
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004279956
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-02-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004293061
Unscheduled inspection
Start date: 2020-02-18, end date: 2020-02-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004214664
Unscheduled inspection
Start date: 2020-01-21, end date: 2020-02-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004210239
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904047108
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision
# 771904145178
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of the notification of the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of Mosgosstroynadzor
# 771904084522
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904098966
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903998959
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904035250
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904013606
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903951031
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771903961283
Unscheduled inspection
Start date: 2019-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903895637
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903809516
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903854402
Unscheduled inspection
Start date: 2019-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903843670
Unscheduled inspection
Start date: 2019-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903858837
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903706350
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803490357
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903597718
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803490566
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803477924
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803479762
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-08-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803484094
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-09-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001902926784
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 14 marta 2019 g 208G3320vnppZadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktov7 Predmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 77190803475459
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-09-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803474797
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-08-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803456823
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803453132
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803451375
Unscheduled inspection
Start date: 2019-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803454283
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803434740
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803434513
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803432448
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803438650
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803438859
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-07-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803444417
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803429923
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803446642
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803432241
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803411011
Unscheduled inspection
Start date: 2019-05-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803409934
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803396378
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803398698
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803403522
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803386375
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803384785
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803405536
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-05-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu provedenie meropriyatii po kontrolyu v svyazi s postupleniem izvescheniya zastroischika zakazchika na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 267019 ot 15042019
# 77190803387010
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803391505
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902550701
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 21112018 845G3320vnpp vydannogo ZAO «UKS IKSiD»
# 77190803373218
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803376847
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803380373
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803378059
Unscheduled inspection
Start date: 2019-03-25, end date: 2019-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu provedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniya na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 1106418 ot 12122018
# 77190803375922
Unscheduled inspection
Start date: 2019-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803338926
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803328755
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803328691
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803323303
Unscheduled inspection
Start date: 2019-01-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803314928
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to eliminate violations specified in the order issued by Mosgosstroynadzor. The tasks of the audit are to prevent identify and suppress violations of technical regulations and project documentationby the person being audited. The subject of the audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803314131
Unscheduled inspection
Start date: 2019-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803316192
Unscheduled inspection
Start date: 2019-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803316883
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803320665
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803305589
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803309781
Unscheduled inspection
Start date: 2018-12-28, end date: 2019-01-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803309709
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803293943
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803297669
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803296384
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803298138
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803298464
Unscheduled inspection
Start date: 2018-12-17, end date: 2019-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the presence of a certificate of admission issued by a self-regulating organization to works that affect the safety of capital construction facilities, the presence of a construction permit, the compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803302169
Unscheduled inspection
Start date: 2018-12-18, end date: 2019-01-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 001801998965
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 06082018 g 597G3327vnpp
# 77180803268451
Unscheduled inspection
Start date: 2018-11-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803258044
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803255206
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803262574
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803255207
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803265651
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803264538
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-11-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803265107
Unscheduled inspection
Start date: 2018-10-31, end date: 2018-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803248420
Unscheduled inspection
Start date: 2018-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803250696
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803255205
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803229999
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803230694
Unscheduled inspection
Start date: 2018-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803224087
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-10-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803224460
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803225635
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803238337
Unscheduled inspection
Start date: 2018-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803222104
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-09-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803201163
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803193235
Unscheduled inspection
Start date: 2018-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803214806
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-08-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803198431
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800589006
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 10052018 g 312G3327vnpp
# 77180803198430
Unscheduled inspection
Start date: 2018-08-09, end date: 2018-08-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803198414
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803202325
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803210262
Unscheduled inspection
Start date: 2018-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803210358
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803210121
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-09-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803210256
Unscheduled inspection
Start date: 2018-08-23, end date: 2018-08-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803208230
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803185022
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803171382
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803186195
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803186194
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803186328
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803147751
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-07-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803170944
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803167411
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-06-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803142739
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-06-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803142735
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-06-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803143558
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800345549
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-05-10, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 22012018 g 28G3327Vnpp
# 77180803123900
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803129314
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803113968
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803100520
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803101710
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803108443
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803106209
Unscheduled inspection
Start date: 2018-03-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803094843
Unscheduled inspection
Start date: 2018-03-02, end date: 2018-03-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803096842
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803096831
Unscheduled inspection
Start date: 2018-03-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803075081
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-02-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803075080
Unscheduled inspection
Start date: 2018-02-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803081850
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00180803058109
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-22, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 11102017 g 562G3327vnpp
# 00180803046979
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-22, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 11102017 g 562G3327vnpp
# 77180803082125
Unscheduled inspection
Start date: 2018-01-26, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803071861
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170803045835
Unscheduled inspection
Start date: 2017-12-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170803002234
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802939674
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802930719
Unscheduled inspection
Start date: 2017-12-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802914861
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-11-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802816645
Unscheduled inspection
Start date: 2017-11-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802892220
Unscheduled inspection
Start date: 2017-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802863236
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802863251
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802841334
Unscheduled inspection
Start date: 2017-11-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802841330
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802714720
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170802654937
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062017 g 270G3327vnpp
# 77170802674974
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802795138
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802787859
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802780144
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802530447
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802470434
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802470417
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-09-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802625065
Unscheduled inspection
Start date: 2017-09-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802614984
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801978614
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802575170
Unscheduled inspection
Start date: 2017-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701898422
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-09-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701889728
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701904025
Unscheduled inspection
Start date: 2017-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701886988
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801959862
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170801947024
Unscheduled inspection
Start date: 2017-08-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801947016
Unscheduled inspection
Start date: 2017-08-30, end date: 2017-08-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701869332
Unscheduled inspection
Start date: 2017-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801954674
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170801929555
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170801919941
Unscheduled inspection
Start date: 2017-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701806665
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701791325
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701792917
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701790938
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-08-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701784263
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-08-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00170701743605
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya predpisaniya ot 09062016 g 270G3327vnpp
# 77170701829817
Unscheduled inspection
Start date: 2017-07-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701722300
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701713261
Unscheduled inspection
Start date: 2017-06-15, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701704290
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701768673
Unscheduled inspection
Start date: 2017-06-30, end date: 2017-06-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701768188
Unscheduled inspection
Start date: 2017-06-30, end date: 2017-07-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701689651
Unscheduled inspection
Start date: 2017-06-08, end date: 2017-06-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701695785
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701772957
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701744531
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701739836
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701637170
Unscheduled inspection
Start date: 2017-05-18, end date: 2017-05-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701637022
Unscheduled inspection
Start date: 2017-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701603017
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701599338
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701636823
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701589017
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701636811
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701558965
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-04-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701558925
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-04-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701537735
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701537739
Unscheduled inspection
Start date: 2017-04-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701478718
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062016 g 270G3327vnpp
# 77170701588487
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701558960
Unscheduled inspection
Start date: 2017-04-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701466814
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701466800
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701466808
Unscheduled inspection
Start date: 2017-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701466798
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701463253
Unscheduled inspection
Start date: 2017-03-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701450965
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701432540
Unscheduled inspection
Start date: 2017-03-07, end date: 2017-03-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701489536
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-03-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701488955
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701429522
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701484241
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-04-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701476966
Unscheduled inspection
Start date: 2017-03-22, end date: 2017-04-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701466839
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701466817
Unscheduled inspection
Start date: 2017-03-20, end date: 2017-03-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701398986
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701389743
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701391764
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701387750
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701374774
Unscheduled inspection
Start date: 2017-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701333110
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701398988
Unscheduled inspection
Start date: 2017-02-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701402384
Unscheduled inspection
Start date: 2017-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701298265
Unscheduled inspection
Start date: 2017-01-13, end date: 2017-02-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701302357
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170701294485
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062016 g 270G3327vnpp
# 77170701341948
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701348562
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-01-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701302632
Unscheduled inspection
Start date: 2017-01-09, end date: 2017-01-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701302421
Unscheduled inspection
Start date: 2017-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701330543
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701316684
Unscheduled inspection
Start date: 2017-01-20, end date: 2017-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701314914
Unscheduled inspection
Start date: 2017-01-20, end date: 2017-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701247190
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701239921
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701287958
Unscheduled inspection
Start date: 2016-12-30, end date: 2017-01-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701287963
Unscheduled inspection
Start date: 2016-12-30, end date: 2017-01-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701271117
Unscheduled inspection
Start date: 2016-12-26, end date: 2017-01-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701202014
Unscheduled inspection
Start date: 2016-12-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701195562
Unscheduled inspection
Start date: 2016-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701195560
Unscheduled inspection
Start date: 2016-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701252637
Unscheduled inspection
Start date: 2016-12-20, end date: 2016-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701194432
Unscheduled inspection
Start date: 2016-11-30, end date: 2016-12-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701107285
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 1050316 ot 07102016
# 77160701101835
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of a construction permit compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701161456
Unscheduled inspection
Start date: 2016-11-24, end date: 2016-12-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701161461
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701017304
Unscheduled inspection
Start date: 2016-10-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700999859
Unscheduled inspection
Start date: 2016-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701052063
Unscheduled inspection
Start date: 2016-10-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160701040620
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 1002916 ot 23092016
# 77160700854898
Unscheduled inspection
Start date: 2016-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700854880
Unscheduled inspection
Start date: 2016-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700854811
Unscheduled inspection
Start date: 2016-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700886238
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo o nachale rabot pri osuschestvlenii kotoryh predusmotren gosudarstvennyi stroitelnyi nadzorZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 77160700154875
Unscheduled inspection
Start date: 2016-09-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700560678
Unscheduled inspection
Start date: 2016-09-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700792469
Unscheduled inspection
Start date: 2016-09-16, end date: 2016-09-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program The tasks of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160601789049
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka provoditsya s celyu ustanovlenie faktov narusheniya tehnicheskih reglamentov i proektnoi dokumentacii povlekshih prichinenie vreda zhizni zdorovyu lyudei okruzhayuschei srede bezopasnosti gosudarstva imuschestvu fizicheskih i yuridicheskih lic gosudarstvennomu ili municipalnomu imuschestvu na osnovanii postupivshego obrascheniya o faktah proizoshedshei avarii narushenii tehnicheskih reglamentov inyh normativnyh pravovyh aktov i proektnoi dokumentacii pri vypolnenii rabot v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva v tom chisle narushenii obyazatelnyh trebovanii k primenyaemym stroitelnym materialam povlekshih prichinenie vreda zhizni zdorovyu lyudei okruzhayuschei srede bezopasnosti gosudarstva imuschestvu fizicheskih i yuridicheskih lic gosudarstvennomu ili municipalnomu imuschestvuZadachami nastoyaschei proverki yavlyayutsya prinyatie nezamedlitelnyh mer predusmotrennyh zakonodatelstvomPredmetom nastoyaschei proverki yavlyaetsya nalichie razresheniya na stroitelstvo
# 77160700083938
Unscheduled inspection
Start date: 2016-08-26, end date: 2016-08-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 793916 ot 29072016
# 77160601782219
Unscheduled inspection
Start date: 2016-08-08, end date: 2016-08-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob ustranenii narusheniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom bn ot 14072011
# 77160601750644
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-07-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 736916 ot 18072016
# 77160601743413
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-07-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and project documentation on the basis of the approved verification program The tasks of this audit are to prevent identify and suppress violations of technical regulations and project documentation committed by the audited person. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including among the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160601700854
Unscheduled inspection
Start date: 2016-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160601714975
Unscheduled inspection
Start date: 2016-07-13, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160601707118
Unscheduled inspection
Start date: 2016-07-11, end date: —, duration: —
Authority: —
Purpose of inspection: