Found 100 inspections:

# 002105297730
Unscheduled inspection
Start date: 2021-01-15, end date: —, duration:
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005260122
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005260173
Unscheduled inspection
Start date: 2020-12-08, end date: 2020-12-21, duration: 10
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 5_1 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registration number of the function in the federal state information system Federal Register of State and Municipal Services functions" 10001515438 Establish that this audit is conducted in order to monitor the fulfillment by a legal entity of the Gazprom Investgazification Limited Liability Company Gazprom Investgazification LLC OGRN 1027804855935 TIN 7810170130 of the requirements of paragraphs 114 of Regulation 10119MGSN2019 dated 10072019 deadline for the elimination of violations 10102019 extension of the period specified in regulation 15122019 on the basis of a Notice of elimination of violations during the construction and reconstruction of the facility of capital construction 0320 dated 09.012020 and petitions dated 01/122020 174120 vh reg 26128168 dated 01/122020 on the conduct of an audit The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including project documentation. The purpose of this audit is to comply with the instructions of the authorities State control supervision


# 002004267905
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 31072018. 382the purpose of this inspection is to verify the compliance of the work and construction materials used during the construction of the capital construction facility "Gazoprovodotvodok and GRS in the Asino area of the Tomsk region" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004267836
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004203039
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001904081082
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-27, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the implementation of paragraphs 120 of Regulation 10167MGSN2019 of 20092019


# 001903982812
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 31072018. 382the purpose of this inspection is to verify the compliance of the work and construction materials used during the construction of the capital construction facility "Gazoprovodotvodok and GRS in the Asino area of the Tomsk region" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 001903008158
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-20, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 001902629009
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-05-07, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the Inspection Program approved by Kolegov DV 382, Deputy Head of the Siberian Department of Rostechnadzor


# 021902674845
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-31, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The objectives of this audit are to identify prevent and suppress violations of the legislation on urban development, including technical regulations and project documentation


# 021800711372
Unscheduled inspection
Start date: 2018-08-24, end date: —, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection:


# 091800233231
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-23, duration:
Authority: Ministerstvo stroitelstva i zhilischnokommunalnogo hozyaistva KarachaevoCHerkesskoi Respubliki
Purpose of inspection: Preparatory construction period works below the 1st floor and the 1st floor of the building


# 021800044972
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation.


# 021800044955
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-03-05, duration:
Authority: Gosudarstvennyi komitet Respubliki Bashkortostan po zhilischnomu i stroitelnomu nadzoru
Purpose of inspection: The objectives of this audit are to identify, prevent and suppress violations of legislation on urban development, including technical regulations and project documentation.


# 00180803027625
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-03-01, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision in accordance with Paragraph 51 of Article 6 of the Civil Code of the Russian Federation prevention detection and suppression of violations of legislation on urban development activities compliance of completed works with the requirements of technical regulations and project documentation


# 00180803027703
Unscheduled inspection
Start date: 2018-01-09, end date: 2018-03-01, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision in accordance with Paragraph 51 of Article 6 of the Civil Code of the Russian Federation prevention detection and suppression of violations of legislation on urban development activities compliance of completed works with the requirements of technical regulations and project documentation


# 00170701837057
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the instruction on the elimination of comments from 19062017 052516660101 previously issued by the Far Eastern Department of Rostechnadzor


# 00170701837051
Unscheduled inspection
Start date: 2017-08-14, end date: 2017-08-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the instruction on the elimination of comments from 19062017 052516700101 previously issued by the Far Eastern Department of Rostechnadzor


# 00160601524406
Unscheduled inspection
Start date: 2016-03-14, end date: 2016-03-25, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the activities of legal licindividual entrepreneurs in compliance with the requirements of the legislation on urban development, mandatory norms and rules during the construction of a capital construction facility


# 432101460119
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: 7
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Kirovskoi oblasti
Purpose of inspection: Objectives: Verification of the completed capital construction facility Tasks: Prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design and working documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer Subject: 1) compliance of the work performed and the construction materials and products used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model; 2) the requirements for a construction permit, as well as the parameters of the capital construction facility under construction, under reconstruction, specified in the construction permit; 3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) the requirements established by part 4 of Article 52 of the Urban Planning Code of the Russian Federation to ensure the conservation of the capital construction facility; 5) requirements for the procedure for the implementation of construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 782101333196
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: 1
Authority: Gosudarstvennaya administrativno-tehnicheskaya inspekciya
Purpose of inspection: execution of the GATI regulation No. 87262 dated 16.01.2017


# 612101364526
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration: 10
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: execution of clause 8 of the inspection program: Finishing works, installation of internal and external networks and communications. The device of an automatic fire extinguishing system. Landscaping, sports ground, small architectural forms. The pumping station is installed. Installation of gas boiler room equipment. Installation of a diesel generator. Commissioning works. Installation of sports equipment. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor). The subject of this audit is verification of: compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 632101354201
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 612101158400
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 562101245813
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: – this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 08/23/2021; – the objectives of this audit are: prevention, detection and suppression of violations of legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (including with taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation). -the subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; 2) building permit requirements; 3) the requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for carrying out construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts; 5) paragraph 3 of the inspection program approved on 08/23/2021 (installation of monolithic reinforced concrete structures below grade 0.000. Excavation).


# 632100549642
Unscheduled inspection
Start date: 2021-09-16, end date: —, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 762100433932
Unscheduled inspection
Start date: 2021-08-11, end date: —, duration:
Authority:
Purpose of inspection:


# 612100430130
Unscheduled inspection
Start date: 2021-08-05, end date: —, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:


# 562100350342
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision; - the objectives of this audit are: to identify and prevent violations of the requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, legislation on urban development (Part 2 of art. 51, Part 2, 3, 3.1, 6 of art. 52, Part 2, 4 of art. 53 Urban Planning Code of the Russian Federation). -the subject of this audit is: compliance with the mandatory requirements of urban planning legislation.


# 632100246888
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-05-25, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


# 612100265459
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 8
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The inspection is carried out in order to comply with clause 6 of the inspection program: Installation of partitions, roofing, installation of internal and external networks and communications, installation of enclosing structures, filling of external window and door openings, installation of metal structures of the building (canopies, cornices, fire escapes)


# 432100304516
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration: 7
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Kirovskoi oblasti
Purpose of inspection: Objectives: Implementation of the verification program Tasks: Prevention, detection and suppression of violations of legislation on urban development, including technical regulations, and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer Subject: Compliance with mandatory requirements or requirements established by municipal legal acts


# 342100193737
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration: 8
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the fulfillment by a legal entity, Gazprom Investgazification Limited Liability Company (Gazprom Investgazification LLC, OGRN 1027804855935, TIN 7810170130) of the requirements of paragraphs 1-10 of Regulation No. 10-13MGSN/2021 dated 02/11/2021 (the deadline for eliminating violations is 05/11/2021) and on the basis of a letter from Gazprom JSC Astrakhan Gas Distribution" (customer) dated 04/05/2021, No. RH-04/2945 (ex. reg. No. 261/10310 dated 04/20/2021) – on the elimination of violations in full. The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of a contract with the developer or customer. The subject of this audit is: compliance with the regulations of the state control (supervision) bodies


# 762100202341
Unscheduled inspection
Start date: 2021-05-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:


# 002105297730
Unscheduled inspection
Start date: 2021-01-15, end date: 2021-02-11, duration: 20
Authority: Nizhne-Volzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out on the basis of the received Notice of Completion of construction dated 12/25/2020 No. DK-20/10857 (ex. reg. No. 261/51924 dated 12/28/2020) of the capital construction facility "Makat - North Caucasus – Hosheutovo – Volnoye – Kharabali Gas pipeline branch of the Kharabalinsky district of the Astrakhan region". The objectives of this audit are: prevention, detection and suppression of violations of legislation on urban development, including technical regulations and project documentation, committed by the developer (customer), as well as by the person carrying out construction on the basis of a contract with the developer or customer. The subject of this audit is: verification of the conformity of the work performed and the construction materials used during the construction and reconstruction of the capital construction facility "Makat - North Caucasus – Hosheutovo – Volnoye – Kharabali Gas Pipeline branch of the Kharabalinsky district of the Astrakhan Region", the construction customer is Gazprom Investgazification Limited Liability Company (Gazprom Investgazification LLC, OGRN 1027804855935, TIN 7810170130), as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; Meeting the requirements established by Parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 472005323324
Unscheduled inspection
Start date: 2020-12-16, end date: —, duration:
Authority:
Purpose of inspection:


# 612005256817
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection:


# 432005283555
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration:
Authority:
Purpose of inspection:


# 002005260122
Unscheduled inspection
Start date: 2020-12-08, end date: 2020-12-21, duration: 10
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 5_1 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registration number of the function in the federal state information system Federal Register of State and Municipal Services functions" 10001515438 Establish that this inspection is carried out in order to monitor the fulfillment by a legal entity of the Gazprom Investgazification Limited Liability Company Gazprom Investgazification LLC OGRN 1027804855935 TIN 7810170130 of the requirements of paragraphs 17 of Regulation 1038MGSN2020 dated 24032020 on the basis of a Notice on the elimination of violations during the construction of the reconstruction of the capital construction facility 10520 dated 21042020 and a petition dated 01122020 173120 EC Reg 26128166 of 01122020 on conducting an audit The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002005260173
Unscheduled inspection
Start date: 2020-12-08, end date: 2020-12-21, duration: 10
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of state construction supervision during the construction reconstruction and major repairs of facilities specified in paragraph 5_1 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registration number of the function in the federal state information system Federal Register of State and Municipal Services functions" 10001515438 Establish that this audit is conducted in order to monitor the fulfillment by a legal entity of the Gazprom Investgazification Limited Liability Company Gazprom Investgazification LLC OGRN 1027804855935 TIN 7810170130 of the requirements of paragraphs 114 of Regulation 10119MGSN2019 dated 10072019 deadline for the elimination of violations 10102019 extension of the period specified in regulation 15122019 on the basis of a Notice of elimination of violations during the construction and reconstruction of the facility of capital construction 0320 dated 09.012020 and petitions dated 01/122020 174120 vh reg 26128168 dated 01/122020 on the conduct of an audit The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, including project documentation. The purpose of this audit is to comply with the instructions of the authorities State control supervision


# 762005256551
Unscheduled inspection
Start date: 2020-12-04, end date: 2020-12-28, duration: 18
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out in order to, on the basis of the notice of completion of construction of BX 1759 dated 30112020, the objectives of this inspection are to determine the compliance of the constructed capital construction facility with the requirements of the project documentation. The subject of this inspection is to comply with mandatory requirements


# 612005233596
Unscheduled inspection
Start date: 2020-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 702005234047
Unscheduled inspection
Start date: 2020-11-24, end date: —, duration:
Authority:
Purpose of inspection:


# 762005245280
Unscheduled inspection
Start date: 2020-11-30, end date: 2020-11-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements


# 702005150174
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection:


# 612005203160
Unscheduled inspection
Start date: 2020-10-13, end date: 2020-10-23, duration: 9
Authority: Regionalnaya sluzhba gosudarstvennogo stroitelnogo nadzora Rostovskoi oblasti
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, and to comply with mandatory requirements and or requirements established by municipal legal acts to review those submitted by the developer, the technical customer, the person carrying out construction on the basis of an agreement with the developer, or the technical customer to carry out the inspection documents related to the performance of works including individual works building structures sections of engineering support networks engineering systems and equipment the use of building materials products as well as the implementation of construction control period during the inspection to formalize the results of the inspection period during the inspection to conduct a visual inspection of the work performed including individual completed works building structures sections of engineering support networks and the applied building materials and products during the inspection, in accordance with the procedure and in cases provided for by the legislation of the Russian Federation on administrative offenses, to take actions aimed at bringing to administrative responsibility persons who have committed administrative offenses


# 762004462705
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-07-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: determination of compliance of works performed during the construction of a capital construction facility with the requirements of project documentation


# 432004461639
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration:
Authority:
Purpose of inspection:


# 432004411365
Unscheduled inspection
Start date: 2020-05-21, end date: 2020-05-29, duration:
Authority: Ministerstvo stroitelstva Kirovskoi oblasti
Purpose of inspection: Objectives Implementation of the verification task program Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentationsubject Compliance with mandatory requirements or requirements established by municipal legal acts committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer


# 702004406883
Unscheduled inspection
Start date: 2020-05-13, end date: —, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection:


# 762004389548
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out with the aim of, on the basis of the notice of completion of the construction of the reconstruction of the capital construction facility bx 499 dated 26032020 letter from the developer 12022232 dated 2703 2020, the objectives of this inspection are to determine the compliance of the constructed capital construction facility with the requirements of the project documentation 7 The subject of this inspection is the observance of mandatory requirements


# 562004383379
Unscheduled inspection
Start date: 2020-04-02, end date: 2020-04-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision. The objectives of this audit are to identify and prevent violations of legislation on urban development activities by the developer, including project documentation. The purpose of this audit is to comply with the Urban planning legislation of the Russian Federation


# 762004394294
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-05-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out in order to, on the basis of the notice of completion of the construction of the BX 500 dated 26032020, the objectives of this inspection are to determine the compliance of the constructed capital construction facility with the requirements of the project documentation. The purpose of this inspection is to comply with mandatory requirements


# 302004444990
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority:
Purpose of inspection:


# 672004324789
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-10, duration:
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision in the Smolensk region in accordance with the inspection program dated September 06, 2019. The purpose of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements for With the exception of capital construction facilities to which energy efficiency requirements do not apply, the requirements for equipping a capital construction facility with metering devices for used energy resources are also excluded.


# 762004387179
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-03-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out in order to determine the compliance of the constructed capital construction facility with the requirements of the design documentation on the basis of the notice of completion of construction of the reconstruction of the capital construction facility bx from 26032020the objectives of this inspection are to determine the compliance of the constructed capital construction facility with the requirements of the design documentation


# 762004355262
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:


# 002004280995
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-24, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 432004259243
Unscheduled inspection
Start date: 2020-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 002004267905
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 31072018. 382the purpose of this inspection is to verify the compliance of the work and construction materials used during the construction of the capital construction facility "Gazoprovodotvodok and GRS in the Asino area of the Tomsk region" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 002004267836
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-03-17, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor dated 05/12/2019. 434 The subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Gazoprovodotvodok and GDS Pobeda Tomsk region" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 762004274366
Unscheduled inspection
Start date: 2020-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 762004304245
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-02-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: determination of compliance of works performed during the construction of a capital construction facility with the requirements of project documentation


# 002004203039
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-31, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the fulfillment of paragraphs 114 of Regulation 10119MGSN2019 of 10072019, the deadline for eliminating violations of 10102019 was extended by a letter from the Acting head of the NizhnEvolzhsky Department of Rostechnadzor dated 09102019 011021441 to 15122019.


# 761904054516
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the verification program, the objectives of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations and project documentation


# 651904106271
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-12, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Execution of the inspection program verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in the SRO as well as the availability of specialists included to the national register of specialists in the field of construction


# 631904036923
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-30, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Samarskoi oblasti
Purpose of inspection: Verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 431904063542
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration:
Authority: Ministerstvo stroitelstva Kirovskoi oblasti
Purpose of inspection:


# 761904114658
Unscheduled inspection
Start date: 2019-12-19, end date: 2019-12-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The purpose of this audit is to comply with mandatory requirements


# 001904081082
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-27, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the implementation of paragraphs 120 of Regulation 10167MGSN2019 of 20092019


# 001903982812
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-25, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in order to implement the Inspection Program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 31072018. 382the purpose of this inspection is to verify the compliance of the work and construction materials used during the construction of the capital construction facility "Gazoprovodotvodok and GRS in the Asino area of the Tomsk region" as well as the results of such work with the requirements approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 761903980056
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The purpose of this audit is to comply with mandatory requirements


# 671904021852
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 431903976725
Unscheduled inspection
Start date: 2019-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 671903882773
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-28, duration:
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is conducted in order to carry out regional state construction supervision in the Smolensk Region in accordance with the inspection program dated September 06, 2019. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. project documentation


# 361903874771
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-11-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 761903882190
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 431903207937
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-01, duration:
Authority: Ministerstvo stroitelstva Kirovskoi oblasti
Purpose of inspection: Objectives Implementation of the verification task program Prevention detection and suppression of violations of the legislation on urban development, including technical regulations and design documentationsubject Compliance with mandatory requirements or requirements established by municipal legal acts committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer


# 701903253986
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-10-04, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: Purpose Prevention and detection and suppression of violations of urban planning legislation during an unscheduled on-site documentary inspection based on the inspection program 2119PP1 dated 300-52019 task prevention and detection and suppression of violations of urban planning legislation subject to compliance with mandatory requirements or requirements established by municipal legal acts of the performance of works and applied building materials during construction reconstruction of a capital construction facility as well as the results of such work requirements project documentation, the availability of a building permit, and compliance with the requirements of Parts 2, 3, and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 651902986044
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority:
Purpose of inspection:


# 671902978532
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration:
Authority:
Purpose of inspection:


# 001903008158
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-09-20, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 761903037666
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-08-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The purpose of this audit is to comply with mandatory requirements


# 761902862052
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine the fulfillment of the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, Article 39 384 FZ of 30122009 when performing construction and reconstruction work on a capital construction facility. The subject of this audit is to comply with mandatory requirements


# 761902862853
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: determination of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation


# 701902775703
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-07-08, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: purpose prevention and detection and suppression of violations of urban planning legislation during an unscheduled on-site inspection based on the notice of the start of construction dated 24052019 task prevention and detection and suppression of violations of urban planning legislation subject to compliance with mandatory requirements or requirements established by municipal legal acts of compliance with the performance of works and applied building materials during construction reconstruction of a capital construction facility as well as the results of such works meet the requirements of the design documentation for the construction permit and the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 001902739607
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-07-10, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer


# 271902780113
Unscheduled inspection
Start date: 2019-06-11, end date: 2019-07-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of a notice from the developer Gazprom investgazification LLC on the completion of the construction of the Facility dated 05062019 2 bx 2418 dated 05062019 The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including project documentation. The subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the Facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 271902758305
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of regional state construction supervision based on the notice of the developer Gazprom Investgazification LLC on the execution of the instruction dated March 21, 2019 C07052019 on the elimination of violations during the construction of a capital construction facility issued by the state construction supervision authority The objectives of this inspection are to prevent detect and suppress violations of current legislation on urban planning and project documentation. The subject of this inspection is checking the execution of the Order


# 671902826245
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 761902811688
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-06-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements


# 651902726771
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-27, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Execution of the inspection program verification of compliance of the work performed and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in the SRO as well as the availability of specialists included to the national register of specialists in the field of construction


# 761902759081
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: determination of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation


# 431902717650
Unscheduled inspection
Start date: 2019-05-28, end date: —, duration:
Authority:
Purpose of inspection:


# 671902656768
Unscheduled inspection
Start date: 2019-04-17, end date: —, duration:
Authority:
Purpose of inspection:


# 761902677042
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is compliance with mandatory requirements


# 001902629009
Unscheduled inspection
Start date: 2019-04-05, end date: 2019-05-07, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the Inspection Program approved by Kolegov DV 382, Deputy Head of the Siberian Department of Rostechnadzor


# 431902663589
Unscheduled inspection
Start date: 2019-04-24, end date: —, duration:
Authority:
Purpose of inspection:


# 761902674022
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is conducted in order to determine, on the basis of the audit program, the objectives of this audit are to determine compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, Article 39 384 FZ of 30122009. When performing construction and reconstruction work on a capital construction facility, the subject of this audit is compliance with mandatory requirements


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.