Found 7 inspections:

# 772101516523
Unscheduled inspection
Start date: 2021-12-24, end date: 2021-12-28, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101470702
Unscheduled inspection
Start date: 2021-12-15, end date: 2021-12-20, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101281497
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 772100804887
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772005200402
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-11-13, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772004499387
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-11, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 911802195018
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-21, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Respubliki Krym
Purpose of inspection: The purpose is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations, other regulations and design documentation, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation during the construction of the capital construction facility, as well as compliance of the work and the construction materials used during the construction process reconstruction of the capital construction facility as well as the results of such work to the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the presence of documents confirming the right to perform construction work when registering a declaration on the commencement of construction work on objects belonging to the 13th category of complexity or when issuing a permit to perform construction works on objects belonging to 45 categories of complexity in compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Tasks prevention detection and suppression of violations of legislation on urban development activities including technical regulations of project documentation Subject compliance with mandatory requirements


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.