# 00160601526728
Unscheduled inspection
Start date: 2016-03-17, end date: 2016-03-17, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka vypolneniya predpisaniya ot 20112015 PV6322069
# 362100363820
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the beginning of construction (reconstruction).
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is: compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100363806
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the beginning of construction (reconstruction).
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is: compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100363781
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the beginning of construction (reconstruction).
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is: compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100363792
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the beginning of construction (reconstruction).
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is: compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100371668
Unscheduled inspection
Start date: 2021-07-22, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This check is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed, reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction (reconstruction) of the capital construction facility.
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 772100258458
Unscheduled inspection
Start date: 2021-06-04, end date: 2021-06-15, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the verification of the fulfillment of the prescription; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction, reconstruction of capital construction facilities established by the rules of land use and development, documentation according to the layout of the territory, and the mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code and other federal laws
# 362100134134
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-22, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out a program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the start of construction.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of a contract with the developer or the technical customer.
The subject of this review is (please note): compliance with mandatory requirements or requirements established by municipal legal acts.
# 772100120219
Unscheduled inspection
Start date: 2021-04-07, end date: 2021-04-12, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 362100133058
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-04-28, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out a program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the start of construction.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of a contract with the developer or the technical customer.
The subject of this review is (please note): compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100134169
Unscheduled inspection
Start date: 2021-04-23, end date: 2021-04-28, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out a program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the start of construction.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of a contract with the developer or the technical customer.
The subject of this review is (please note): compliance with mandatory requirements or requirements established by municipal legal acts.
# 362100135877
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-09, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This check is carried out in order to verify the execution of a previously issued instruction on the elimination of identified violations.
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies
# 772100063174
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-04-09, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 362105345188
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362100038174
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362100033030
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-12, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility, developed on the basis of a notice of the beginning of construction (reconstruction).
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction (reconstruction) on the basis of an agreement with the developer or the technical customer.
The subject of this audit is: compliance with mandatory requirements or requirements established by municipal legal acts
# 362100032902
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105309378
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362005279886
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-30, duration: 13
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to assess the work performed and decide on the issuance of an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer technical customer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 362005279859
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-30, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to assess the work performed and decide on the issuance of an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer technical customer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 362005285992
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362005271039
Unscheduled inspection
Start date: 2020-12-10, end date: 2021-01-14, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Voronezhskoi oblasti
Purpose of inspection: kontrolya ispolneniya ranee vydannogo predpisaniya 8312 ot 20122019
# 362005271022
Unscheduled inspection
Start date: 2020-12-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362005182192
Unscheduled inspection
Start date: 2020-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362005182179
Unscheduled inspection
Start date: 2020-11-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362005182170
Unscheduled inspection
Start date: 2020-11-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 362005182158
Unscheduled inspection
Start date: 2020-11-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 362005204859
Unscheduled inspection
Start date: 2020-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362004477901
Unscheduled inspection
Start date: 2020-08-06, end date: 2020-08-19, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 362004477994
Unscheduled inspection
Start date: 2020-08-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 362004477963
Unscheduled inspection
Start date: 2020-08-11, end date: 2020-08-25, duration: 11
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 362004477951
Unscheduled inspection
Start date: 2020-08-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362004477975
Unscheduled inspection
Start date: 2020-08-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004464144
Unscheduled inspection
Start date: 2020-07-23, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004421482
Unscheduled inspection
Start date: 2020-06-01, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 362004371182
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-06-01, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 362004405846
Unscheduled inspection
Start date: 2020-04-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 362004397949
Unscheduled inspection
Start date: 2020-04-17, end date: 2020-04-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 362004389145
Unscheduled inspection
Start date: 2020-04-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 362004374647
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-04-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 362004374599
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-04-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 772004352049
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-04-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004348250
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 362004317743
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection:
# 362004278985
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-02-20, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Voronezhskoi oblasti
Purpose of inspection: proverki faktov izlozhennyh v zayavlenii obraschenii registracionnyi 16434zh2019 ot 19122019 728ZH2020 ot 29012020 motivirovannoe predstavlenie Upravleniya Rospotrebnadzora po Voronezhskoi oblasti ot 06022020 zadachami nastoyaschei proverki yavlyayutsya proverka faktov izlozhennyh v obrascheniyah potrebitelya v chasti ne predostavlenie informacii o proektnoi deklaracii zhilogo kompleksa «ULTRA» srok nachala peredachi i prinyatiya obekta dolevogo stroitelstva mashinomesta rassmotrenie dokumentov predstavlennyh individualnym predprinimatelem
# 362004162594
Unscheduled inspection
Start date: 2020-01-23, end date: 2020-02-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu rassrassmotreniya informacii poluchennoi ot 16 batalona DPS 2 polka DPS gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya GUMVD Rossii po Moskovskoi oblasti
# 361904016365
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: proverka provoditsya
# 361904016369
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: proverka provoditsya
# 361904016367
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: proverka provoditsya
# 771904043522
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 361904070752
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to assess the work performed and decide on the issuance of an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer technical customer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361904070415
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to assess the work performed and decide on the issuance of an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer technical customer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361904070319
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to assess the work performed and decide on the issuance of an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer technical customer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361904016360
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: proverka provoditsya
# 771904156178
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-01-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 361904001930
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361904001905
Unscheduled inspection
Start date: 2019-11-22, end date: 2019-12-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361903407220
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361903407806
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 361903949478
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361903949536
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 361903949330
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 361903949288
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 771903959602
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903821545
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 361903407612
Unscheduled inspection
Start date: 2019-10-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903643259
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361902962640
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902926503
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu rassmotreniya obrascheniya 3673673919OB ot 18072019
# 361902881202
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 77190803455319
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-08-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 361902855918
Unscheduled inspection
Start date: 2019-07-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 361902855900
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902855856
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Rassmotret dokumenty yuridicheskogo lica i inuyu informaciyu o ego deyatelnosti Osmotret i obsledovat ispolzuemye yuridicheskim licom pri osuschestvlenii deyatelnosti proizvodstvennye obekty
# 361902855836
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902855876
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902855941
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902847860
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The subject of this audit is note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 361902730034
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902730031
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 361902814790
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803432465
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 361902785910
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is conducted in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of the law committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer on urban planning activities, including the requirements of project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902721985
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer is compliance with mandatory requirements or requirements established by municipal legal acts
# 361902642156
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: programma proverok razrabatyvaemaya organom gosudarstvennogo stroitelnogo nadzora
# 361902642115
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 361902642021
Unscheduled inspection
Start date: 2019-04-30, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 361902607413
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361902605735
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 361902607821
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 361902642077
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction reconstruction The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including the requirements of project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 361902505060
Unscheduled inspection
Start date: 2019-03-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 77190803379124
Unscheduled inspection
Start date: 2019-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361902597579
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-04-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and decide whether to issue an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation based on the notice of completion of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer legislation on urban planning activities, including the requirements of the project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 77190803328473
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803291118
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 361802219011
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer violations of legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361802218979
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of the design documentation on the basis of a notice of completion of construction reconstruction of the capital construction facility The objectives of this inspection are to prevent identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical customer violations of legislation on urban planning activities, including the requirements of project documentation, The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361802214001
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361802137490
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 001802290744
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-19, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ispolneniya predpisaniya vydannogo VerhneDonskim upravleniem Rostehnadzora ot 20092018 PV6313765 s predvaritelnym izvescheniem o vremeni i meste provedeniya proverki OOO Specializirovannyi zastroischik «VYBOR»
# 361802153676
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts, compliance with the instructions of state control bodies, supervision bodies of municipal control
# 361802019118
Unscheduled inspection
Start date: 2018-11-21, end date: 2018-11-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361802130299
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361801242311
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-11-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361801827612
Unscheduled inspection
Start date: 2018-10-10, end date: 2018-10-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoeprovedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinogo fonda Rossiiskoi Federacii v tom chisle unikalnym dokumentam Arhivnogo fonda Rossiiskoi Federacii dokumentam imeyuschim osoboe istoricheskoe nauchnoe kulturnoe znachenie vhodyaschim v sostav nacionalnogo bibliotechnogo fonda
# 361801905357
Unscheduled inspection
Start date: 2018-10-16, end date: 2018-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including the requirements of the project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 001800681495
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-20, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ispolneniya predpisaniya vydannogo VerhneDonskim upravleniem Rostehnadzora ot 29062017 PV6312716 s predvaritelnym izvescheniem o vremeni i meste provedeniya proverki OOO Specializirovannyi zastroischik «VYBOR»
# 361801715712
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 09072018 68101286 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 2 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361801715692
Unscheduled inspection
Start date: 2018-09-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 361801715677
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 09072018 68101284 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 2 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361801716888
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 09072018 68101283 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 2 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami 3
# 361801716791
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 03022017 6810252 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361801716899
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 21052018 6810942 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 2 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami 3
# 361801717015
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-10-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 12092017 68102160 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 2 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami 3
# 77180803239365
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 361801590561
Unscheduled inspection
Start date: 2018-09-20, end date: 2018-10-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 23072018 g 75 srok dlya ispolneniya kotorogo istek zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovaniyam proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 361800639214
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO SZ Vybor ot 07082018 68101624 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800607997
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-09-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361800669329
Unscheduled inspection
Start date: 2018-08-24, end date: 2018-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Statya 54 Gradostroitelnogo kodeksa Rossiiskoi Federacii Federalnyi zakon ot 26122008g 294FZ «O zaschite prav yuridicheskih lic i individualnyh predprinimatelei pri osuschestvlenii gosudarstvennogo kontrolya nadzora i municipalnogo kontrolya» Postanovlenie Pravitelstva RF ot 01022006g 54 «O gosudarstvennom stroitelnom nadzore v Rossiiskoi Federacii» Prikaz Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru ot 26 dekabrya 2006 g 1129 «Ob utverzhdenii i vvedenii v deistvie poryadka provedeniya proverok pri osuschestvlenii gosudarstvennogo stroitelnogo nadzora i vydachi zaklyuchenii o sootvetstvii postroennyh rekonstruirovannyh otremontirovannyh obektov kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov proektnoi dokumentacii»
# 361800541356
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress the technical customer allowed by the developer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer of violations of the legislation on urban planning activities, including technical regulations and design documentation assessment of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361800532997
Unscheduled inspection
Start date: 2018-07-10, end date: 2018-07-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 23052016 6810452 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 77180803179413
Unscheduled inspection
Start date: 2018-07-13, end date: 2018-07-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803175954
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 361800568146
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of the capital construction facility The objectives of this inspection are to prevent identify and suppress the technical customer allowed by the developer as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer of violations of the legislation on urban planning activities, including technical regulations and design documentation assessment of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361800573112
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-08-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO SZ Vybor ot 12072018 68101356 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 001800502894
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-29, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ispolneniya prikaza rukovoditelya Rostehnadzora ot 15032017 85 «O proverkah organizacii ekspluatiruyuschih bashennye krany» izdannogo v sootvetstvii s porucheniem Zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii AG Hloponina ot 08022017 AHP9682 «Ob organizacii i provedenii v period s 2017 po 2019 god vneplanovyh proverok organizacii ekspluatiruyuschih bashennye krany» Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii obyazatelnyh trebovanii ustanovlennyh Federalnymi zakonami i inymi normativnymi aktami Rossiiskoi Federacii v oblasti promyshlennoi bezopasnosti i tehnicheskogo regulirovaniya obyazatelnyh trebovanii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie yuridicheskim licom v processe osuschestvleniya deyatelnosti obyazatelnyh trebovanii promyshlennoi bezopasnosti pri proektirovanii stroitelstve ekspluatacii konservacii i likvidacii opasnyh proizvodstvennyh obektov izgotovlenii montazhe naladke obsluzhivanii i remonte tehnicheskih ustroistv gruzopodemnyh kranov primenyaemyh na opasnyh proizvodstvennyh obektah sootvetstvie ukazannym trebovaniyam ispolzuemyh zdanii pomeschenii sooruzhenii oborudovaniya i materialov a takzhe trebovanii v otnoshenii mashin i oborudovaniya i svyazannyh s trebovaniyami k etoi produkcii processov ekspluatacii i utilizacii
# 77180803152759
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803136851
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803139071
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 361800377026
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 30032018 g 5 srok dlya ispolneniya kotorogo istek zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe vypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 361800265483
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 02022018 6810193 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800265115
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 12092017 68102159 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800265081
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 21112016 68102396 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800264778
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 18102016 68102051 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800265167
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 11112016 68102331 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800265142
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO SZ Vybor ot 27122016 68102758 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800228829
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.
# 361800305233
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-05-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 361800223275
Unscheduled inspection
Start date: 2018-03-20, end date: 2018-03-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 26022015 6810315 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 361800167969
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 25032016 6810452 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 77180803082076
Unscheduled inspection
Start date: 2018-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803071364
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 36170802958714
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170802959523
Unscheduled inspection
Start date: 2017-12-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 77170802927970
Unscheduled inspection
Start date: 2017-12-01, end date: 2017-12-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 36170802883538
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170802871861
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-11-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of a capital construction facility. The tasks of this inspection are the prevention identification and suppression of violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of legislation on urban planning activities, including technical regulations and design documentation assessment of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170802447800
Unscheduled inspection
Start date: 2017-10-09, end date: 2017-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170802745877
Unscheduled inspection
Start date: 2017-10-23, end date: 2017-11-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 13072017 68101624zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 77170802760982
Unscheduled inspection
Start date: 2017-10-18, end date: 2017-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 36170802700512
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170802700434
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO vybor ot21112016 68102396zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802700511
Unscheduled inspection
Start date: 2017-10-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170802700477
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 11112016 68102331zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802700451
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 18102016 68102051zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802233664
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of a capital construction facility. The tasks of this inspection are the prevention identification and suppression of violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of legislation on urban planning activities, including technical regulations and design documentation assessment of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170802096098
Unscheduled inspection
Start date: 2017-09-06, end date: 2017-09-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of a capital construction facility. The tasks of this inspection are prevention identification and suppression of violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of legislation on urban development activities, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 77170801972165
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170802588565
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 10082016 68101626zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802588135
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO Vybor ot 19092017 68102175zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802587111
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-10-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO Vybor ot 15092017 68102176zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170802529764
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-10-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of construction of a capital construction facility. The tasks of this inspection are prevention identification and suppression of violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of legislation on urban development activities, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170701803166
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170701709176
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-07-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki ispolneniya ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 24042017 g 36 srok dlya ispolneniya kotorogo istekzadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktamisootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyamsootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursahvypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolya
# 36170701709166
Unscheduled inspection
Start date: 2017-07-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 77170701790132
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 36170701778859
Unscheduled inspection
Start date: 2017-07-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170701703590
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-07-03, duration: —
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: cel rassmotreniya obrascheniya rabotnika o narushenii trudovyh prav vh 7181117OB ot 02062017 zadachi obespechenie soblyudeniya i zaschity trudovyh prav i svobod grazhdan vklyuchaya pravo na bezopasnye usloviya truda obespechenie soblyudeniya rabotodatelyami trudovogo zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava
# 36170701687042
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of the capital construction facility. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of the legislation on urban development activities, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170701687074
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-06-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of the capital construction facility. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer of violations of the legislation on urban development activities, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170701674909
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170701601461
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO Vybor ot 28042017 6810948zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701608430
Unscheduled inspection
Start date: 2017-05-12, end date: 2017-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 25032016 6810452zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701659599
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170701659726
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot OOO Vybor ot 19052017 68101140zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii7Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701472823
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 31082016 68101750zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701472792
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 27092016 68101913 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701472866
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 10082016 68101626 zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoe soblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701472695
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-04-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 26022015 6810315zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701528908
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 11112016 68102331zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii8Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701528883
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 18102016 68102051zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701528811
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 25112015 68102477zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701528792
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 03022017 6810252zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701472848
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 18102016 68102050zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701428646
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva upravleniya stroitelnoi politiki adminitsracii gorodskogo okruga gorod Voronezh ot 19092016 68101846zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii8Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktamisootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyamsootvetstvie svedenii soderzhaschihsya v zayavlenii i dokumentah yuridicheskogo lica ili individualnogo predprinimatelya o predostavlenii pravovogo statusa specialnogo razresheniya licenzii na pravo osuschestvleniya otdelnyh vidov deyatelnosti ili razresheniya soglasovaniya na osuschestvlenie inyh yuridicheski znachimyh deistvii esli provedenie sootvetstvuyuschei vneplanovoi proverki yuridicheskogo lica individualnogo predprinimatelya predusmotreno pravilami predostavleniya pravovogo statusa specialnogo razresheniya licenzii vydachi razresheniya soglasovaniya obyazatelnym trebovaniyam a takzhe dannym ob ukazannyh yuridicheskih licah i individualnyh predprinimatelyah soderzhaschimsya v edinom gosudarstvennom reestre yuridicheskih lic edinom gosudarstvennom reestre individualnyh predprinimatelei i drugih federalnyh informacionnyh resursahvypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolyaprovedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei srede obektam kulturnogo naslediya pamyatnikam istorii i kultury narodov Rossiiskoi Federacii muzeinym predmetam i muzeinym kollekciyam vklyuchennym v sostav Muzeinog
# 36170701475836
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-04-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts
# 36170701325050
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-03-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Article 54 of the Urban Planning Code of the Russian Federationfederal Law No. 294 FZ dated 26122008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control"Decree of the Government of the Russian Federation No. 54 dated 0102200 "On State Construction Supervision in the Russian Federation"Order No. 1129 of the Federal Service for Environmental, Technological and Nuclear Supervision dated December 26, 2006 "On Approval and Enactment of the Procedure for Conducting Inspections during State Construction Supervision and Issuing Conclusions on the Compliance of Constructed Reconstructed Repaired Capital Construction Facilities with the Requirements of Technical Regulations, Norms and Rules of Other Regulatory Legal Acts of Project Documentation"This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 36170701325027
Unscheduled inspection
Start date: 2017-02-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170701378790
Unscheduled inspection
Start date: 2017-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36170701379120
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 19092016 68101849zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii8Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701378890
Unscheduled inspection
Start date: 2017-02-10, end date: 2017-02-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 27122016 68012759zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii8Predmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701378902
Unscheduled inspection
Start date: 2017-02-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36170701325209
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Article 54 of the Urban Planning Code of the Russian Federationfederal Law No. 294 FZ dated 26122008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control"Decree of the Government of the Russian Federation No. 54 dated 0102200 "On State Construction Supervision in the Russian Federation"Order No. 1129 of the Federal Service for Environmental, Technological and Nuclear Supervision dated December 26, 2006 "On Approval and Enactment of the Procedure for Conducting Inspections during State Construction Supervision and Issuing Conclusions on the Compliance of Constructed Reconstructed Repaired Capital Construction Facilities with the Requirements of Technical Regulations, Norms and Rules of Other Regulatory Legal Acts of Project Documentation"This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 36170701325198
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Article 54 of the Urban Planning Code of the Russian Federationfederal Law No. 294 FZ dated 26122008 "On the Protection of the Rights of Legal Entities and Individual Entrepreneurs in the Exercise of State Control, Supervision and Municipal Control"Decree of the Government of the Russian Federation No. 54 dated 0102200 "On State Construction Supervision in the Russian Federation"Order No. 1129 of the Federal Service for Environmental, Technological and Nuclear Supervision dated December 26, 2006 "On Approval and Enactment of the Procedure for Conducting Inspections during State Construction Supervision and Issuing Conclusions on the Compliance of Constructed Reconstructed Repaired Capital Construction Facilities with the Requirements of Technical Regulations, Norms and Rules of Other Regulatory Legal Acts of Project Documentation"This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts
# 36170701339585
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 27122016 68102760zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya otmetit nuzhnoesoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktami
# 36170701339551
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160701161896
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7. inspections are the observance of mandatory requirements or requirements established by municipal legal acts and the compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals and plants, the environment, the prevention of natural and man-made emergencies, the security of the State, and the elimination of the consequences of such harm
# 36160701161890
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7. inspections are the observance of mandatory requirements or requirements established by municipal legal acts and the compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals and plants, the environment, the prevention of natural and man-made emergencies, the security of the State, and the elimination of the consequences of such harm
# 36160701225913
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is the observance of mandatory requirements or requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevention of emergency situations of natural and man-made character, ensuring the safety of the state and eliminating the consequences of causing such harm
# 36160701161894
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: Statya 54 Gradostroitelnogo kodeksa Rossiiskoi FederaciiFederalnyi zakon ot 26122008g 294FZ «O zaschite prav yuridicheskih lic i individualnyh predprinimatelei pri osuschestvlenii gosudarstvennogo kontrolya nadzora i municipalnogo kontrolya» Postanovlenie Pravitelstva RF ot 01022006g 54 «O gosudarstvennom stroitelnom nadzore v Rossiiskoi Federacii»Prikaz Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru ot 26 dekabrya 2006 g 1129 «Ob utverzhdenii i vvedenii v deistvie poryadka provedeniya proverok pri osuschestvlenii gosudarstvennogo stroitelnogo nadzora i vydachi zaklyuchenii o sootvetstvii postroennyh rekonstruirovannyh otremontirovannyh obektov kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov proektnoi dokumentacii»
# 36160701161893
Unscheduled inspection
Start date: 2016-12-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160701161889
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation7. inspections are the observance of mandatory requirements or requirements established by municipal legal acts and the compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals and plants, the environment, the prevention of natural and man-made emergencies, the security of the State, and the elimination of the consequences of such harm
# 36160701161884
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsyasoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktamisootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyamvypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolyaprovedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei sredepo preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo harakterapo obespecheniyu bezopasnosti gosudarstvapo likvidacii posledstvii prichineniya takogo vreda
# 36160701109253
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160701109230
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160701155198
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation on the basis of a notice of completion of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations committed by the developer by the technical customer as well as by the person carrying out construction reconstruction on the basis of an agreement with the developer or technical the customer violated the legislation on urban planning activities, including technical regulations and design documentation, assessment of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation
# 36160701155173
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36160701092374
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation based on a notice of completion of the capital construction facility. The objectives of this inspection are to prevent identify and suppress technical violations committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical the customer's violations of legislation on urban planning activities, including technical regulations and project documentation, issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and project documentation, or a decision to refuse to issue an opinion.7 The subject of this audit is to comply with mandatory requirements or requirements established by municipal legal acts and the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements. prescriptions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevent the occurrence of emergency situations of a natural and man-made nature, ensure the safety of the State, and eliminate the consequences of causing such harm
# 36160701092358
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation based on a notice of completion of the capital construction facility. The objectives of this inspection are to prevent identify and suppress technical violations committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical the customer's violations of legislation on urban planning activities, including technical regulations and project documentation, issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and project documentation, or a decision to refuse to issue an opinion.7 The subject of this audit is to comply with mandatory requirements or requirements established by municipal legal acts and the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements. prescriptions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevent the occurrence of emergency situations of a natural and man-made nature, ensure the safety of the State, and eliminate the consequences of causing such harm
# 36160701044705
Unscheduled inspection
Start date: 2016-11-03, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is the observance of mandatory requirements or requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevention of emergency situations of natural and man-made character, ensuring the safety of the state and eliminating the consequences of causing such harm
# 36160601789765
Unscheduled inspection
Start date: 2016-10-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160601789733
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: The inspection is carried out in order to carry out a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The subject of this inspection It is the observance of mandatory requirements or requirements established by municipal legal acts and the compliance of information contained in the notification of the commencement of certain types of business activities with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals and plants, the environment, the prevention of natural and man-made emergencies, the security of the State, and the elimination of the consequences of such harm
# 36160701040779
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This inspection is carried out in order to evaluate the work performed and make a decision on issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and design documentation based on a notice of completion of the capital construction facility. The objectives of this inspection are to prevent identify and suppress technical violations committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical the customer's violations of legislation on urban planning activities, including technical regulations and project documentation, issuing an opinion on the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations and project documentation, or a decision to refuse to issue an opinion.7 The subject of this audit is to comply with mandatory requirements or requirements established by municipal legal acts and the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements. prescriptions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevent the occurrence of emergency situations of a natural and man-made nature, ensure the safety of the State, and eliminate the consequences of causing such harm
# 36160700854289
Unscheduled inspection
Start date: 2016-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36160700128564
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36160700788957
Unscheduled inspection
Start date: 2016-09-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160700789057
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is the observance of mandatory requirements or requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevention of emergency situations of natural and man-made character, ensuring the safety of the state and eliminating the consequences of causing such harm
# 36160700788937
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is the observance of mandatory requirements or requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevention of emergency situations of natural and man-made character, ensuring the safety of the state and eliminating the consequences of causing such harm
# 36160700789041
Unscheduled inspection
Start date: 2016-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 36160700838246
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160700838347
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-10-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: proverka provoditsya s celyu ocenki vypolnennyh rabot i prinyatiya resheniya o vydache zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii izvescheniya ob okonchanii stroitelstva obekta kapitalnogo stroitelstva zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii vydacha zaklyucheniya o sootvetstvii postroennogo rekonstruirovannogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii ili reshenie ob otkaze v vydache zaklyucheniya Predmetom nastoyaschei proverki yavlyaetsyasoblyudenie obyazatelnyh trebovanii ili trebovanii ustanovlennyh municipalnymi pravovymi aktamisootvetstvie svedenii soderzhaschihsya v uvedomlenii o nachale osuschestvleniya otdelnyh vidov predprinimatelskoi deyatelnosti obyazatelnym trebovaniyamvypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora organov municipalnogo kontrolyaprovedenie meropriyatii po predotvrascheniyu prichineniya vreda zhizni zdorovyu grazhdan vreda zhivotnym rasteniyam okruzhayuschei sredepo preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo harakterapo obespecheniyu bezopasnosti gosudarstvapo likvidacii posledstvii prichineniya takogo vreda
# 36160700114134
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-10-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: This audit is carried out in order to implement the program of inspections during the construction of a capital construction facility developed on the basis of a notice of the beginning of construction. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction reconstruction on the basis of an agreement with the developer or the technical customer. The verification is compliance with mandatory requirements or requirements established by municipal legal acts
# 36160700082884
Unscheduled inspection
Start date: 2016-08-29, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection:
# 36160700059030
Unscheduled inspection
Start date: 2016-08-18, end date: 2016-08-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu vypolneniya programmy provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva razrabotannoi na osnovanii izvescheniya o nachale stroitelstva OOO Vybor ot 27052016 68101035zadachami nastoyaschei proverki yavlyayutsyapreduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii
# 36160601728478
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-08-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Voronezhskoi oblasti
Purpose of inspection: The inspection is carried out in order to carry out a program of inspections during the construction of a capital construction facility developed on the basis of a notice of the start of construction. The objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as the person carrying out construction and reconstruction on the basis of a contract with the developer or the technical customer, including technical regulations and project documentation. The purpose of this inspection is to comply with mandatory requirements or requirements established by municipal legal acts, compliance with the information contained in the notification of the commencement of certain types of business activities, mandatory requirements, compliance with the instructions of state control bodies, supervision of municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, prevention of natural and man-made emergencies, ensuring the safety of the State, and eliminating the consequences of such harm
# 00160601526728
Unscheduled inspection
Start date: 2016-03-17, end date: 2016-03-17, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka vypolneniya predpisaniya ot 20112015 PV6322069
# 36150601432613
Unscheduled inspection
Start date: 2015-10-05, end date: 2015-10-16, duration: —
Authority: Gosudarstvennaya inspekciya truda v Voronezhskoi oblasti
Purpose of inspection: Consideration of an employee's appeal about an employer's violation of his labor rights