Found 7 inspections:

# 74170802986817
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802837664
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po razbivke osei kapitalnogo stroitelstva montazhu podzemnogo gazoprovoda iz PE trub montazhu podzemnogo gazoprovoda iz stalnyh trub svarke vyhodov iz zemli ustroistvu izolyacionnogo pokrytiya na vyhodah GNB cherez dorogu ustroistvu fundamentov pod PGB montazhu PGB elektrosnabzheniyu PGB i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802763438
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka vypolneniya predpisaniya ot 02102017 g so srokom ispolneniya do 20102017 g2Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802582809
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of an underground low-pressure gas pipeline, the installation of an above-ground gas pipeline and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802582806
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701866869
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the gas pipeline to the installation of an underground gas pipeline of 1500 m, the installation of the foundation for the PHB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 art. 52 of the Urban Planning Code of the Russian Federation


# 74170701883271
Unscheduled inspection
Start date: 2017-08-23, end date: 2017-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the axes of the capital construction facility installation of an underground low-pressure gas pipeline installation of an above-ground gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.