# 001902923930
	
Unscheduled inspection
	
Start date: 2019-08-19, end date: 2019-08-30, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor 25021252 dated 31052019 on the elimination of identified offenses, the deadline for which expires. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation. The purpose of this inspection is to comply with the regulations federal state construction supervision bodies
	# 001902709032
	
Unscheduled inspection
	
Start date: 2019-05-13, end date: 2019-06-07, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Kolegov DV C3302018 dated 15102018, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
	# 001902455841
	
Unscheduled inspection
	
Start date: 2019-01-24, end date: —, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: 
	# 001800207146
	
Unscheduled inspection
	
Start date: 2018-02-05, end date: —, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: 
	# 00170801930687
	
Unscheduled inspection
	
Start date: 2017-09-11, end date: —, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: 
	# 00170701658612
	
Unscheduled inspection
	
Start date: 2017-06-26, end date: 2017-07-07, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: To establish that this audit is being conducted in order to monitor the compliance of OMUS 1 OJSC with the requirements of the previously issued regulation on the elimination of violations dated March 15, 2017 2502039, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated March 15, 2017 2502039, the deadline for which has expired. The purpose of the audit is the fulfillment by the audited person of the instruction dated March 15, 2017 2502039 of the Siberian Administration of Rostechnadzor
	# 00170701526171
	
Unscheduled inspection
	
Start date: 2017-04-10, end date: 2017-04-21, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Control over the execution of Regulation O251708 of 17032017 on the elimination of identified offenses, the deadline for which expires. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including technical regulations and design documentationthe subject of this audit is to comply with regulation O251708 of 17032017 of the state construction supervision authority
	# 00170701308789
	
Unscheduled inspection
	
Start date: 2017-01-23, end date: 2017-02-10, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Compliance by the audited person with the instruction dated October 31, 2016 2502203 of the Siberian Rostechnadzor Department
	# 422100300222
	
Unscheduled inspection
	
Start date: 2021-06-17, end date: —, duration: 10
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: This check is carried out for the purpose of: monitoring the implementation of the previously issued regulation No. 01/17 dated 03/15/2021 on items No. 1-7, the deadlines for which have expired;
The objectives of this audit are: monitoring the implementation of the previously issued regulation No. 01/17 dated 03/15/2021 on items No. 1-7, the deadlines for which have expired.
The subject of this audit is:
the fulfillment of the instruction of the official of the Siberian Department of Rostechnadzor dated 03/15/2021 No. 01/17 on items No. 1-7, the deadlines for which have expired.
	# 552100078466
	
Unscheduled inspection
	
Start date: 2021-03-18, end date: 2021-04-14, duration: 20
	
Authority: Gosudarstvennaya inspekciya truda v Omskoi oblasti
	
Purpose of inspection: protection of the rights and interests of employees of OMUS-1 JSC, in connection with the consideration of the appeal of the employee Kutsevol Artem Sergeevich about the violation of their labor rights in terms of legislation on remuneration. Written request of the cc. No. 55/7-537-21- About from 03/04/2021.                                      
	# 422100075554
	
Unscheduled inspection
	
Start date: 2021-03-22, end date: 2021-04-16, duration: 20
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: This inspection is carried out in order to implement the Inspection Program approved by Deputy Head of the Siberian Department of Rostechnadzor D.V. Kolegov dated 01/27/2021
№ 330/2021.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor).
	# 002004469947
	
Unscheduled inspection
	
Start date: 2020-07-30, end date: 2020-08-26, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: This audit is conducted in order to implement the Audit Program approved by Deputy Head of the Siberian Directorate of Rostechnadzor Kolegov DV C3302018 dated 15102018. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is to verify the compliance of the work and the applicable construction materials during the construction of the capital construction facility "DT Dewaxing Hydrotreating Unit" located 644040 Omsk region, Omsk Gubkin Ave. 1, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with Parts 3_8 and 3_9 article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used. construction of the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
	# 552004341414
	
Unscheduled inspection
	
Start date: 2020-03-05, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 552004370111
	
Unscheduled inspection
	
Start date: 2020-03-17, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 551903879867
	
Unscheduled inspection
	
Start date: 2019-10-21, end date: —, duration: —
	
Authority: Glavnoe upravlenie MCHS Rossii po Omskoi oblasti
	
Purpose of inspection: 
	# 001902923930
	
Unscheduled inspection
	
Start date: 2019-08-19, end date: 2019-08-30, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: The inspection is carried out in order to monitor the implementation of the instruction of the Siberian Directorate of Rostechnadzor 25021252 dated 31052019 on the elimination of identified offenses, the deadline for which expires. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer contractor, including project documentation. The purpose of this inspection is to comply with the regulations federal state construction supervision bodies
	# 001902906500
	
Unscheduled inspection
	
Start date: 2019-08-05, end date: 2019-09-13, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: This inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating Tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 08, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating Tower cranes from 2017 to 2019" By the objectives of this inspection The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts. by a person in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products operating processes and recycling
	# 001902709032
	
Unscheduled inspection
	
Start date: 2019-05-13, end date: 2019-06-07, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: in order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor Kolegov DV C3302018 dated 15102018, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor
	# 551902631154
	
Unscheduled inspection
	
Start date: 2019-04-10, end date: 2019-05-14, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: The purpose of ensuring the sanitary and epidemiological well-being of the population consumer rights protection and compliance with mandatory requirements for goods works and services Tasks detection suppression of violations of the legislation of the Russian Federation in the field of sanitary and epidemiological well-being of the population consumer rights protection and compliance with mandatory requirements for goods works and services Subject to compliance with regulations of state control and supervision bodies
	# 551902617921
	
Unscheduled inspection
	
Start date: 2019-04-01, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 001902455841
	
Unscheduled inspection
	
Start date: 2019-01-24, end date: 2019-02-20, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: In order to implement the Inspection Program approved by the Acting Deputy Head of the Siberian Department of Rostechnadzor, AP Gayenko, dated 051020183282018, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this inspection is the compliance of the work and the construction materials used and the results during the construction of the capital construction facility "Reconstruction of the delayed coking unit 21103M" as well as the results of such work meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 3_1 of Article 52 of the Urban Planning Code of the Russian Federation 190FZ from 29/122004
	# 551801558746
	
Unscheduled inspection
	
Start date: 2018-09-25, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 001800584237
	
Unscheduled inspection
	
Start date: 2018-08-13, end date: 2018-09-07, duration: —
	
Authority: Sibirskoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
	
Purpose of inspection:  compliance with the requirements of state control bodies, supervision bodies, municipal control bodies, assessment of the conformity of measurements of units of quantities of standards of units of quantities of standard samples of measuring instruments in the field of state regulation of ensuring the uniformity of measurements with the established requirements for the fulfillment of the previously issued instruction dated July 13, 2018 M46 in connection with the expiration of the deadline "August 12, 2018 
	# 551800592946
	
Unscheduled inspection
	
Start date: 2018-07-27, end date: 2018-08-23, duration: —
	
Authority: Gosudarstvennaya inspekciya truda v Omskoi oblasti
	
Purpose of inspection: protection of the rights and interests of Alexey Olegovich Yartsev in connection with the consideration of his appeal dated 18072018 557143018 about the violation of his labor rights regarding remuneration  
	# 001800354613
	
Unscheduled inspection
	
Start date: 2018-06-04, end date: 2018-07-02, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: In order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Technological Condensate Purification Unit" located at 1 Gubkin Ave., Omsk, based on the inspection program approved by the Deputy Head of the Siberian Directorate of Rostechnadzor dated 08112017 C3132017, the objectives of this audit are prevention detection and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including the requirements of the technical regulations of the project documentation, the subject of this audit is the compliance of the work performed and the building materials used during the construction of the capital construction facility "Technological Condensate Purification Unit" and the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements of Parts 2 3 3_1 of Article 52 of the Urban Planning Code of the Russian Federation
	# 551800338087
	
Unscheduled inspection
	
Start date: 2018-05-08, end date: 2018-06-05, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: The purpose of ensuring the sanitary and epidemiological well-being of the population consumer protection and compliance with mandatory requirements for goods, works and services Tasks detection and suppression of violations of the legislation of the Russian Federation in the field of ensuring sanitary and epidemiological well-being of the population consumer protection and compliance with mandatory requirements for goods, works and services Subject to the requirements of state control supervision 
	# 001800375817
	
Unscheduled inspection
	
Start date: 2018-05-21, end date: 2018-06-01, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: In order to monitor the implementation of paragraphs 1 to 2 of Regulation O251808 of 05032018 on the elimination of identified offenses, the deadline for which has expired, the objectives of this audit are to establish the facts of compliance with non-compliance with paragraphs 1 to 2 of Regulation O251808 of 05032018
	# 001800084324
	
Unscheduled inspection
	
Start date: 2018-02-19, end date: 2018-03-21, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: In order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Hydrogen Production Plant" located at 644040 Omsk region, Omsk Gubkin Ave. 1 in accordance with the inspection program approved by and about the Deputy head of the Siberian Department of Rostechnadzor dated 26012017 C2962017 The objectives of this audit are to prevent, identify and suppress violations of urban planning legislation committed by a person carrying out construction on the basis of a contract with a developer or technical customer, including the requirements of technical regulations for project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Hydrogen Production Plant" and the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
	# 001800084195
	
Unscheduled inspection
	
Start date: 2018-02-19, end date: 2018-03-21, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: In order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Technological Condensate Purification Unit" located at 644040 Omsk region, Omsk Gubkin Ave. 1 in accordance with the inspection program approved by and about the Deputy head of the Siberian Department of Rostechnadzor from 08112017 C3132017 The objectives of this audit are to prevent, identify and suppress violations of urban planning legislation committed by the person carrying out construction on the basis of a contract with a developer or technical customer, including the requirements of technical regulations for project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Technological Condensate Purification Unit" as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
	# 001800073055
	
Unscheduled inspection
	
Start date: 2018-02-19, end date: 2018-03-21, duration: —
	
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Sibirskomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
	
Purpose of inspection: This audit is conducted for the purpose of state control and supervision of compliance with the requirements of the legislation of the Russian Federation on ensuring transport safety on the basis of Paragraph 1 of Part 2 of Article 10 of the Federal Law of 26122008 294 FZ "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the implementation of state Control supervision and Municipal control" in connection with the expiration of the deadline for the execution of the order ZS 20170610121AVT of 28072017 issued JSC OMUS 1, the deadline for which expired on February 01, 2018, the purpose of this audit is to carry out measures to monitor the compliance of JSC OMUS 1 with the requirements of the legislation of the Russian Federation on ensuring transport safety. The subject of this audit is to verify the information contained in the documents of JSC OMUS 1 related to the implementation of the regulation ZS 20170610121AVT dated 28072017  
	# 001800207146
	
Unscheduled inspection
	
Start date: 2018-02-05, end date: 2018-03-05, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: in order to control the compliance of the completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "OUTN1 of JSC GazpromneftyONPZ" located at Omsk Gubkin Ave. 1
	# 55170802970976
	
Unscheduled inspection
	
Start date: 2017-12-11, end date: 2017-12-25, duration: —
	
Authority: Glavnoe upravlenie MCHS Rossii po Omskoi oblasti
	
Purpose of inspection: control over the execution of the order of the state control supervision and municipal control authority order of the territorial department of supervision and preventive work of the Soviet JSC Omsk dated 29082017 1261114 due on 01/122017
	# 00170802820521
	
Unscheduled inspection
	
Start date: 2017-11-07, end date: 2017-11-09, duration: —
	
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu  i atomnomu nadzoru
	
Purpose of inspection: Execution of the regulation from 15082017 g 432G3327N192
	# 00170801930687
	
Unscheduled inspection
	
Start date: 2017-09-11, end date: 2017-09-22, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: To establish that this audit is being conducted in order to monitor the compliance of OMUS 1 OJSC with the requirements of the previously issued regulation on the elimination of violations dated July 21, 2017 2502181, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated July 21, 2017 2502181, the deadline for which has expired under the terms of this audit It is the fulfillment by the audited person of the instruction dated July 21, 2017 2502181 of the Siberian Administration of Rostechnadzor
	# 55170701682187
	
Unscheduled inspection
	
Start date: 2017-07-04, end date: —, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: 
	# 00170701658612
	
Unscheduled inspection
	
Start date: 2017-06-26, end date: 2017-07-07, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: To establish that this audit is being conducted in order to monitor the compliance of OMUS 1 OJSC with the requirements of the previously issued regulation on the elimination of violations dated March 15, 2017 2502039, the deadline for which has expired. The objectives of this audit are to verify that the legal entity has eliminated the violations specified in the regulation on the elimination of violations dated March 15, 2017 2502039, the deadline for which has expired. The purpose of the audit is the fulfillment by the audited person of the instruction dated March 15, 2017 2502039 of the Siberian Administration of Rostechnadzor
	# 00170701526171
	
Unscheduled inspection
	
Start date: 2017-04-10, end date: 2017-04-21, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Control over the execution of Regulation O251708 of 17032017 on the elimination of identified offenses, the deadline for which expires. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer and technical customer, including technical regulations and design documentationthe subject of this audit is to comply with regulation O251708 of 17032017 of the state construction supervision authority
	# 00170701388910
	
Unscheduled inspection
	
Start date: 2017-02-15, end date: 2017-03-17, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the reconstruction of the capital construction facility "Reconstruction of Installation 193" located at 1 Gubkin Ave., Omsk Region, based on the inspection program approved by and about the Deputy Head of the Siberian Directorate of Rostechnadzor dated 19042016 C2832016THE tasks of this inspection are prevention identification and suppression of violations of urban planning legislation committed by a person carrying out construction on the basis of a contract with a developer or a technical customer, including the requirements of technical regulations for project documentation. The subject of this audit is the compliance of the work performed and the construction materials used and the results during the reconstruction of the capital construction facility "Reconstruction of installation 193" as well as the results of such work with the requirements of technical regulations for project documentation. documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the need for a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
	# 00170701308789
	
Unscheduled inspection
	
Start date: 2017-01-23, end date: 2017-02-10, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Compliance by the audited person with the instruction dated October 31, 2016 2502203 of the Siberian Rostechnadzor Department
	# 55160701030800
	
Unscheduled inspection
	
Start date: 2016-10-13, end date: 2016-11-09, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: The purpose of ensuring the sanitary and epidemiological well-being of the population consumer rights protection and compliance with mandatory requirements for goods works services Tasks detection suppression of violations of the legislation of the Russian Federation in the field of sanitary and epidemiological well-being of the population consumer rights protection and compliance with mandatory requirements for goods works services Subject to the requirements of state control and supervision bodies
	# 55160700679566
	
Unscheduled inspection
	
Start date: 2016-10-03, end date: 2016-10-28, duration: —
	
Authority: Glavnoe upravlenie MCHS Rossii po Omskoi oblasti
	
Purpose of inspection: control over the execution of the order of the state control supervision and municipal control body order of the Ministry of Internal Affairs of the CAO of Omsk 5791120 dated 09112015, due on 01102016
	# 00160700397034
	
Unscheduled inspection
	
Start date: 2016-09-07, end date: 2016-10-03, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of the capital construction facility "Aviation Fuel Production of the Republic of Tatarstan" located at 1 Gubkin Ave., Omsk region
	# 00160700029170
	
Unscheduled inspection
	
Start date: 2016-08-17, end date: 2016-09-06, duration: —
	
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
	
Purpose of inspection: verification of the fulfillment of the previously issued instruction from 07062016 1417 on points 14
	# 24160601677745
	
Unscheduled inspection
	
Start date: 2016-06-06, end date: 2016-06-16, duration: —
	
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
	
Purpose of inspection: verification of the execution of regulation 120 of 130416
	# 24160601616391
	
Unscheduled inspection
	
Start date: 2016-05-04, end date: 2016-05-27, duration: —
	
Authority: Mezhregionalnoe upravlenie gosavtodornadzora po Krasnoyarskomu krayu Respublike Tyva i Respublike Hakasiya
	
Purpose of inspection: verification of the execution of regulation 119 of 130416
	# 55160601607824
	
Unscheduled inspection
	
Start date: 2016-05-11, end date: —, duration: —
	
Authority: —
	
Purpose of inspection: 
	# 55160601573974
	
Unscheduled inspection
	
Start date: 2016-04-07, end date: 2016-05-06, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: ensuring the sanitary and epidemiological well-being of the population, consumer rights protection and compliance with mandatory requirements for goods, works and services
	# 55160601529577
	
Unscheduled inspection
	
Start date: 2016-03-09, end date: 2016-04-05, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: Federal licensing control
	# 55150600662538
	
Unscheduled inspection
	
Start date: 2015-10-07, end date: —, duration: —
	
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Omskoi oblasti
	
Purpose of inspection: