# 77190803472453
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803461213
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803439041
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803421873
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803386886
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-05-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803401994
Unscheduled inspection
Start date: 2019-04-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803389778
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803374703
Unscheduled inspection
Start date: 2019-03-19, end date: 2019-03-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803321607
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803324421
Unscheduled inspection
Start date: 2019-01-31, end date: 2019-02-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803315118
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-01-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803312800
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803293991
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803302307
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803267924
Unscheduled inspection
Start date: 2018-11-02, end date: 2018-11-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803273813
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803260298
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803243973
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803251731
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803248935
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803236914
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803235198
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803191235
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 501800710411
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 19062018 0346079100506 izveschenie ob ustranenii ot 04072018 P001702289389614212304 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva proverka ispolneniya predpisaniya ot 19062018 0346079100506
# 77180803174226
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803185227
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501800555786
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya 0346077400508 ot 16042018 izveschenie ob ustranenii narushenii P001821640025413303637 ot 27052018 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva ZHiloi kompleks K1 pervyi etap stroitelstva po adresu Moskovskaya oblast g Himki mkr Levoberezhnyi Sovhoznaya ul korpus 11 korpus 12 proverka ispolneniya predpisaniya 0346077400508 ot 16042018
# 77180803138946
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803139076
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803126799
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803087669
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803100316
Unscheduled inspection
Start date: 2018-03-13, end date: 2018-03-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803110997
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 501800333752
Unscheduled inspection
Start date: 2018-03-05, end date: 2018-03-14, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya 0346077400507 ot 25012018 srokom do 12022018 izveschenie ob ustranenii narushenii P001765722309710873893 ot 08022018 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva proverka ispolneniya predpisaniya 0346077400507 ot 25012018 srokom do 12022018
# 501800334664
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-03-30, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya 0346079100503 ot 22022018 izveschenie ob ustranenii narushenii P001058542208711686715 ot 17032018 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva soblyudenie obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom
# 77180803076373
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803056600
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 501800168655
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-25, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya porucheniya nachalnika Upravleniya nadzora za stroitelstvom Glavgosstroinadzora Moskovskoi oblasti AN Strebeleva sluzhebnaya zapiska io nachalnika Otdela nadzora za stroitelstvom 3 FD Psurceva ot 19012018 proverka nalichiya razreshitelnoi i proektnoi dokumentacii na obekte kapitalnogo stroitelstva soblyudenie obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom
# 77170803061973
Unscheduled inspection
Start date: 2017-12-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170802954078
Unscheduled inspection
Start date: 2017-12-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802873296
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170801954850
Unscheduled inspection
Start date: 2017-09-15, end date: 2017-10-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 50170801951948
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-15, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolnenie predpisaniya 0346076600506 ot 28072017 so srokom vypolneniya do 21082017 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii
# 77170701882135
Unscheduled inspection
Start date: 2017-08-09, end date: 2017-08-11, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 50170801930087
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-02, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: ispolneniya predpisaniya ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva soblyudenie obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom
# 50170801929958
Unscheduled inspection
Start date: 2017-07-06, end date: 2017-07-28, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ispolneniya predpisaniya ot 30052017 0346076600504 so srokom ispolneniya do 27062017 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva
# 50170701701677
Unscheduled inspection
Start date: 2017-06-14, end date: 2017-06-20, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ustraneniya narushenii v ramkah izvescheniya ob ustranenii narushenii P00121746919116721441 06062017 i predpisaniya ot 27042017 0346079100501 so srokom vypolneniya do 06062017 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva proverka ispolneniya predpisaniya ot 27042017 0346079100501 so srokom vypolneniya do 06062017
# 77170701738217
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170701666700
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-02, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ustraneniya narushenii v ramkah izvescheniya ob ustranenii narushenii P00121746919116459111 ot 22052017 i predpisaniya ot 24042017 0346077400501 so srokom vypolneniya do 26052017 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva proverka ispolneniya predpisaniya ot 24042017 0346077400501 so srokom vypolneniya do 26052017
# 77170701662093
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701493651
Unscheduled inspection
Start date: 2017-04-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 50170701577071
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-04-26, duration: —
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: proverka ustraneniya narushenii izveschenie ob ustranenii narushenii ot 14042017 P00166669375635906819 v ramkah predpisaniya ot 28032017 0346076600503 so srokom vypolneniya do 28042017 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva proverka predpisaniya ot 28032017 0346076600503 so srokom vypolneniya do 28042017
# 77170701375930
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used