Found 114 inspections:

# 001904029026
Unscheduled inspection
Start date: 2019-11-06, end date: —, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802875193
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-22, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulation dated 29092017 430920173482 the appeal of PJSC Kamgesenergostroy to the Volga Administration of Rostechnadzor notification of the elimination of violations of vx 51438C dated 02112017


# 00150601309277
Unscheduled inspection
Start date: 2015-11-11, end date: 2015-11-20, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: prescription control


# 592100298087
Unscheduled inspection
Start date: 2021-06-16, end date: —, duration: 14
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with the regulations of the West Ural Rostechnadzor Department. The purpose of this audit is to assess the completeness of the elimination of previously identified violations in accordance with this regulation. The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies.


# 592100162709
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-16, duration: 15
Authority: Zapadno-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify compliance with the instruction of the West Ural Rostechnadzor Department dated January 29, 2021 No. rp-282-6- o/P-2021 on the elimination of violations during the reconstruction of the capital construction facility "Reconstruction and technical re-equipment of the mechanical assembly and electroplating production of the RD-191 engine" according to the notice of PJSC Kamgesenergostroy dated 30.03.2021 No. 4; – the purpose of this audit is to assess the completeness of the elimination of previously identified violations according to the specified prescription. The subject of this audit is the fulfillment of the instructions of state control (supervision) bodies and municipal control bodies.


# 162105342596
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration:
Authority:
Purpose of inspection:


# 162004265173
Unscheduled inspection
Start date: 2020-02-06, end date: —, duration:
Authority:
Purpose of inspection:


# 001904029026
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-12, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination by a legal entity of previously identified violations of the mandatory requirements specified in paragraphs 19 of Regulation 23052019 43211351197 The subject of this audit is to note the necessary compliance by a legal entity as an individual entrepreneur with the totality of mandatory requirements and requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of activities with mandatory requirements, compliance with the instructions of state control and supervision authorities municipal control bodies carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, the prevention of natural and man-made emergencies, the security of the State, and the elimination of the consequences of such harm


# 161903446046
Unscheduled inspection
Start date: 2019-09-13, end date: 2019-10-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161903009667
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration:
Authority:
Purpose of inspection:


# 591902980889
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-07, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the work performed that is subject to verification during the construction of a capital construction facility. The purpose of this audit is to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation, committed by the person carrying out the construction on the basis of a contract with the developer or a technical customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, municipal control bodies


# 161902631147
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-05-14, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 001902745937
Unscheduled inspection
Start date: 2019-04-19, end date: 2019-05-23, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity, an individual entrepreneur, in the course of carrying out activities, with a set of mandatory requirements and requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of activities with mandatory requirements, compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, and the environment


# 161902526386
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161902467283
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 161902437562
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration:
Authority:
Purpose of inspection:


# 001902588642
Unscheduled inspection
Start date: 2019-01-29, end date: 2019-02-18, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of completed works according to the inspection program


# 161802177792
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of the fact of execution of the order dated 24102018 1219103301, the deadline for which expired on 24112018, and drawing up an act based on the results of the inspection, prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts, and project documentation, with the requirements of government agencies state control supervision of municipal control bodies


# 161802308761
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the project documentation


# 161801975090
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161801922623
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration:
Authority:
Purpose of inspection:


# 161801793253
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161801246033
Unscheduled inspection
Start date: 2018-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 161801428895
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-10-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: ensuring compliance with and protection of labor rights and freedoms of citizens ensuring compliance by the employer with labor legislation and other regulatory legal acts containing labor law norms


# 161801602636
Unscheduled inspection
Start date: 2018-09-07, end date: 2018-10-05, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800578555
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800625900
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 591800573918
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-08-03, duration:
Authority: Upravlenie po ekologii i prirodopolzovaniyu administracii goroda Permi
Purpose of inspection: To establish that this audit is being conducted in order to take measures to establish compliance with Regulation No. 1 on the elimination of violations of forest legislation dated 25052018, issued as a result of an unscheduled on-site inspection conducted against Public Joint Stock Company KamGesEnergoStroy in accordance with the order of the Head of the Department for Ecology and Nature Management of the Perm City Administration dated 27042018 SAD059330106p11 The purpose of this audit is to identify and prevent harmful effects in urban forests, when carrying out economic and other activities, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts, measures to prevent harm to the life and health of citizens, harm to animals, plants and the environment.


# 161800517772
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 22062018 4328 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 25052018 1219047202 to 25062018 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with the instructions of state control bodies, supervision bodies of municipal control


# 161800446391
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-07-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800379194
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-06-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800394215
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used. construction of compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of the capital construction facility dated 11052018 3220 The objectives of this inspection are to prevent, identify and suppress violations of compliance committed by the developer customer the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation 7 The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 591800344287
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-25, duration:
Authority: Upravlenie po ekologii i prirodopolzovaniyu administracii goroda Permi
Purpose of inspection: To establish that this inspection is being conducted in order to verify the facts set out in reasoned submission 2 dated 24042018 on the illegal storage by public Joint Stock Company KamGesEnergoStroy of soil on the territory of 31 allotment 91 quarters of Levshinsky district forestry obtained as a result of construction work on the territory of the industrial site Novye Lyady of public Joint Stock Company ProtonPM, as well as verification of violations of legislation by public KamGesEnergoStroy Joint Stock Company stated in a letter dated 18042018 3050 from the Federal Security Service of Russia for the Perm Territory The purpose of this audit is to identify and prevent the facts of harmful effects on urban forests during economic and other activities. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts, measures to prevent harm to the life and health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens, harm to the health of citizens animals plants and the environment


# 161800279414
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800279404
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 161800321988
Unscheduled inspection
Start date: 2018-04-25, end date: 2018-04-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 26032018 case 121120160086, the objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility by the developer, customer, or person carrying out reconstruction on the basis of a contract with the developer or customer. 7 The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800198911
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-04-16, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 231700186470
Unscheduled inspection
Start date: 2017-12-25, end date: 2018-01-29, duration:
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment by PJSC Kamgesenergostroy of the previously issued instruction dated October 31, 2017 14440CY408LD on the elimination of identified violations during the construction of a capital construction facility. The objectives of this audit are to prevent, identify, and suppress violations of legislation on urban development by PJSC Kamgesenergostroy, including technical regulations and project documentation. The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts compliance with the instructions of state control bodies supervision bodies of municipal control


# 00170802875193
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-22, duration:
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulation dated 29092017 430920173482 the appeal of PJSC Kamgesenergostroy to the Volga Administration of Rostechnadzor notification of the elimination of violations of vx 51438C dated 02112017


# 16170802972225
Unscheduled inspection
Start date: 2017-12-11, end date: 2018-01-15, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 23170802826383
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration:
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection:


# 16170802720287
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection:


# 16170802650842
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority:
Purpose of inspection:


# 16170801947847
Unscheduled inspection
Start date: 2017-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 16170801948125
Unscheduled inspection
Start date: 2017-09-05, end date: 2017-09-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program from 25082017 case 1618201401281 warning, as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, and compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170801947821
Unscheduled inspection
Start date: 2017-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 16170802529620
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 19102016 case 121120160086the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802529564
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 05092016 case 121120160072the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170701818032
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 14072017 5590 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 04072017 1219077301 to 14072017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out reconstruction on the basis of a contract with the developer or the customer, carried out during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation7 The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts, compliance with the instructions of the authorities state control supervision of municipal control bodies


# 16170701752765
Unscheduled inspection
Start date: 2017-07-03, end date: 2017-07-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 20062017 4761 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 27042017 1219045701 to 30062017G Tasks The purpose of this audit is to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe purpose of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.


# 16170701759456
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 19102016 case 121120160086the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out the reconstruction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170701743725
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701713583
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701707746
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification from 08062017 4458 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 02062017 1219066801 to 30062017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this audit is to select the necessary compliance with the Inspection regulations


# 16170701689645
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed reconstruction of the facility in in accordance with the notice received by the Inspectorate dated 26052017 4056 on the completion of construction and reconstruction at the capital construction facility, the tasks of this inspection are to prevent, as well as identify and prevent violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation6 The subject of this The verification is to ensure compliance with mandatory requirements


# 16170701669680
Unscheduled inspection
Start date: 2017-06-02, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701698805
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 19052017 3860 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 27042017 1219045901 to 22052017G Tasks The purpose of this audit is to prevent, as well as to identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation6 committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The subject of this audit is to select the necessary compliance with the Inspection regulations


# 16170701698746
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: The objectives of this audit are to prevent, as well as to identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation6 performed during the construction of the capital construction facility. The subject of this audit is to select the necessary compliance with the Inspection regulations


# 16170701724037
Unscheduled inspection
Start date: 2017-06-21, end date: 2017-06-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 09062017 4510 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 02062017 1219061401 to 09062017G Tasks This audit is the prevention as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation6 performed during the construction of the capital construction facility. The subject of this audit is to select the necessary compliance with mandatory requirements and the fulfillment of Inspection instructions


# 16170701580233
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701575205
Unscheduled inspection
Start date: 2017-05-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170701652870
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701649377
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701537888
Unscheduled inspection
Start date: 2017-04-17, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170701558837
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701558767
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170701483273
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 21032017 2045 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 20072016 1619035201 to 30032017grevention as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentationcompliance with Inspection regulations performed during the construction of the capital construction facility


# 16170701483012
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 23012017 case 1611201500322 warning, as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility.


# 16170701558684
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: fulfillment of inspection prescriptions This inspection is carried out in order to determine the fact of fulfillment of the prescription from 15032017 1219026401, the deadline for which expired on 14042017, and to draw up an act based on the results of the inspection. The tasks of this inspection are to prevent, as well as to identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of the compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentationthe subject of this audit is to select the appropriate one


# 16170701558718
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 25102016 case 121120150051the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements


# 16170701434290
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 25102016 case 121120150052the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements


# 16170701420412
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701440591
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 03032017 1639 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 27022017 131900-5401 to 17032017


# 16170701434099
Unscheduled inspection
Start date: 2017-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 16170701296937
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170701296967
Unscheduled inspection
Start date: 2017-01-19, end date: 2017-01-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16170701287588
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-01-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 26122016 11917 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 20072016 1619035201 to 30122016G Tasks The purpose of this audit is to prevent as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this audit is to comply with the requirements of the Inspection


# 16170701329689
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 16160701286635
Unscheduled inspection
Start date: 2016-12-30, end date: 2016-12-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate dated 26/122016 11925 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 20122016 1219141501 to 20012017tasks The purpose of this audit is to prevent as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this audit is to comply with the requirements of the Inspection


# 16160701208090
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated January 27, 2016 case 121120150178the tasks of this inspection are to prevent, as well as identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is to select the necessary compliance with mandatory requirements


# 16160701209839
Unscheduled inspection
Start date: 2016-12-29, end date: 2016-12-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the instruction dated 29082016 1619044201, the deadline for which expired on 301/12/2016, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulations performed during the construction of a capital construction facility. regulatory legal acts and project documentation The subject of this audit is the fulfillment of Inspection regulations


# 16160701271351
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notice dated 16122016 5021SKK on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 05122016 1219131401 to 06022017 The objectives of this audit are to prevent, as well as to identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is the fulfillment of Inspection instructions


# 16160701201617
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 2112016 10324 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 09092016 1219085901 to 20112016 The objectives of this audit are to prevent as well as identify and suppress violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility. The subject of this audit is to select the necessary fulfillment of the Inspection instructions


# 16160701196114
Unscheduled inspection
Start date: 2016-12-02, end date: —, duration:
Authority:
Purpose of inspection:


# 16160701248121
Unscheduled inspection
Start date: 2016-12-20, end date: —, duration:
Authority:
Purpose of inspection:


# 16160701258972
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 19102016 case 121120160086the tasks of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this inspection is compliance with mandatory requirements


# 16160701221705
Unscheduled inspection
Start date: 2016-12-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16160701089851
Unscheduled inspection
Start date: 2016-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 16160701064567
Unscheduled inspection
Start date: 2016-11-09, end date: 2016-11-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 27102016 case 1611201500322, the prevention, as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation with mandatory requirements performed during the construction of the capital construction facility


# 16160701184465
Unscheduled inspection
Start date: 2016-11-29, end date: 2016-11-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of compliance of the completed works during the construction of a capital construction facility with the technical regulations of the project documentation


# 16160701062648
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate dated 12102016 9028 12102016 9028 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation dated 11092015 1219067001 10072015 1219046701 to 28092015the tasks of this audit are the prevention, detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, while eliminating previously identified violations. The subject of this audit is the fulfillment of Inspection instructions


# 16160701062812
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 12102016 9028 12102016 9028 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 15092015 1219067101 13072015 1219046801 to 25102015the tasks of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, while eliminating previously identified violations. The purpose of this audit is to comply with the requirements of the Inspection


# 16160701064820
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Determination of compliance of the performed works applied in the process of construction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation prevention as well as detection and suppression of violations committed by the developer customer by the person carrying out construction on the basis of an agreement with the developer or customer compliance with mandatory requirements or requirements established by municipal legal acts


# 16160701083163
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 25/122015 case 121120150167, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to comply with mandatory requirements


# 16160701064663
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. In accordance with the inspection program dated 25/122015 case 121120150167, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation6 committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer.


# 16160700978865
Unscheduled inspection
Start date: 2016-10-07, end date: 2016-10-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notice dated 30092016 8583 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 28072016 1619036501 to 28102016 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, compliance with Inspection regulations


# 16160701033496
Unscheduled inspection
Start date: 2016-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700157951
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of compliance with the order dated 19072016 1219059901, the deadline for which expired 06092016, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentation The subject of this audit is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 16160700184504
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-10-07, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 16160601784717
Unscheduled inspection
Start date: 2016-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700050191
Unscheduled inspection
Start date: 2016-08-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16160601783960
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, based on the notice received by the Inspection from 25072016 6066 on the completion dates that are subject to verification at the capital construction facility construction prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts


# 16160601783880
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 16160601783847
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 22072016 6026 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 25032016 1619009701 to 25072016 warning and identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, compliance with the instructions of state control bodies, supervision bodies, municipal control bodies


# 16160700100210
Unscheduled inspection
Start date: 2016-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700058104
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-26, duration:
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees


# 16160601791095
Unscheduled inspection
Start date: 2016-08-11, end date: 2016-08-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the work performed with the construction materials used in the construction and reconstruction of the capital construction facility and the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used, based on the notice received by the Inspectorate from 05082016 6615 on the completion dates of the work that is subject to verification at the capital construction facility construction prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, or compliance with mandatory requirements or requirements established by municipal legal acts performed during the construction of a capital construction facility


# 16160700044984
Unscheduled inspection
Start date: 2016-08-18, end date: 2016-08-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: verification of the execution of the order dated 05082016 1219670 under paragraphs 2128, the deadline for which expires 20082016 Notification of the elimination of violations dated 12082016 bx6847 prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, as well as by persons who directly performed the work subcontractor, including technical regulations and project documentation. Inspection regulations


# 16160601750783
Unscheduled inspection
Start date: 2016-07-26, end date: 2016-07-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program inspections dated 03062016 case 1611201500322 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the compliance of works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


# 16160601776344
Unscheduled inspection
Start date: 2016-07-28, end date: 2016-07-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, based on the notice received by the Inspectorate from 20072016 5938 on the completion dates that are subject to verification at the capital construction facility, prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, and compliance with mandatory requirements or requirements established by municipal legal acts


# 16160601725504
Unscheduled inspection
Start date: 2016-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 16160601747665
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used during the construction and reconstruction of the capital construction facility comply with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 03062016 case 1611201500322 warning, as well as the detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, and compliance with mandatory requirements or requirements established by municipal legal acts


# 00150601309277
Unscheduled inspection
Start date: 2015-11-11, end date: 2015-11-20, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Respublike Tatarstan
Purpose of inspection: prescription control


# 16150600770609
Unscheduled inspection
Start date: 2015-09-04, end date: —, duration:
Authority:
Purpose of inspection: