Found 160 inspections:

# 002105294746
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-29, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Implementation of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor. - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Compliance of the work performed and the construction materials used with the results during the construction of the capital construction facility "Construction of industrial site facilities for the Eastern flank inclined shafts of the Kostromovskaya mine" by MMK-UGOL LLC. 1 period", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002005247699
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005247838
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005196426
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 002004480101
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-28, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Construction of the industrial site of the Western flank Bremsberg 501 Chertinskaya Coke Mine, MMKUGOL Stage 2 LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004480098
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004424359
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004424342
Unscheduled inspection
Start date: 2020-06-08, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004424377
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004315498
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 22/12/2019 2501325, the deadline for which has expired Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations dated 22/12/2019 2501325, the deadline for which has expired Compliance with the instructions of the federal state construction supervision authorities


# 002004212553
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky on the basis of the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 420916 dated 06052019 Tasks of this The purpose of the audit is to prevent identify and suppress violations of the legislation on urban development and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to ensure that the work performed and the construction materials used and the results during the construction of a capital construction facility, as well as the results of such work, comply with project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903922548
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001903985182
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902716005
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the implementation of paragraphs 14 21 35 subitem 13 of the regulation dated 19102018 N 0109061249 and paragraphs 1 2 of the regulation dated 27122018 N 0127061722, the deadlines for which expire. The objectives of this audit are to establish the facts of the fulfillment of non-fulfillment of the prescription, to assess the completeness and quality of the measures carried out7 The subject of this audit is to verify the implementation of paragraphs 14 21 35 subitem 13 regulations from 19102018 N 0109061249 and paragraphs 1 to 2 of the regulations from 27122018 N 0127061722, the deadlines for which have expired


# 001902665299
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued regulation 1407PpkTSE145 dated 06112018, the deadline for eliminating the identified violations, which expired on 06/122018. The purpose of this audit is to assess the completeness and quality of measures to eliminate violations of mandatory requirements. The subject of this audit is to comply with the instructions of the state control and supervision authority


# 001902540128
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the inspection program approved by the Deputy head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Development of reserves of the Chertinskaya brachycline within the boundaries of mining allotment of Chertinskyakoksovaya Mine LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902471413
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-01-30, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the implementation of paragraph 25 of the regulation dated October 19, 2018 N 0109061249, the deadline for which has expired. The objectives of this audit are to establish the facts of non-compliance with the regulation, assess the completeness and quality of the measures taken. 7 The subject of this audit is to verify the implementation of paragraph 25 of the regulation dated October 19, 2018 N 0109061249, the deadline for which has expired


# 001800686694
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by MMKUGOL LLC of the requirements of the previously issued regulation on the elimination of violations dated April 27, 2018 2502090, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated April 27, 2018 2502090, the deadline for which has expired. The subject of this audit is the fulfillment of by the person being checked regulations dated April 27, 2018 2502090 of the Siberian Administration of Rostechnadzor


# 001800686511
Unscheduled inspection
Start date: 2018-08-30, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802935318
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to monitor the compliance of MMKUGOL LLC with the requirements of the previously issued regulation on the elimination of violations dated June 02, 2017 2502142, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated June 02, 2017 2502142, the deadline for which has expired. The purpose of this audit is Compliance by the person being checked with the instruction dated June 02, 2017 2502142 of the Siberian Rostechnadzor Department


# 00170802912490
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-01, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: KIP 1409PTSE093 from 18092017


# 00170802059503
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over an object of capital construction on the basis of a notice from MMKUGOL LLC on the completion of construction of an object of capital construction Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the construction of an object of capital construction, as well as the results of the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701770788
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to monitor the fulfillment by MMKUGOL LLC of the requirements of the previously issued instruction on the elimination of violations dated March 24, 2017 2502019, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the instruction on the elimination of violations dated March 24, 2017 2502019, the deadline for which has expired. The purpose of this audit is Compliance by the person being checked with the instruction dated March 24, 2017 2502019 of the Siberian Rostechnadzor Department


# 422201509305
Unscheduled inspection
Start date: 2022-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 422101461009
Unscheduled inspection
Start date: 2021-12-21, end date: 2021-12-22, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the construction materials and products used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the GRK RF, are part of such design documentation), the objective of this audit is compliance with the requirements of the legislation of the Russian Federation in the field of urban development during the construction of a capital construction facility, compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 422101447879
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 422101411649
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-17, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: in order to verify the compliance of the work performed and the construction materials and products used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation (including changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the GRK RF, are part of such project documentation), in accordance with1 of the inspection program No. 1, based on notification No. 1 dated 11/16/2021 from the developer MMK–UGOL LLC (ex. No. 4876/21 dated 11/17/2021), the task of this inspection is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility, compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities


# 422101469978
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 422101467684
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 422101266206
Unscheduled inspection
Start date: 2021-11-24, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: compliance of the work performed and the construction materials and products used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Civil Code of the Russian Federation, are part of such design documentation); Task: compliance with legal requirements of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422100541271
Unscheduled inspection
Start date: 2021-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 422100474883
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: to verify the execution of paragraph 1 of Regulation No. 05-07-21-01 dated 06/03/2021, by 08/15/2021; Task: to verify the elimination of violations; subject: execution of paragraph 1 of Regulation No. 05-07-21-01 dated 06/03/2021, by 08/15/2021


# 422100351653
Unscheduled inspection
Start date: 2021-07-16, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, verification of compliance with the requirements of parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of a notification received from the developer about the start of construction of the facility; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during construction


# 422100318104
Unscheduled inspection
Start date: 2021-07-16, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: verification of compliance of the work performed and the construction materials used in the course of work; Task: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction; subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban planning during construction


# 422100294660
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 20
Authority: YUzhno-Sibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: The audit is conducted in order to: verify the fulfillment by MMK-Ugol LLC of the instruction on the elimination of identified violations of mandatory requirements dated 09/23/2020 No. NWAT-858 paragraphs 5, 7, 8, 11, the deadline for which has expired. The purpose of this audit is to monitor compliance with mandatory requirements in the field of environmental protection, in the field of waste management of production and consumption, use and protection of land, use and protection of water bodies of MMK-Ugol LLC, including standards (norms, rules) and technical requirements approved in accordance with the established procedure. environmental protection and environmental management in the implementation of production activities and the use of natural resources. The subject of this audit is: the fulfillment of the instruction of the state control (supervision) body dated 09/23/2020 № NWAT-858 paragraphs 5, 7, 8, 11.


# 422100323260
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblasti-Kuzbassu
Purpose of inspection: this inspection is carried out for the purpose of: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101-FZ dated July 24, 2002 "On the turnover of agricultural land" in the framework of the previously issued regulation on the elimination of violations of land legislation No. 449/985-ZN dated 10/15/2019, the deadline for execution regulations until 06/15/2021. the objectives of this audit are: to assess the compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation, the requirements for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101-FZ dated 07/24/2002 "On the turnover of agricultural land" The subject of this audit is compliance with the regulations of state control (supervision) bodies and municipal control bodies;


# 422100311591
Unscheduled inspection
Start date: 2021-06-23, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 422100250806
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 542100192876
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 20
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: This check is carried out in order to assess the fulfillment of the previously issued Order No. M-62 dated April 02, 2021 in accordance with the deadline for its execution on April 30, 2021.


# 422100231693
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 422100151443
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-05-07, duration: 20
Authority: YUzhno-Sibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This inspection is carried out for the purpose of: verifying the fulfillment by MMK-Ugol LLC of the instruction on the elimination of identified violations of mandatory requirements dated 09/23/2020 № NWAT-858 pp. 1, 2, 3, 4, 6, 9, 10, 12, 13, 14, the deadline for which has expired. The purpose of this audit is to monitor compliance with mandatory requirements in the field of environmental protection, atmospheric air protection, waste management, production and consumption, land use and protection, geological exploration, rational use and protection of the subsoil of MMK-Ugol LLC, including standards approved in accordance with the established procedure (norms, regulations) and technical requirements in the field of environmental protection and environmental management in the implementation of production activities and the use of natural resources. The subject of this audit is: the fulfillment of the instruction of the state control (supervision) body dated 09/23/2020 № NWAT-858 pp. 1,2, 3, 4, 6, 9, 10, 12,13, 14.


# 422100094249
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Implementation of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Compliance of the work performed and the construction materials used with the results during the construction of the capital construction facility "Construction of industrial site facilities for the Eastern flank inclined shafts of the Kostromovskaya mine" by MMK-UGOL LLC. 1 period", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422100107588
Unscheduled inspection
Start date: 2021-03-31, end date: —, duration: 20
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblasti-Kuzbassu
Purpose of inspection: This inspection is carried out for the purpose of: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101-FZ dated 07/24/2002 "On the turnover of agricultural land" in the framework of the previously issued regulation on the elimination of violations of land legislation No. 38/85-v-ZN dated 03/20/2020, the deadline for the execution of the order is 03/19/2021. the objectives of this audit are: to assess the compliance of the business entity's activities with the mandatory requirements of the land legislation of the Russian Federation, the requirements for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101-FZ dated 07/24/2002 "On the turnover of Agricultural Land" The subject of this audit is (please note): compliance with the regulations of state control (supervision) bodies, municipal control bodies;


# 422100091398
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Control of the execution of the order of the Siberian Rostechnadzor Department, the deadline for which has expired. - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Compliance with the instructions of the federal state construction supervision authorities.


# 422100023783
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-05, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose: to verify the conformity of the work performed and the construction materials used in the process of work in the pumping and filtration station - installation of APS RS; in the clarified water pumping station - Prm1 device, insulation of the buried part. Foundations FM1,FM2, FLm1, PM1; in a transformer substation - installation of KTPN2 with grounding, according to the requirements of the design documentation, verification of compliance with the requirements of parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation. Tasks, subject: compliance with the requirements of the legislation of the Russian Federation in the field of urban development


# 422100037267
Unscheduled inspection
Start date: 2021-03-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 422100100479
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-17, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of Regulation No. 2/3/1-4 dated 08/24/2020


# 422100100486
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-17, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of Regulation No. 1/4/1-5 dated 08/24/2020


# 422100082600
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-17, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of Regulation No. 1/4/1-5 dated 08/24/2020


# 422100082570
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-17, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control of execution by a legal entity No. 2/3/1-4 dated 08/24/2020


# 422100026932
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-26, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms. Ensuring the observance and protection of citizens' labor rights and freedoms, including the right to safe working conditions. compliance with mandatory requirements and/or requirements established by municipal legal acts


# 002105294746
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-01-29, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: - Implementation of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor. - Prevention, detection and suppression of violations of the legislation on urban planning activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (contractor). - Compliance of the work performed and the construction materials used with the results during the construction of the capital construction facility "Construction of industrial site facilities for the Eastern flank inclined shafts of the Kostromovskaya mine" by MMK-UGOL LLC. 1 period", as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply), including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a building permit; compliance with the requirements of parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 422005253852
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-20, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of regulation 129165 dated 09/12/2019


# 002005247699
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Compliance of the work and applied building materials and results during the construction of the capital construction facility "Construction of the industrial site of the Western flanking Bremsberg 501 Chertinskaya Coke mine, MMKUGOL 1st Stage LLC, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information models if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002005247838
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-12-11, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, the contractor, including project documentation Compliance with the work performed and the construction materials used and the results during the construction of the capital construction facility "Construction of the industrial site of the Western flanking Bremsberg 501 Chertinskaya Coke mine, MMKUGOL Stage 2 LLC, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 of 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information models in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002005196426
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-24, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor law Ensuring compliance and protection of labor rights and freedoms of citizens including the right to safe working conditions compliance with mandatory requirements and or requirements established by municipal legal acts


# 002005199690
Unscheduled inspection
Start date: 2020-10-22, end date: 2020-10-26, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to prevent injuries and accidents at enterprises with an underground coal mining method, as well as on the basis of a reasoned submission from the head of the Mining Supervision Department for underground mining and subsurface use Shaimov VL about the need for an unscheduled field inspection in relation to MMK COAL LLC Chertinskaya Koksovaya mine. The purpose of this inspection is to carry out federal state supervision in the field of industrial safety aimed at preventing the occurrence of such situations in the mine workings in order to preserve the life and health of employees of the enterprise, the subject of this audit is compliance with mandatory requirements in the field of industrial safety and measures to eliminate the causes of harm to the life and health of employees.


# 422004480080
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-19, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: the purpose is to verify the compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used the task is to comply with the requirements of the legislation of the Russian Federation in the field of urban planning during construction the subject is to comply with the mandatory requirements of the legislation of the Russian Federation in areas of urban planning activity


# 422004478806
Unscheduled inspection
Start date: 2020-08-07, end date: 2020-08-07, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 002004480101
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-28, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Construction of the industrial site of the Western flank Bremsberg 501 Chertinskaya Coke Mine, MMKUGOL Stage 2 LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004480098
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-28, duration: 15
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Construction of the industrial site of the Western flank Bremsberg 501 Chertinskyakoksovaya mine, MMKUGOL 1st Stage LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422004444459
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-07-03, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the conformity of the work performed and the construction materials used in the course of the work. The task is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction. The subject is to comply with the requirements of the legislation of the Russian Federation in the field of urban development during construction.


# 422004448652
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-07-06, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Kemerovskoi oblasti
Purpose of inspection: control over the execution by a legal entity of regulation 129165 dated 09/12/2019


# 002004424359
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-06-22, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" located at the address Kemerovo region Leninskkunetsky municipal district of Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky based on the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 420916 dated 06052019. Prevention detection and suppression of violations committed by the developer by the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, violations of the legislation on urban planning activities, project documentation, Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with energy metering devices resources availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004424342
Unscheduled inspection
Start date: 2020-06-08, end date: 2020-06-22, duration: 10
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over the capital construction facility "Reconstruction of the Kostromovskaya mine Stage I" located at the address Kemerovo region Leninskkunetsky municipal district of Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky based on the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 4201515 dated 06052019. Prevention detection and suppression of violations committed by the developer by the customer as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, violations of the legislation on urban planning activities, project documentation, Compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with energy metering devices resources availability of a building permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004424377
Unscheduled inspection
Start date: 2020-06-01, end date: 2020-06-11, duration: 9
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, 2500-420 dated 120-52020. Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Construction of the industrial site of the western flank Bremsberg 501 Chertinskaya Coke mine, MMKUGOL LLC, Stage 2, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422004439732
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection:


# 002004427669
Unscheduled inspection
Start date: 2020-05-13, end date: 2020-05-28, duration: 12
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of the Inspection Program approved by AA Pleshivtsev, Deputy Head of the Siberian Department of Rostechnadzor, 2500120 dated 1903-2020. Prevention detection and suppression of violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of the work and the applied building materials and results during the construction of the capital construction facility "Construction of the Yuzhnaya Glubokaya mine, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, availability of a construction permit, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 422004393463
Unscheduled inspection
Start date: 2020-04-08, end date: 2020-05-12, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: compliance with mandatory requirements


# 002004315498
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 22/12/2019 2501325, the deadline for which has expired Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations dated 22/12/2019 2501325, the deadline for which has expired Compliance with the instructions of the federal state construction supervision authorities


# 422004305113
Unscheduled inspection
Start date: 2020-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 422004247911
Unscheduled inspection
Start date: 2020-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 002004263864
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor 2502289 dated 18102019 on the elimination of identified offenses, the deadline for which expires. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or customer contractor. The purpose of this inspection is to comply with the regulations federal state construction supervision bodies


# 002004212529
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine stage I" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky on the basis of the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 4201515 dated 06052019 Tasks of this The purpose of the audit is to prevent identify and suppress violations of the law on urban development and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to ensure that the work performed and the construction materials used and the results during the construction of a capital construction facility, as well as the results of such work, comply with project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004212553
Unscheduled inspection
Start date: 2020-01-27, end date: 2020-02-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky on the basis of the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 420916 dated 06052019 Tasks of this The purpose of the audit is to prevent identify and suppress violations of the legislation on urban development and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to ensure that the work performed and the construction materials used and the results during the construction of a capital construction facility, as well as the results of such work, comply with project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421904154367
Unscheduled inspection
Start date: 2019-12-24, end date: 2020-01-27, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Appeal 427558819 of 12122019 The objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 421904053167
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421904053184
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421903962994
Unscheduled inspection
Start date: 2019-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 001903922548
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor Vygolov LP dated 11022019 4200519 Prevention detection and suppression of violations of legislation on urban development activities by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of a capital construction facility "Development of reserves of the Chertinskaya brachycline within the boundaries of the mining allotment of Chertinskaya Coke Mine LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903985182
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the execution of violations specified in the instruction of the Siberian Directorate of Rostechnadzor dated 21062019 2501146, the deadline for which has expired Verification of the elimination by a legal entity of violations specified in the instruction on the elimination of violations dated 21062019 2501146, the deadline for which has expired Compliance with the instructions of the federal state construction supervision authorities


# 421903976048
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 001903080742
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky on the basis of the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 420916 dated 06052019 Tasks of this The purpose of the audit is to prevent identify and suppress violations of the legislation on urban development and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor). The subject of this audit is the compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility, as well as the results of such work, with the project documentation, including the requirements energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903080711
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-18, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine stage I" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky on the basis of the inspection program approved by Deputy Head of the Siberian Directorate of Rostechnadzor MV Serbinovich 4201515 dated 06052019 Tasks of this The purpose of the audit is to prevent identify and suppress violations of the legislation on urban development activities and project documentation committed by the developer, the customer, and the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor. The purpose of this audit is to ensure that the work performed and the construction materials used and the results during the construction of a capital construction facility, as well as the results of such work, comply with project documentation, including energy requirements efficiency and requirements for equipping the capital construction facility with metering devices for used energy resources availability of a construction permit compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421903911454
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 421903713470
Unscheduled inspection
Start date: 2019-10-03, end date: 2019-10-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903622387
Unscheduled inspection
Start date: 2019-09-19, end date: —, duration:
Authority:
Purpose of inspection:


# 421903042645
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-30, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: This audit is conducted in order to monitor compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of Agricultural Land" as part of the execution of the previously issued order to eliminate violations of land legislation No. 1006bZN dated 22112018 the deadline for the execution of the order is 20082019the objectives of this audit are to assess compliance with the activities of an economic entity. the subject of the mandatory requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land", The subject of this audit is compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421902991088
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421903186363
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 421902959237
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 421902889864
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose verification of compliance of completed works and applied building materials during the construction of the facility as well as the results of such work with the requirements of technical regulations other regulations and design documentation Tasks determination of compliance of the constructed capital construction facility with the requirements of design documentation and technical regulations Subject to compliance with mandatory requirements of the legislation of the Russian Federation on urban development


# 421902876765
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902864946
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: The implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with mandatory requirements of labor legislation and other regulatory legal acts containing norms of labor law the objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions The subject of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 421902892979
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-08-15, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Appeal 427269819 of 20062019 The objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizens, including the right to safe working conditions. The purpose of this audit is to note the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 421902767960
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: This inspection is carried out for the purpose of supervision over compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 224072002 101FZ "On the turnover of agricultural land" as part of the execution of the previously issued regulation on the elimination of violations of land legislation 124214vZN dated 25052017 the deadline for the execution of the regulation is 01062019the objectives of this audit are to assess the compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation requirements for the protection and use of agricultural lands, the turnover of which is regulated by the Federal Law of 24072002 101 FZ "On the turnover of agricultural land", The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts


# 421902795591
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-06-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001902745885
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-21, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Development of reserves of the Chertinskaya brachycline within the boundaries of mining allotment of Chertinskyakoksovaya Mine LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902716005
Unscheduled inspection
Start date: 2019-05-14, end date: 2019-05-16, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the implementation of paragraphs 14 21 35 subitem 13 of the regulation dated 19102018 N 0109061249 and paragraphs 1 2 of the regulation dated 27122018 N 0127061722, the deadlines for which expire. The objectives of this audit are to establish the facts of the fulfillment of non-fulfillment of the prescription, to assess the completeness and quality of the measures carried out7 The subject of this audit is to verify the implementation of paragraphs 14 21 35 subitem 13 regulations from 19102018 N 0109061249 and paragraphs 1 to 2 of the regulations from 27122018 N 0127061722, the deadlines for which have expired


# 421902717260
Unscheduled inspection
Start date: 2019-05-17, end date: —, duration:
Authority:
Purpose of inspection:


# 421902760828
Unscheduled inspection
Start date: 2019-05-07, end date: 2019-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 421902734722
Unscheduled inspection
Start date: 2019-05-07, end date: 2019-05-08, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Ensuring the observance and protection of the labor rights and freedoms of citizens, including the right to safe working conditions


# 421902750047
Unscheduled inspection
Start date: 2019-05-28, end date: 2019-06-21, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This inspection is carried out in order to monitor the elimination of MMKUGOL LLC violations, the fulfillment of which is mandatory in accordance with the order previously issued to the person being checked on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements from 15032019 GN069B, the deadline for which has expired.


# 001902633203
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-24, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the inspection is to monitor the implementation of paragraphs 17 916 18 19 2123 of Regulation 15022518 of 19102018, the deadline for which has expired. The purpose of the inspection is to assess the completeness and quality of measures to eliminate violations of mandatory requirements


# 001902665299
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-29, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued regulation 1407PpkTSE145 dated 06112018, the deadline for eliminating the identified violations, which expired on 06/122018. The purpose of this audit is to assess the completeness and quality of measures to eliminate violations of mandatory requirements. The subject of this audit is to comply with the instructions of the state control and supervision authority


# 001902540128
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Execution of the inspection program approved by the Deputy head of the Siberian Department of Rostechnadzor Prevention detection and suppression of violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, project documentation Compliance of work and applied building materials and results during the construction of the capital construction facility "Development of reserves of the Chertinskaya brachycline within the boundaries of mining allotment of Chertinskyakoksovaya Mine LLC, as well as the results of such work, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, construction permits, compliance with the requirements of Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 421902572886
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421902563424
Unscheduled inspection
Start date: 2019-02-20, end date: —, duration:
Authority:
Purpose of inspection:


# 421902451818
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection:


# 421902445119
Unscheduled inspection
Start date: 2019-01-25, end date: 2019-02-21, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: To establish that this audit is conducted for the purpose of overseeing compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land" as part of the execution of the previously issued order to eliminate violations of land legislation 88184ZN dated 19042018 the deadline for the execution of the order is 16012019 the objectives of this audit are assessment of the compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land", The subject of this audit is to note the necessary compliance with the instructions of state control bodies, supervision bodies of municipal control


# 001902457626
Unscheduled inspection
Start date: 2019-01-23, end date: 2019-02-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the order of the Siberian Directorate of Rostechnadzor 2502202 dated 21092018 on the elimination of identified offenses, the deadline for which has expired. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the customer, as well as the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation. The subject of this inspection is compliance with the regulations of the federal State construction supervision authorities


# 001902471413
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-01-30, duration: 3
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the implementation of paragraph 25 of the regulation dated October 19, 2018 N 0109061249, the deadline for which has expired. The objectives of this audit are to establish the facts of non-compliance with the regulation, assess the completeness and quality of the measures taken. 7 The subject of this audit is to verify the implementation of paragraph 25 of the regulation dated October 19, 2018 N 0109061249, the deadline for which has expired


# 001802323704
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is conducted in order to verify the implementation of paragraphs 113 1520 2224 2652 of the Regulation dated October 19, 2018 N 0109061249, the deadlines for which have expired. The objectives of this audit are to establish the facts of non-compliance with the regulation and to assess the completeness and quality of the measures taken. 7 The subject of this audit is to verify the implementation of paragraphs 113 1520 2224 2652 of the regulation dated October 19, 2018 N 0109061249 deadlines for which have expired


# 421802051044
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-11-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802022994
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection:


# 421801186006
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-09-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 001800686694
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by MMKUGOL LLC of the requirements of the previously issued regulation on the elimination of violations dated April 27, 2018 2502090, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated April 27, 2018 2502090, the deadline for which has expired. The subject of this audit is the fulfillment of by the person being checked regulations dated April 27, 2018 2502090 of the Siberian Administration of Rostechnadzor


# 001800686691
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-21, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine stage II" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas "Kostromovsky" and "Nikitinsky" on the basis of the inspection program approved by the Deputy head of the Siberian Directorate of Rostechnadzor from 15022017 to 420916 Objectives of this inspection The purpose of this audit is to prevent, identify and prevent violations of urban planning legislation by the developer and the technical customer, including the requirements of the technical regulations of the project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" as well as the results of such work with the requirements of the technical regulations of the project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800686511
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-14, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by MMKUGOL LLC of the requirements of the previously issued regulation on the elimination of violations dated April 27, 2018 2502089, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated April 27, 2018 2502089, the deadline for which has expired. The subject of this audit is the fulfillment of by the person being checked regulations dated April 27, 2018 2502089 of the Siberian Directorate of Rostechnadzor


# 001800686334
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-21, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to carry out state construction supervision of the capital construction facility "Reconstruction of the Kostromovskaya mine stage I" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas "Kostromovsky" and "Nikitinsky" on the basis of the inspection program approved by the Deputy head of the Siberian Directorate of Rostechnadzor from 15022017 to 420916 Objectives of this inspection The purpose of this audit is to prevent, identify and prevent violations of urban planning legislation by the developer and the technical customer, including the requirements of the technical regulations of the project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage I" as well as the results of such work with the requirements of the technical regulations of the project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421800633270
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-21, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: To establish that this audit is conducted for the purpose of overseeing compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land" as part of the execution of the previously issued order to eliminate violations of land legislation No. 90183ZN dated 28042017 the deadline for the execution of the order is 24082018 The objectives of this audit are assessment of the compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the Turnover of Agricultural Land", The subject of this audit is to note the necessary compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421800615666
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 421800623504
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-08-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800561498
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-08-22, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: Objectives Supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land" based on a reasoned submission dated 16072018 Addressed by Mr. Malikov AC vh 29824908 dated 09072018 Tasks assessment of compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation requirements for protection and use agricultural lands, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of Agricultural Lands", The subject of the KNM is compliance with mandatory requirements or requirements established by municipal legal acts prevention of harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, museum objects and museum collections included in the Museum Fund Of the Russian Federation, especially valuable, including unique documents from the Archival Fund of the Russian Federation, documents of special historical, scientific and cultural significance that are part of the national library fund for the elimination of the consequences of such harm


# 421800548756
Unscheduled inspection
Start date: 2018-07-27, end date: 2018-07-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800521702
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Control over the elimination of MMKUGOL LLC violations, the fulfillment of which is mandatory in accordance with the order previously issued to the person being checked on the elimination of violations of legislation in the field of environmental protection and violations of environmental requirements dated 27062017 VT331v2, the deadline for which has expired


# 421800460668
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-12, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Kemerovskoi oblasti
Purpose of inspection: prevention detection and suppression of violations of the requirements of land legislation identification of signs of violations of the requirements of the legislation of the Russian Federation for which the legislation of the Russian Federation provides for administrative and other liability based on the results of an administrative survey of an object of land relations


# 421800404902
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800253213
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-05-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421802054666
Unscheduled inspection
Start date: 2018-04-10, end date: 2018-04-30, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Appeal 427128018 ON Violation of labor rights Ensuring compliance with and protection of labor rights and freedoms of citizens including the right to safe working conditions compliance with mandatory requirements and or requirements established by municipal legal acts


# 421800232937
Unscheduled inspection
Start date: 2018-04-12, end date: 2018-04-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Objectives verification of compliance of the work performed and the construction materials used in the course of work tasks compliance with the requirements of the legislation of the Russian Federation in the field of urban planning activities during the construction of a capital construction facility subject to compliance with the mandatory requirements of the legislation of the Russian Federation in the field of urban planning


# 421800271934
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural lands, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural Lands" as part of the execution of the previously issued order to eliminate violations of land legislation 139380ZN dated 03072017 the deadline for the execution of the order is 15042018 the objectives of this audit is to assess the compliance of the activities of an economic entity with mandatory requirements the requirements of the land legislation of the Russian Federation for the protection and use of agricultural lands, the turnover of which is regulated by the Federal Law of 24072002 101 FZ "On the turnover of agricultural lands"


# 421800271803
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection of the use of agricultural lands, the turnover of which is regulated by Federal Law No. 24072002 101FZ "On the turnover of agricultural lands" in the framework of the "execution of the previously issued regulation on the elimination of violations of land legislation 613ZN from 30012018 the deadline for the execution of the regulation until 16042018 the objectives of this audit is to assess the compliance of the activities of an economic entity with mandatory requirements the requirements of the land legislation of the Russian Federation for the protection and use of agricultural lands, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural lands" compliance with mandatory requirements or requirements established by municipal legal acts compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421800271916
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection of the use of agricultural lands, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of Agricultural Lands" as part of the execution of the previously issued instruction on the elimination of violations of land legislation 33bZN dated 12072016 the deadline for the execution of the instruction is 01042018. The objectives of this audit are to assess the compliance of the activities of an economic entity with the mandatory requirements of the land code. the requirements of the legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land" compliance with mandatory requirements or requirements established by municipal legal acts compliance with the instructions of state control bodies, supervision bodies of municipal control, holding events


# 001800249170
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage II" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas Kostromovsky and Nikitinsky based on the inspection program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 15022017 4201515, the objectives of this inspection are to prevent identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation. The subject of this inspection is the compliance of the work and the applied building materials and results during the construction of a capital construction facility "Reconstruction of the Kostromovskaya mine Stage II, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800249075
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Reconstruction of the Kostromovskaya mine Stage I" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas "Kostromovsky" and "Nikitinsky" on based on the inspection program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 15022017 4201916, the objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer and technical customer, including the requirements of technical regulations for project documentation. The subject of this inspection is the compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Reconstruction Kostromovskaya mine, Stage I, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 421800177540
Unscheduled inspection
Start date: 2018-03-05, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection:


# 421800071025
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-03-19, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural lands, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural Lands" as part of the execution of the previously issued order to eliminate violations of land legislation 33bZN dated 12072016 the deadline for the execution of the order is 12022018 the objectives of this audit is to assess the compliance of the activities of an economic entity with mandatory requirements the requirements of the land legislation of the Russian Federation for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land" compliance with mandatory requirements or requirements established by municipal legal acts compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements compliance with the instructions of state control bodies, supervision bodies of municipal control


# 421800071054
Unscheduled inspection
Start date: 2018-02-09, end date: 2018-03-13, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection of the use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of agricultural land" in the framework of the previously issued regulation on the elimination of violations of land legislation 124214vZN dated 25052017 the deadline for the execution of the regulation is 01022018 the objectives of this audit is to assess the compliance of the activities of an economic entity with the mandatory requirements of the land code. according to the legislation of the Russian Federation, the requirements for the protection and use of agricultural land, the turnover of which is regulated by Federal Law No. 101 FZ dated 24072002 "On the turnover of Agricultural Land", compliance with mandatory requirements or requirements established by municipal legal acts, compliance with information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements, compliance with the instructions of state control bodies, supervision bodies, municipal control bodies


# 421800022402
Unscheduled inspection
Start date: 2018-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 00170802935318
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-15, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to monitor the compliance of MMKUGOL LLC with the requirements of the previously issued regulation on the elimination of violations dated June 02, 2017 2502142, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated June 02, 2017 2502142, the deadline for which has expired. The purpose of this audit is Compliance by the person being checked with the instruction dated June 02, 2017 2502142 of the Siberian Rostechnadzor Department


# 00170802912490
Unscheduled inspection
Start date: 2017-11-28, end date: 2017-12-01, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: KIP 1409PTSE093 from 18092017


# 42170801980096
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used in the course of work Tasks compliance with the requirements of the legislation of the Russian Federation on urban planning activities during the construction of the object Subject compliance with the mandatory requirements of the legislation of the Russian Federation on urban planning activities


# 00170802059503
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-20, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision over an object of capital construction on the basis of a notice from MMKUGOL LLC on the completion of construction of an object of capital construction Prevention detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, Compliance of work performed and construction materials used and results during the construction of an object of capital construction, as well as the results of the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170801957726
Unscheduled inspection
Start date: 2017-09-04, end date: 2017-09-22, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by MMKUGOL LLC of the requirements of a previously issued instruction on the elimination of violations, the deadline for which has expired Verification of the elimination by a legal entity of the violations identified in the instruction on the elimination of violations, the deadline for which has expired Fulfillment by the audited entity of the instruction on the Siberian Directorate of Rostechnadzor


# 42170701872302
Unscheduled inspection
Start date: 2017-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 00170801955505
Unscheduled inspection
Start date: 2017-08-30, end date: 2017-09-05, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparations for the 2017-2018 OPP


# 42170701822098
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-08-15, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: 1 Supervision of compliance with the requirements of the legislation of the Russian Federation in the field of protection and use of agricultural lands, the turnover of which is regulated by Federal Law No. 24072002 101 FZ On the turnover of agricultural lands of land plots in the framework of the execution of previously issued regulations on the elimination of violations of legislation 402736ZN dated 09122016 deadline until 150720172 Assessment of compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation requirements for the protection and enforcement of land for agricultural purposes, the turnover of which is regulated by Federal Law No. 24022002 101 FZ "On the turnover of agricultural land" 3 Compliance with mandatory requirements established by municipal legal acts and compliance with regulations of state control bodies


# 00170701770788
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-28, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to monitor the fulfillment by MMKUGOL LLC of the requirements of the previously issued instruction on the elimination of violations dated March 24, 2017 2502019, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the instruction on the elimination of violations dated March 24, 2017 2502019, the deadline for which has expired. The purpose of this audit is Compliance by the person being checked with the instruction dated March 24, 2017 2502019 of the Siberian Rostechnadzor Department


# 42170701758089
Unscheduled inspection
Start date: 2017-07-06, end date: 2017-07-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kuzbassa
Purpose of inspection: Purpose Verification of the execution of regulation 05051701 of 15062017 Task verification of the elimination of violations committed during construction Subject Verification of the execution of regulation 05051701 of 15062017


# 42170701714865
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection:


# 42170701714966
Unscheduled inspection
Start date: 2017-06-27, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection:


# 00170701671280
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-06-23, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the capital construction facility "Inclined conveyor shaft of Chertinskaya Koksovaya Mine LLC" located at 1 Promyshlennaya str., Kemerovo region, Belovo, based on the inspection program dated December 2016. bn Prevention detection and suppression of violations of legislation on urban development by the developer and the technical customer, including the requirements of technical regulations of the design Documentationconformity of the work performed and the construction materials used and the results during the construction of the capital construction facility "Inclined Conveyor shaft LLC "Chertinskaya Koksovaya Mine" as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the need for a construction permit compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 42170701685276
Unscheduled inspection
Start date: 2017-06-02, end date: 2017-06-27, duration:
Authority: YUzhnoSibirskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Control over the elimination of violations, the fulfillment of which is mandatory in accordance with the instructions previously issued to the person being checked on the elimination of violations of the conditions of use of a water body from 26122016 VT1070V2 VT1070vZ, the deadline for which has expired, the instruction on the elimination of violations of legislation in the field of nature management and environmental protection from 26122016 VT1070VI, the deadline for which has expired


# 00170701594645
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-06-02, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to carry out state construction supervision during the construction of the capital construction facility "Reconstruction of the Kostromovskaya mine" stage 2" located at the address Kemerovo region Leninskkunetsky municipal district Podgornovskoye rural settlement license areas "Kostromovsky" and "Nikitinsky" on the basis of the inspection program from 15022017 to 420916the objectives of this inspection are the prevention, detection and suppression of violations committed by the developer the technical customer of violations of the legislation on urban development, including the requirements of the technical regulations of the design documentationthe subject of this audit is the compliance of the work performed and the construction materials used and the results during the construction of the capital construction facility "Reconstruction of the Kostromovskaya mine stage 2" as well as the results of such work with the requirements of the technical regulations of the design documentation, including energy efficiency requirements and equipment requirements the capital construction facility is equipped with metering devices for used energy resources. The need for a construction permit meets the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 00170701603559
Unscheduled inspection
Start date: 2017-05-04, end date: 2017-05-05, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of paragraphs 1469-1215 of Regulation 15101716 of 07/29/2016, the deadline for which has expired


# 42170701557269
Unscheduled inspection
Start date: 2017-04-19, end date: 2017-05-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Kemerovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees based on the application 7185117OB dated 07042017 and materials 1p20171273 dated 04042017 received from the prosecutor's office of Belovo


# 00170701498368
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control over the fulfillment by MMKUGOL LLC of the requirements of a previously issued prescription for the elimination of violations, the deadline for which has expired Verification of the elimination by a legal entity of the violations identified in the prescription for the elimination of violations, the deadline for which has expired fulfillment by the audited person of the instruction of the Siberian Directorate of Rostechnadzor


# 42170701557861
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-05-22, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Respublikam Hakasiya i Tyva i Kemerovskoi oblastiKuzbassu
Purpose of inspection: 1 Supervision of compliance with the requirements of the land legislation of the Russian Federation in the field of protection and use of agricultural lands, the turnover of which is regulated by Federal Law No. 24072002 101 FZ On the turnover of Agricultural Lands on the basis of a reasoned submission of a legal entity2 Assessment of compliance of the activities of an economic entity with the mandatory requirements of the land legislation of the Russian Federation for the protection and enforcement of agricultural lands, the turnover of which is regulated by Federal Law No. 24022002 101 FZ "On Turnover agricultural lands" 3Compliance with the mandatory requirements established by municipal legal acts for the prevention of harm to the life and health of citizens, harm to animals, plants, the environment, and the elimination of the consequences of such harm


# 00170701410551
Unscheduled inspection
Start date: 2017-03-01, end date: 2017-03-24, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of a capital construction facility on the basis of a verification program to prevent the detection and suppression of violations of urban planning legislation committed by the developer and technical customer, including the requirements of technical regulations for project documentation, and the compliance of work performed and applied building materials and results during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation, including including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.