# 342004326936
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the inspection is to assess the implementation of the Inspection order dated 27082019 6407 due to the expiration of the deadline for the execution of the order and the failure to submit documents confirming the execution of the order tasks are to identify and prevent violations of the law on participation in shared construction subject of the order dated 27082019 6407
# 341902918875
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the audit is to assess the fulfillment of the order from 30012019 0807 in connection with the failure of Orion LLC to provide documents confirming the fulfillment of the order, the tasks are to identify and prevent violations of the law on participation in shared-equity construction. The subject of the audit is the fulfillment of the order from 30012019 0807
# 341902698697
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-06-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the implementation of the order dated October 25, 2018 11707 issued by the Orion LLC Inspection in connection with the failure to provide documents confirming the execution of the order. The purpose of this inspection is to identify and prevent violations of the law on participation in shared-equity construction. The subject of this inspection is the implementation of the Inspection order dated October 25, 2018 11707
# 341902626819
Unscheduled inspection
Start date: 2019-04-03, end date: 2019-04-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the implementation of the order dated November 30, 2018 13207 issued by the Orion LLC Inspection in connection with the failure to provide documents confirming the execution of the order. The purpose of this inspection is to identify and prevent violations of the law on participation in shared-equity construction. The subject of this inspection is the implementation of the Inspection order dated 30112018 13207
# 341902544830
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: this inspection is carried out in connection with the expiration of 25022019 of the deadline for the execution of the order dated 29082018 10007 issued by the Orion LLC inspectorate in order to assess the execution of the order due to the failure to provide documents confirming the elimination of violations the task of this inspection is to identify and suppress violations of the legislation on participation in shared construction the subject of this inspection is the fulfillment of the inspection order dated 29082018 10007
# 341802481676
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: this audit is conducted in connection with the expiration on 24/122018 of the deadline for the execution of the order dated 03092018 10707 issued by the Orion LLC inspectorate in order to assess the execution of the order due to the failure to provide documents confirming the elimination of violations identified the task of this audit is to identify and suppress violations of the legislation on participation in shared construction the subject of this audit is the fulfillment of the inspection order dated 03092018 10707
# 341802331817
Unscheduled inspection
Start date: 2018-12-19, end date: 2019-01-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: this inspection is carried out in connection with the expiration on 17/122018 of the deadline for the execution of the order dated 06072018 8407 issued by the Orion LLC inspection in order to assess the execution of the order due to the failure to provide documents confirming the elimination of violations the task of this inspection is to identify and suppress violations of the legislation on participation in shared construction the subject of this inspection is the fulfillment of the inspection order dated 06072018 8407
# 341802183633
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800621883
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800621917
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-09-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the implementation of the instruction from 04042018 1407 issued by the Orion LLC Inspection in connection with the failure to provide documents confirming the execution of the instruction. The task is to identify and prevent violations of the legislation on participation in shared-equity construction. The subject of this audit is the implementation of the Inspection instruction from 04042018 1407
# 341800621893
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-09-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the implementation of the regulation dated 13042018 2307 issued by the Orion LLC Inspection in connection with the failure to provide documents confirming the implementation of the regulation. The task is to identify and prevent violations of the legislation on participation in shared-equity construction. The subject of this audit is the implementation of the Inspection regulation dated 13042018 2307
# 341800606796
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the assessment of the fulfillment of the order dated 22012018 0307 issued by the Inspection of Orion LLC in connection with the failure to provide documents confirming the fulfillment of the order the purpose of this audit is to identify and prevent violations of the law on participation in shared-equity construction The subject of this audit is the fulfillment of the Inspection order dated 22012018 0307
# 341800445300
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of the fulfillment of the order dated 05122017 13207 issued by the Orion LLC inspection in connection with the expiration of the deadline for the fulfillment of the order the purpose of this inspection is to identify and prevent violations of the legislation on participation in shared construction the subject of this inspection is the fulfillment of the inspection order dated 05122017 13207
# 341800352240
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the inspection is to assess the implementation of the regulation dated October 30, 2017 11007 tasks identification and suppression of violations of the legislation on participation in shared-equity construction the subject of the inspection is the implementation of the Inspection regulation dated 30102017 11007
# 341800217948
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-04-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to verify the fulfillment of the order dated 17112017 12207 issued by the Orion LLC inspection in connection with the failure to provide documents confirming the fulfillment of the order, the task of this inspection is to identify and prevent violations of the law on participation in shared-equity construction. The subject of this inspection is the fulfillment of the inspection order dated 17112017 12207
# 341800193380
Unscheduled inspection
Start date: 2018-03-06, end date: 2018-04-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to verify the fulfillment of the order dated 30102017 10907 issued by the Orion LLC inspection in connection with the failure to submit documents confirming the fulfillment of the order, the task of this inspection is to identify and prevent violations of the law on participation in shared-equity construction. The subject of this inspection is the fulfillment of the inspection order dated 30102017 10907
# 34170803014151
Unscheduled inspection
Start date: 2017-12-18, end date: 2018-01-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the audit is to assess the implementation of the regulation from 16062017 7407 the task is to identify and prevent violations of the legislation on participation in shared-equity construction the subject of the audit is the implementation of the regulation from 16062017 7407
# 34170802841199
Unscheduled inspection
Start date: 2017-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170802691631
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the audit is to assess the fulfillment of the order from 04082017 8807 in connection with the failure of Orion LLC to provide documents confirming the fulfillment of the order, the tasks are to identify and prevent violations of the law on participation in shared-equity construction. The subject of the audit is the fulfillment of the order from 04082017 8807
# 34170802690942
Unscheduled inspection
Start date: 2017-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701847581
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701650710
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701650699
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701650683
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the applied construction materials to the requirements of the technical regulations of the project documentation b the availability of a construction permit c the fulfillment of the established requirements for admission to construction work
# 34170701624788
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and prevent violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit and compliance with established requirements for admission to construction work
# 34170701623719
Unscheduled inspection
Start date: 2017-05-13, end date: 2017-06-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the audit is to assess the fulfillment of the order dated 09112016 8907 in connection with the failure of ORION LLC to provide documents confirming the fulfillment of the order, the tasks are to identify and prevent violations of the law on participation in shared-equity construction. The subject of the audit is the fulfillment of the order dated 09112016 8907
# 34170701505422
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701505363
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701521133
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-05-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose of the audit is to assess the fulfillment of the order dated 14122016 10007 in connection with the failure of Orion LLC to provide documents confirming the fulfillment of the order, the tasks are to identify and prevent violations of the law on participation in shared-equity construction. The subject of the audit is the fulfillment of the order dated 14122016 10007
# 34170701432140
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701432115
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701432054
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701387469
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and prevent violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit and compliance with established requirements for admission to construction work
# 34170701409311
Unscheduled inspection
Start date: 2017-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701409176
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701354036
Unscheduled inspection
Start date: 2017-02-03, end date: 2017-02-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation, the purpose of this audit is to prevent identify and prevent violations of the legislation of the Russian Federation, including technical regulations and project documentationthe purpose of this audit is to eliminate the comments on the unscheduled inspection act dated 30122016 646 issued by Orion LLC during the construction of the facility.
# 34160701264139
Unscheduled inspection
Start date: 2016-12-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160701089742
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-12-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the fulfillment of the order dated 05072016 5107 in connection with the failure of Orion LLC to provide documents confirming the fulfillment of the order, the task of this audit is to identify and prevent violations of the law on participation in shared-equity construction
# 34160701140438
Unscheduled inspection
Start date: 2016-11-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160701140394
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-01, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used with the requirements of urban planning legislation, including technical regulations and project documentation, the purpose of this audit is to prevent the identification of and the suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation. The purpose of this audit is to comply with the mandatory requirements regarding the compliance of construction works, their results and the construction materials used with the requirements of technical regulations and project documentation, and the availability of a construction permit and compliance with the established requirements for admission to construction work
# 34160700718974
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160700716165
Unscheduled inspection
Start date: 2016-10-07, end date: 2016-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Objective To assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, including technical regulations and project documentation Tasks to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject to compliance with mandatory requirements regarding the conformity of construction work their results and the construction materials used meet the requirements of the technical regulations of the project documentation and the availability of a construction permit and the fulfillment of the established requirements for admission to construction work
# 34160700718885
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160700901527
Unscheduled inspection
Start date: 2016-09-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160601772559
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit, and compliance with established requirements for admission to construction work
# 34160601690904
Unscheduled inspection
Start date: 2016-06-29, end date: 2016-07-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation
# 34160601690955
Unscheduled inspection
Start date: 2016-06-29, end date: 2016-07-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of the activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation