Found 2 inspections:

# 002105315444
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-25, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: - monitoring the fulfillment by a legal entity or individual entrepreneur of the points of the instruction on the elimination of identified violations of mandatory requirements No. 5709/014-20/S dated March 17, 2020, previously issued by the state construction supervision authority. - the objectives of this audit are: verification of the elimination by a legal entity of the identified violation specified in the paragraphs of the prescription No. 5709/014-20/S dated March 17, 2020 7. The subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 002105315444
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-25, duration: 20
Authority: Severo-Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to: - monitoring the fulfillment by a legal entity or individual entrepreneur of the points of the instruction on the elimination of identified violations of mandatory requirements No. 5709/014-20/S dated March 17, 2020, previously issued by the state construction supervision authority. - the objectives of this audit are: verification of the elimination by a legal entity of the identified violation specified in the paragraphs of the prescription No. 5709/014-20/S dated March 17, 2020 7. The subject of this audit is (please note): compliance of the work performed and the construction materials used during the construction and reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a permit for construction; meeting the requirements established by parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.