# 022100021486
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-10, duration: —
Authority: YUzhno-Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: fulfillment of the prescription dated 02/28/2020 No. 76-P
# 001902905636
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-26, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the compliance of the work performed during the construction of the capital construction facility "UPN Oil treatment Plant with a capacity of 5 million tenge of the Sladkovskozarechnoye field" Stage 1 and the information contained in the notice of commencement of construction dated 12072019
# 562101338521
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: – this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the notice of LLC "Sladkovsko-Zarechnoye" dated 10/29/2021 No. 1 on the elimination of violations during the construction of a capital construction facility;
– the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation).
- the subject of this audit is to verify the implementation of measures to eliminate violations identified as a result of an inspection of a capital construction facility (an inspection report from 24.09.2021 №41/08-03-19-58-75, an order from 15.10.2021 № 41/08-03-19-58-75/ n)
# 562101338519
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: – this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the notice of LLC "Sladkovsko-Zarechnoye" dated 10/29/2021 No. 1 on the elimination of violations during the construction of a capital construction facility;
– the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation).
- the subject of this audit is to verify the implementation of measures to eliminate violations identified as a result of an inspection of a capital construction facility (an inspection report from 24.09.2021 №41/08-03-19-58-75, an order from 15.10.2021 № 41/08-03-19-58-75/ n)
# 562100724323
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562100724474
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: – this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 08/16/2021;
– the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation).
- the subject of this audit is compliance with:
1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
2) building permit requirements;
3) the requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
4) requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts;
5) paragraph 1 of the inspection program approved on 08/16/2021 (development of well sites No. 1, No. 2, and AGZU)
# 562100245646
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 592100222350
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 2 of the program for inspections of the capital construction facility "Development of the bush site No. 3 of the Koshinsky oil field. Oil pipeline from bush site No. 1 of the Koshinskoye oil field to the Sladkovsko-Zarechnoye oil field" Stages 1,2
# 592100238940
Unscheduled inspection
Start date: 2021-06-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 592100203748
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to: verify the compliance of the work specified in paragraph 1 of the program for inspections of the capital construction facility "Oil pipeline from single well No. 1 of the Yasnopolyansk oil field to the point of insertion into the "Oil pipeline from the bush site No. 1 of the Koshinsky oil field" to the PNN of the Sladkovsko-Zarechnoye oil field" Stages 1, 2.
The objectives of this audit are: prevention, detection and suppression of violations of urban planning legislation, including technical regulations, and project documentation committed by the developer, the customer, and persons engaged in construction based on a contract with the developer or the customer (hereinafter referred to as the contractor).
The subject of this review is:
- verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility "Oil pipeline from single well No. 1 of the Yasnopolyansk oil field to the point of insertion into the "Oil pipeline from the bush site No. 1 of the Koshinskoye oil field" to the PNN of the Sladkovsko-Zarechnoye oil field" Stages 1, 2, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources;
- availability of a building permit;
- verification of compliance with the requirements of Parts 2, 3 and 3_1 of Article 52 of Federal Law No. 190-FZ dated December 29, 2004 "Urban Planning Code of the Russian Federation".
# 592100051766
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-12, duration: 6
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: inspection of the completed construction of the capital construction facility "Development of the bush site No. 3 of the Koshinsky oil field. Oil pipeline from bush site No. 1 of the Koshinsky oil field to the Sladkovsko-Zarechny oil field refinery" Stage 6
# 562100065424
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
- implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the builder, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for energy resources used;
# 562100065621
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the builder, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for energy resources used;
# 562100065553
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
- implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the builder, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for energy resources used;
# 562100065283
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of a notice of the start of construction, a program of inspections;
- the objectives of this audit are: to identify and prevent violations of the legislation on urban planning activities committed by the developer, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in respect of capital construction facilities specified in Part 1 of Article 54 of the Urban Development Code of the Russian Federation is the inspection:
- compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used;
# 562100065240
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the builder, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for energy resources used;
# 562100065513
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the builder, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for energy resources used;
# 592100060325
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-12, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 1 of the program for inspections of the capital construction facility "Development of the bush site No. 3 of the Koshinsky oil field. Oil pipeline from bush site No. 1 of the Koshinsky oil field to the Sladkovsko-Zarechny oil field" Stages 1,2
# 022100021486
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-10, duration: —
Authority: YUzhno-Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: fulfillment of the prescription dated 02/28/2020 No. 76-P
# 562105333039
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-03-12, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Federal State supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms
# 562105313228
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-16, duration: 12
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of notification of the start of construction, inspection program;
- the objectives of this audit are: to identify and prevent violations of the legislation on urban planning activities committed by the builder, and to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in respect of capital construction facilities specified in Part 1 of Article 54 of the Urban Development Code of the Russian Federation is the inspection:
- compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements capital construction facility with metering devices for used energy resources;
# 002105315667
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-05, duration: 10
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 6 of the program for inspections of the capital construction facility "Oil treatment plant (UPN) with a capacity of 5 million tons/g. Sladkovsko-Zarechny deposit" 1st Stage
# 562005255990
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-07, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 562005255956
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-07, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 002005214094
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-18, duration: 10
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 562005187248
Unscheduled inspection
Start date: 2020-10-16, end date: 2020-10-19, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 562005187261
Unscheduled inspection
Start date: 2020-10-16, end date: 2020-10-19, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 002005098605
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-12, duration: 8
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 562005137019
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-06, duration: 0
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260
# 562005184903
Unscheduled inspection
Start date: 2020-10-13, end date: 2020-10-26, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260administrative regulations for the Federal Service for Labor and Employment of the state function for the implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms approved by Order of the Ministry of Labor and Social Protection of the Russian Federation dated 13062019 N 160
# 002004439713
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-14, duration: 9
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 562004376710
Unscheduled inspection
Start date: 2020-03-26, end date: 2020-03-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 562004240245
Unscheduled inspection
Start date: 2020-01-29, end date: 2020-02-26, duration: —
Authority: YUzhnoUralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: verification of the facts stated in the collective appeals of residents of Tashla Sborodinskoye and other villages of the Tashlinsky district of the Orenburg region about the unfavorable environmental situation in these settlements during the company's production activities for the extraction of hydrocarbons
# 002004158585
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 561904158543
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 561904157649
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 561904109943
Unscheduled inspection
Start date: 2019-12-18, end date: 2020-01-22, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: Purpose confirmation of the facts of identification of signs of violations of the requirements of the legislation of the Russian Federation based on the results of the administrative survey of the land relations facility for which the legislation of the Russian Federation provides for administrative and other liability Act of the administrative survey of the land relations facility 152019 dated 27/12/2019 motivated submission on the appointment of an unscheduled inspection of compliance with land legislation 19 dated 09/122019 in accordance with the order of the Ministry of Economic Development of the Russian Federation dated 09.012018 7 signs of violation land legislation falls under item 3 of the mandatory requirements risk indicators used to determine the need for unscheduled inspections carried out by the Federal Service for State Registration of Cadastre and Cartography and its territorial bodies of State Land Supervision. The purpose of this audit is to ensure that LLC Sladkovskozarechnoye complies with land legislation requirements for the protection and use of land and compliance with mandatory requirements or requirements established by municipal legal acts. acts
# 561903929682
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 561903943109
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-11-29, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: compliance with the requirements of labor legislation
# 001903758965
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the work specified in paragraph 1 of the program for inspections of the capital construction facility "UPN oil treatment plant with a capacity of 5 million tenge of the Sladkovskozarechnoye field" Stage 1 from 30072019
# 561903574852
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 561903655897
Unscheduled inspection
Start date: 2019-09-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561903655382
Unscheduled inspection
Start date: 2019-09-26, end date: 2019-09-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification of the start of construction of the inspection program the objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities committed by the developer, perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 561902925814
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-30, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to verify compliance with the regulation of 01082018 PNE1481 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirementsthe purpose of this audit is to confirm compliance with the regulation of 01082018 PNE1481 on the elimination of violations of legislation in the field of environmental management and environmental protection The subject of this audit is compliance with the regulations of state control bodies supervision bodies of municipal control
# 561902941977
Unscheduled inspection
Start date: 2019-08-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561902986665
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561902986494
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notice of the start of construction, the objectives of this audit are to identify and prevent violations of urban planning legislation by the developer, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, subject to regional state construction supervision in respect of capital construction facilities specified in part 1 of the article The purpose of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of work performed and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 561902986613
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: identification and suppression of violations of the legislation on urban development activities committed by the developer performance of work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, the subject of regional state construction supervision in respect of capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work and the construction materials used in during the construction and reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements established by Parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation for Accessibility of Social Engineering and Transport Infrastructure Facilities for the Disabled
# 561902986542
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561902986396
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notice of the beginning of construction 12082019 the objectives of this audit are to identify and prevent violations of the legislation on urban development activities committed by the developer, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, Subject to regional state construction supervision in respect of capital construction facilities specified in Part 1 The purpose of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used. building permits to meet the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation to ensure accessibility of social engineering and transport infrastructure facilities for the disabled
# 561902986349
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561902986278
Unscheduled inspection
Start date: 2019-08-21, end date: 2019-08-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the notice of the beginning of construction 12082019 the objectives of this audit are to identify and prevent violations of the legislation on urban development activities committed by the developer, to carry out work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used, Subject to regional state construction supervision in respect of capital construction facilities specified in Part 1 The purpose of Article 54 of the Urban Planning Code of the Russian Federation is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used. building permits to meet the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation to ensure accessibility of social engineering and transport infrastructure facilities for the disabled
# 561902983393
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561902983469
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 561903797711
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902905636
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-26, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the compliance of the work performed during the construction of the capital construction facility "UPN Oil treatment Plant with a capacity of 5 million tenge of the Sladkovskozarechnoye field" Stage 1 and the information contained in the notice of commencement of construction dated 12072019
# 561902649985
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-29, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to fulfill the instructions of the Deputy Chairman of the Government of the Russian Federation, DP Kozak, paragraph 10 of the minutes of the meeting dated 19092018, DKP9166pr, instructions from the head of the Federal Service for Supervision of Natural Resources, SG Radionova, dated 28022019, CP1001316118, The task of this audit is to ensure that the business entity Sladkovskozarechnoye LLC complies with the requirements of current legislation in the field of nature management and environmental protection of the Russian Federation in the field of handling of spent steel pipes of oil and gas pipelines classified as hazard class IV waste The subject of this inspection is compliance with mandatory requirements or requirements established by legal acts
# 561902608604
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-05-08, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the facts of compliance with the regulations of 01082018 PN1481 PN1482 PN1483 PN1484 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements The objectives of this audit are to confirm the facts of compliance with the regulations of 01082018 PN1481 PN1482 PN1483 PN1484 the expiration date of which is 01042019 The subject of this audit is compliance with the regulations of state control and supervision bodies
# 561902472198
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Federal State supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms
# 561802079181
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-30, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the facts of compliance with the regulations of 01082018 PNE1482 PNE1483 PNE1484 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements The objectives of this audit are to confirm the facts of compliance with the regulations of 01082018 PNE1482 PNE1483 PNE1484 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements The subject of this audit is the implementation of the regulations of the authority State control supervision
# 561801088571
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-10-09, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: Purpose confirmation of the facts of identification of signs of violations of the requirements of the legislation of the Russian Federation based on the results of the administrative survey of the land relations facility for which the legislation of the Russian Federation provides for administrative and other responsibility Act of the administrative survey of the land relations facility 3 dated 13042018 presentation on the appointment of an unscheduled inspection of compliance with land legislation 11 dated 07082018 task is to ensure compliance of Sladkovskozarechnoye LLC with land legislation requirements for protection and The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.
# 561800613564
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-27, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to establish the facts of compliance with the regulations of 15092017 PNE2141 PNE2142 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements The objectives of this audit are to confirm the facts of compliance with the regulations of 15092017 PNE2141 PNE2142 on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements The subject of this audit is the implementation of the regulations of the state control body supervision
# 561800351403
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-18, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: Purpose confirmation of the facts of identification of signs of violations of the requirements of the legislation of the Russian Federation based on the results of the administrative survey of the land relations facility for which the legislation of the Russian Federation provides for administrative and other responsibility Act of the administrative survey of the land relations facility 3 dated 13042018 presentation on the appointment of an unscheduled inspection of compliance with land legislation 3 dated 20042018 task is to ensure compliance of Sladkovskozarechnoye LLC with land legislation requirements for protection and The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.
# 56170802791134
Unscheduled inspection
Start date: 2017-10-25, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Orenburgskoi oblasti
Purpose of inspection:
# 56170802705432
Unscheduled inspection
Start date: 2017-10-12, end date: 2017-11-09, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Orenburgskoi oblasti
Purpose of inspection: The purpose of the review of the appeal of Gr Zemlyanushina EP dated 07092017 the purpose of this audit is to ensure that LLC "Sladkovskozarechnoye" complies with land legislation requirements for the protection and use of land and compliance with mandatory requirements or requirements established by municipal legal acts
# 56170801953796
Unscheduled inspection
Start date: 2017-08-28, end date: —, duration: —
Authority: —
Purpose of inspection: