Found 53 inspections:

# 002004409042
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: 20
Authority: Priamurskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: execution of the order of Rosprirodnadzor dated 18072019 17p, issued in accordance with the instruction of the Deputy Chairman of the Government of the Russian Federation AV Gordeev dated 17062019 AGP94932 DSP, the objectives of this audit are to monitor the compliance of LLC RESOURCES ALB AZINO with the mandatory requirements of the legislation of the Russian Federation on subsoil when carrying out activities related to the use of subsoil in the licensed area HUB 02309 BR for geological exploration and exploration mining on the eastern flank of the Albazinsky ore field located in the Polina Osipenko area of the Khabarovsk Territory


# 002004237493
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to monitor the implementation of LLC "Resources Albazino" previously issued by the Far Eastern Directorate of Rostechnadzor regulations dated 25112019 PA71926 p 16The purpose of this audit is to verify the elimination of LLC "Resources Albazino" previously identified violations. The purpose of this audit is to comply with LLC "Resources Albazino" regulations of the Far Eastern Directorate of Rostechnadzor dated 25112019 PA71926 p 16


# 001903887816
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the elimination of previously identified violations by Resources Albazino LLC. The subject of this audit is the fulfillment by Resources Albazino LLC of the regulations of the Far Eastern Directorate of Rostechnadzor dated 23072019 PA71438 p 115, the implementation of measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, and the prevention of natural and man-made emergencies.


# 001902454662
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of the fulfillment by Albazino Resources LLC, hereinafter referred to as the subsurface user, of the instruction on the elimination of violations of legislation in the field of subsurface use and protection of subsoil dated 02112017 07292 legally issued by the Department of Rosprirodnadzor for the Far Eastern Federal District, hereinafter referred to as the Department, based on the results of a planned on-site inspection of the enterprise inspection act dated November 02, 2017 07292017


# 001801774572
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-29, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of the fulfillment by Albazino Resources LLC, hereinafter referred to as the subsurface user, of the instruction on the elimination of violations of legislation in the field of subsurface use and protection of subsurface resources dated 02112017 07293 legally issued by the Department of Rosprirodnadzor for the Far Eastern Federal District, hereinafter referred to as the Department, based on the results of a planned on-site inspection of the enterprise inspection act dated November 02, 2017 07292017 on the basis of an order from the Federal Service for Supervision of Natural Resources Management dated 24022016 OD0201363034 pursuant to the instruction of the Government of the Russian Federation dated 11022016 AHP9726 and the written request of vh dated 18092018 8688 from Albazino Resources LLC on the early elimination of violations and verification of the specified regulation, the deadline for the execution of the regulation expires on 01112018


# 00170802906078
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to comply with the order


# 00160601593729
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-04-29, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution by a legal entity of the PF7111 instruction previously issued by the Far Eastern Directorate of Rostechnadzor, the deadline for which has expired


# 00150601288188
Unscheduled inspection
Start date: 2015-10-22, end date: 2015-10-23, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Implementation of state control over compliance with the requirements of Regulation 0311 dated August 21, 2015, due by August 21, 2015


# 00150601335988
Unscheduled inspection
Start date: 2015-10-22, end date: 2015-10-23, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Implementation of state control over the fulfillment of the requirements of paragraphs 1 2 3 of Regulation 0311 dated August 21, 2015 with a deadline of October 21, 2015


# 00150601103640
Unscheduled inspection
Start date: 2015-09-01, end date: 2015-09-01, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance with the requirements of paragraphs 12 of Regulation 0305 dated June 29, 2015 by the order for execution until July 29, 2015, the deadline for execution was postponed by Order of the Amur UGMRN of Rostransnadzor 225 dated June 27072015 to 01092015


# 00150600040385
Unscheduled inspection
Start date: 2015-09-01, end date: 2015-09-01, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance with the requirements of paragraphs 12 of Regulation 0305 dated June 29, 2015 with a deadline of 29072015 by Order 225rd dated 27072015, the deadline was postponed to 01092015


# 272100287321
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority:
Purpose of inspection:


# 272100287327
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 20
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose: to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 5.1 of Article 6 of the Urban Planning Code of the Russian Federation. Task: to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer (hereinafter referred to as the contractor). The subject of this review is: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2, and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices energy resources used; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 272100287304
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 272100287291
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 20
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose: to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 5.1 of Article 6 of the Urban Planning Code of the Russian Federation. Task: to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer (hereinafter referred to as the contractor). The subject of this review is: a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2, and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices energy resources used; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 272100287287
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 272004419185
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 272004415997
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of implementing regional state construction supervision based on the inspection program from 270-42020the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development and project documentationthe subject of the inspection is to verify the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation in including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources.


# 002004409042
Unscheduled inspection
Start date: 2020-05-12, end date: 2020-06-08, duration: 20
Authority: Priamurskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: execution of the order of Rosprirodnadzor dated 18072019 17p, issued in accordance with the instruction of the Deputy Chairman of the Government of the Russian Federation AV Gordeev dated 17062019 AGP94932 DSP, the objectives of this audit are to monitor the compliance of LLC RESOURCES ALB AZINO with the mandatory requirements of the legislation of the Russian Federation on subsoil when carrying out activities related to the use of subsoil in the licensed area HUB 02309 BR for geological exploration and exploration mining on the eastern flank of the Albazinsky ore field located in the Polina Osipenko area of the Khabarovsk Territory


# 272004390655
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-05-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: protection of the rights and interests of an employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 002004237493
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to monitor the implementation of LLC "Resources Albazino" previously issued by the Far Eastern Directorate of Rostechnadzor regulations dated 25112019 PA71926 p 16The purpose of this audit is to verify the elimination of LLC "Resources Albazino" previously identified violations. The purpose of this audit is to comply with LLC "Resources Albazino" regulations of the Far Eastern Directorate of Rostechnadzor dated 25112019 PA71926 p 16


# 002004207302
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-02-14, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of compliance with the instructions of the Department of Rosprirodnadzor for the Far Eastern Federal District (hereinafter referred to as the Department) dated 01112017 07291 on the elimination of violations committed by LLC RESOURCES ALBAZINO of violations of the terms of use of subsurface resources under the license HUB 01966 BR The deadline for the execution of the instructions expired 15012020


# 001903887816
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify the elimination of previously identified violations by Resources Albazino LLC. The subject of this audit is the fulfillment by Resources Albazino LLC of the regulations of the Far Eastern Directorate of Rostechnadzor dated 23072019 PA71438 p 115, the implementation of measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, and the prevention of natural and man-made emergencies.


# 271903346534
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of implementing regional state construction supervision on the basis of the notice of completion dates of works subject to inspection dated September 02, 2019, BX 3994 dated September 03, 2019, the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development and project documentation. The subject of the inspection is to verify the compliance of the work and the construction materials used in during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 271902860655
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program dated 03072019the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development and project documentationthe subject of the inspection is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation in including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources.


# 001902454662
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of the fulfillment by Albazino Resources LLC, hereinafter referred to as the subsurface user, of the instruction on the elimination of violations of legislation in the field of subsurface use and protection of subsoil dated 02112017 07292 legally issued by the Department of Rosprirodnadzor for the Far Eastern Federal District, hereinafter referred to as the Department, based on the results of a planned on-site inspection of the enterprise inspection act dated November 02, 2017 07292017


# 271802185095
Unscheduled inspection
Start date: 2018-12-10, end date: 2019-01-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this audit is being conducted for the purpose of implementing regional state construction supervision on the basis of the notice of completion of the capital construction facility dated November 22, 2018 1905 vx 5830 dated November 22, 2018. The purpose of this audit is to prevent identify and suppress violations of current legislation on urban development activities, including project documentation. The subject of this audit is to verify the compliance of the work and the use of building materials during the construction of the Facility, as well as the results of such work, according to the requirements of the project documentation


# 001801774572
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-29, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of the fulfillment by Albazino Resources LLC, hereinafter referred to as the subsurface user, of the instruction on the elimination of violations of legislation in the field of subsurface use and protection of subsurface resources dated 02112017 07293 legally issued by the Department of Rosprirodnadzor for the Far Eastern Federal District, hereinafter referred to as the Department, based on the results of a planned on-site inspection of the enterprise inspection act dated November 02, 2017 07292017 on the basis of an order from the Federal Service for Supervision of Natural Resources Management dated 24022016 OD0201363034 pursuant to the instruction of the Government of the Russian Federation dated 11022016 AHP9726 and the written request of vh dated 18092018 8688 from Albazino Resources LLC on the early elimination of violations and verification of the specified regulation, the deadline for the execution of the regulation expires on 01112018


# 271800607773
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 271800608197
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 271800608072
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 001800403676
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-06, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to monitor the implementation by Albazino Resources LLC of paragraphs 5 to 6 of the order PA711026 previously issued by the Rostechnadzor Far Eastern Directorate on October 31, 2017 on the elimination of identified violations, the deadline for which expires on June 01, 2018. The objectives of this audit are to monitor the measures taken by the legal entity to comply with the order. The subject of this audit is the implementation of the order of the state control authority. carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, and the environment, and to prevent the occurrence of natural and man-made emergencies


# 001800248598
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the notice of completion of construction dated 23032018 12 vx 3501 dated 23032018 Tasks prevention identification and suppression of violations committed by the developer technical customer as well as by the person carrying out construction on the basis of a contract with the developer or technical customer further, the contractor violates the legislation on urban planning activities, including technical regulations and project documentation. The subject of verification is a the conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. availability of a building permit in compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation and 6 of the Urban Planning Code of the Russian Federation on the basis of a notice of completion of construction


# 001800248547
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 23032018 6 bx 3500 of 23032018 Tasks prevention detection and suppression of violations of legislation on urban development, including technical violations committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the technical customer, hereinafter referred to as the contractor The subject of verification is a the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used b the availability of a construction permit c the fulfillment of the requirements set out in Parts 2 to 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation and 6 of the Urban Planning Code of the Russian Federation on the basis of a notice of completion builds


# 00170802906078
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by a legal entity to comply with the order


# 27170802628667
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 15092017 054 bx dated 18092017 4383the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of work and the use of building materials in the construction process of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 27170802628629
Unscheduled inspection
Start date: 2017-10-10, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 27170802628238
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 15092017 054 bx dated 18092017 4383the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of work and the use of building materials in the construction process of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 27170802628659
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 15092017 054 bx dated 18092017 4383the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of work and the use of building materials in the construction process of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 27170701566593
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 17042017 15 bx dated 17042017 1783the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of work and the use of building materials in the construction process of the Facility as well as the results of such work meet the requirements of the technical regulations of the project documentation


# 27170701566588
Unscheduled inspection
Start date: 2017-06-05, end date: —, duration:
Authority:
Purpose of inspection:


# 27170701566585
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 17042017 13 bx dated 17042017 1783the objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of work and the use of building materials in the construction process of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 27170701285464
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 27170701285455
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 27/122016 2140 bx dated 27/122016 5502the purpose of this inspection is to monitor compliance by construction participants with legislation on urban development activities. The purpose of this inspection is to verify the compliance of the work performed and the building materials used during the construction of the Facility, as well as the results of such work requirements of the technical regulations of the project documentation


# 27170701285448
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-02-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection dated 27/122016 2140 bx dated 27/122016 5502the purpose of this inspection is to monitor compliance by construction participants with legislation on urban development activities. The purpose of this inspection is to verify the compliance of the work performed and the building materials used during the construction of the Facility, as well as the results of such work requirements of the technical regulations of the project documentation


# 27170701285474
Unscheduled inspection
Start date: 2017-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 27160701240614
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Upravlenie lesami Pravitelstva Habarovskogo kraya
Purpose of inspection: Verification of the execution of a previously issued prescription


# 27160700092081
Unscheduled inspection
Start date: 2016-08-18, end date: 2016-09-14, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 00160601593729
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-04-29, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution by a legal entity of the PF7111 instruction previously issued by the Far Eastern Directorate of Rostechnadzor, the deadline for which has expired


# 00150601288188
Unscheduled inspection
Start date: 2015-10-22, end date: 2015-10-23, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Implementation of state control over compliance with the requirements of Regulation 0311 dated August 21, 2015, due by August 21, 2015


# 00150601335988
Unscheduled inspection
Start date: 2015-10-22, end date: 2015-10-23, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Implementation of state control over the fulfillment of the requirements of paragraphs 1 2 3 of Regulation 0311 dated August 21, 2015 with a deadline of October 21, 2015


# 00150601103640
Unscheduled inspection
Start date: 2015-09-01, end date: 2015-09-01, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance with the requirements of paragraphs 12 of Regulation 0305 dated June 29, 2015 by the order for execution until July 29, 2015, the deadline for execution was postponed by Order of the Amur UGMRN of Rostransnadzor 225 dated June 27072015 to 01092015


# 00150600040385
Unscheduled inspection
Start date: 2015-09-01, end date: 2015-09-01, duration:
Authority: Amurskoe upravlenie gosudarstvennogo morskogo i rechnogo nadzora
Purpose of inspection: Verification of compliance with the requirements of paragraphs 12 of Regulation 0305 dated June 29, 2015 with a deadline of 29072015 by Order 225rd dated 27072015, the deadline was postponed to 01092015


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.