# 741904034261
Unscheduled inspection
Start date: 2019-12-06, end date: 2020-01-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903856825
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of switches 19 2 sets 17 1 set laying of track P50 P65 ballasting straightening of the track after completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resource2 The availability of a building permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903523291
Unscheduled inspection
Start date: 2019-09-19, end date: 2019-09-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work performance cutting and removing soil planning and compaction of the earthbed laying non-woven fabric geotextile installation of a grease trap development of trenches for laying pipe filters laying pipe filters strengthening slopes disassembly of the track P50 P65 disassembly of switches 19 9 11 after completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work project documentation2 Availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation