# 762101433387
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out for the following purposes:
on the basis of the notice of completion of construction (reconstruction) of the capital construction facility No. 1672 dated 11/30/2021.
The objectives of this audit are:
to determine the compliance of the constructed capital construction facility with the requirements of the design documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762101451430
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762101457992
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out for the following purposes:
on the basis of the notice of completion of construction (reconstruction) of the capital construction facility No. 1745 dated 12/08/2021.
The objectives of this audit are:
to determine the compliance of the constructed capital construction facility with the requirements of the design documentation.
7. The subject of this audit is:
compliance with mandatory requirements
# 762101451229
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762101301281
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762101052917
Unscheduled inspection
Start date: 2021-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762101063028
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762100344087
Unscheduled inspection
Start date: 2021-08-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives: based on the inspection program. Tasks: to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the design documentation; to verify the fulfillment of the instruction on the elimination of violations dated 06/11/2021 № 3-2613.. Subject: compliance with mandatory requirements.
# 762100545484
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100524682
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out for the following purposes:
on the basis of the notice of completion of construction (reconstruction) of the capital construction facility No. 1095 dated 08/09/2021.
The objectives of this audit are:
to determine the compliance of the constructed capital construction facility with the requirements of the design documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100338298
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762100373558
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762100262675
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements
# 762100265235
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives: based on the inspection program. Tasks: to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation. Subject: compliance with mandatory requirements.
# 762100312066
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to: based on the audit program. The objectives of this audit are: to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation. 7. The subject of this audit is: compliance with mandatory requirements.
# 762100199383
Unscheduled inspection
Start date: 2021-05-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100129696
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives: based on the inspection program. Tasks: to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation. Subject: compliance with mandatory requirements.
# 762100108497
Unscheduled inspection
Start date: 2021-04-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out for the following purposes:
on the basis of a notice of completion of construction (reconstruction) of a capital construction facility
The objectives of this audit are:
to determine the compliance of the constructed capital construction facility with the requirements of the design documentation.
# 762100182403
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100182578
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100066785
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100080315
Unscheduled inspection
Start date: 2021-03-23, end date: 2021-03-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives: to monitor compliance with urban planning legislation during the construction of a capital construction facility, based on an order issued to the person being audited to eliminate the identified violation, the deadline for which expired on 03/16/2021; notices of elimination of the identified violations; petitions of the person being audited to conduct an inspection (vx. № 303/2021 dated 03/15/2021). Tasks: checking the execution of the order on elimination of violations from 03/09/2021 № 7-2613. Subject: compliance with mandatory requirements.
# 762005280675
Unscheduled inspection
Start date: 2020-12-18, end date: 2020-12-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005256173
Unscheduled inspection
Start date: 2020-12-21, end date: 2020-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762005280602
Unscheduled inspection
Start date: 2020-12-22, end date: 2020-12-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation7 The subject of this audit is to comply with mandatory requirements
# 762005280641
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005286147
Unscheduled inspection
Start date: 2020-12-26, end date: 2020-12-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005231305
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005231336
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762005212598
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005246781
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762005172230
Unscheduled inspection
Start date: 2020-10-27, end date: 2020-10-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762005171363
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation7 The subject of this audit is the observance of mandatory requirements
# 762005177313
Unscheduled inspection
Start date: 2020-10-13, end date: 2020-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762005177236
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762004555802
Unscheduled inspection
Start date: 2020-08-26, end date: 2020-08-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives details of the reasoned submission of an official of the state construction supervision authority dated 18082020 Tasks 22613 dated 02072020 Subject Compliance with mandatory requirements
# 762004506487
Unscheduled inspection
Start date: 2020-08-27, end date: 2020-08-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762004497191
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-08-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004497172
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-08-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004452439
Unscheduled inspection
Start date: 2020-08-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762004490249
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-08-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762004478932
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-08-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements
# 762004442245
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004458180
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762004456994
Unscheduled inspection
Start date: 2020-07-17, end date: 2020-07-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements
# 762004445498
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The inspection is carried out in order to determine, on the basis of the notice of completion of construction of the reconstruction of the capital construction facility 880 dated 22062020, the objectives of this inspection are to determine the compliance of the constructed capital construction facility with the requirements of the design documentation
# 762004448389
Unscheduled inspection
Start date: 2020-07-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762004411501
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762004411492
Unscheduled inspection
Start date: 2020-06-17, end date: 2020-06-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004432495
Unscheduled inspection
Start date: 2020-06-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762004429392
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-06-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements
# 762004418770
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-06-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004413470
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-05-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762004403888
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004403896
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004396529
Unscheduled inspection
Start date: 2020-04-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762004363935
Unscheduled inspection
Start date: 2020-04-13, end date: 2020-04-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the inspection program Tasks to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation Subject to compliance with mandatory requirements
# 762004364080
Unscheduled inspection
Start date: 2020-04-14, end date: 2020-04-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Objectives based on the verification task program, to determine whether the work performed during the construction of a capital construction facility meets the requirements of the project documentationsubject compliance with mandatory requirements
# 762004345933
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out in order to determine, based on the verification program, the objectives of this inspection are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation
# 762004341292
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-03-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements
# 762004273068
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762004273034
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out in order to determine, based on the verification program, the objectives of this inspection are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation
# 762004267360
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: To establish that the verification is carried out for the purpose of, on the basis of the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the design documentation. The subject of this audit is the observance of mandatory requirements
# 762004300429
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out in order to determine, based on the verification program, the objectives of this inspection are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation
# 762004205965
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761904064861
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation.
# 761904065043
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation.
# 761904065098
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation.
# 761904065142
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation
# 761904065184
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations, norms and rules of other regulatory legal acts and project documentation.
# 761904050392
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The subject of this audit is to comply with mandatory requirements
# 761904021458
Unscheduled inspection
Start date: 2019-11-15, end date: 2019-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the notice of completion of the construction of the reconstruction of the capital construction facility 1712 dated 12112019, the tasks of this audit are to determine the compliance of the constructed capital construction facility with the requirements of project documentation and other regulatory legal acts.
# 761903837665
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation7 The subject of this audit is compliance with mandatory requirements
# 761903277911
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation7 The subject of this audit is compliance with mandatory requirements
# 761902976012
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902986902
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation
# 761902865750
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Based on the verification program, the tasks of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation
# 761902844640
Unscheduled inspection
Start date: 2019-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902844825
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902861584
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902805221
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-06-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine the compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is to comply with mandatory requirements
# 761902823700
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-06-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761902639954
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-04-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761902710167
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of the audit is to determine, based on the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of the design documentation. The purpose of this audit is to comply with mandatory requirements
# 761902588677
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-03-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: the inspection is carried out in order to, on the basis of the notice of the start of construction of BX260 dated 07032019, determine the fulfillment of the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, Article 39 384 FZ dated 30122009, when carrying out work on the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements
# 761902506602
Unscheduled inspection
Start date: 2019-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761802219858
Unscheduled inspection
Start date: 2018-12-06, end date: 2018-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761802128568
Unscheduled inspection
Start date: 2018-11-09, end date: 2018-11-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761801944933
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-10-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761800608124
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements