Found 166 inspections:

# 282005146410
Unscheduled inspection
Start date: 2020-09-30, end date: 2020-10-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program approved on 1708-2020the objectives of this inspection are to prevent identify and suppress violations committed by the developer, the technical customer, and the person carrying out the construction of violations of compliance with the work performed during the construction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The purpose of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 002004476332
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-29, duration: 20
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the facts of violations of industrial safety requirements during the operation of a hazardous production facility "Gas supply Network, including inter-settlement Kamchatka Territory" registration A71001650097 owned by Gazprom Gazoraspredenie Far East JSC, indicated in the request of a citizen of the Russian Federation Polyakov MA entry from 25052020 3731104the subject of this audit is compliance with Gazprom Gazoraspredenie Far East JSC mandatory industrial safety requirements


# 002004386159
Unscheduled inspection
Start date: 2020-04-02, end date: —, duration:
Authority:
Purpose of inspection:


# 002004391415
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration:
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 002004250109
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 20092019 052518590201


# 001903985135
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the implementation of paragraphs 5 6 7 8 of the previously issued order dated 21092018 PA718770403, which expired on 01102019the purpose of this inspection is to verify that the legal entity has eliminated the violations identified


# 001903896230
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation The task is to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or technical customer, hereinafter referred to as the contractor. the state construction supervision is to check1 the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a construction permit to meet the requirements set out in Parts 2 3 and 3_1 Articles 52 of the Urban Planning Code of the Russian Federation


# 001902986133
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations of 17062019 052518440101


# 001903657513
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: taloudellinen Federal state construction supervision within the competence of Rostekhnadzor in the construction, reconstruction of all the objects referred to in paragraph 51 of article 6 of the town planning code of the Russian Federation on the basis of the notification of completion from 04092019 3 BX 11217 from 05092019 about than twenty-four hours before beginning to notify the legal entity in any way allows you to control receiving notification adrenalised of this review is to prevent detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer hereinafter called the contractor violations of the legislation on town-planning activities including technical regulations and project documentlibrary proverbiality perform work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices used energy resourcevalue permissions stroitelstvoimoti the requirements set forth in parts 2 and 3 of article 52 3_1


# 001902986165
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 001902633084
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection:


# 001902489721
Unscheduled inspection
Start date: 2019-02-06, end date: 2019-03-05, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of compliance by the business entity Gazprom Gas Distribution Far East JSC with the regulations dated 27092018 0802120182 on the elimination of violations of legislation in the field of production and consumption waste management


# 001802088341
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-29, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 001802088353
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-11-30, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision body


# 001800097957
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations dated 31102017 PA711161 paragraphs 4781011, the execution of which expires on 31.012018


# 001800036407
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration:
Authority:
Purpose of inspection:


# 001800396322
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-02-01, duration:
Authority: Ministerstvo finansov Rossiiskoi Federacii
Purpose of inspection: verification of the elimination of identified violations during the scheduled inspection verification of the execution of the instruction on the elimination of violations


# 00170802941114
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of paragraphs 1 2 3 of the regulations of the Far Eastern Directorate of Rostechnadzor dated 28072017 PA71641 of Gazprom Gas Distribution Far East JSC paragraphs 1 2 3, the deadline for which expired on 30102017


# 00170802771046
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulation from 120720127 PA71641GS


# 00170802771513
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-02, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the regulation of the Far Eastern Administration of Rostechnadzor


# 00170802026206
Unscheduled inspection
Start date: 2017-09-19, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802028718
Unscheduled inspection
Start date: 2017-09-26, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802026376
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the legal entity's compliance with the order


# 00170802026443
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170802026283
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the legal entity's compliance with the order


# 00170701633019
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution of the points of the prescription


# 00170701598523
Unscheduled inspection
Start date: 2017-05-16, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170701598511
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-11, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 00170701598496
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-12, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision body


# 00170701338794
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338784
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-03, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338772
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-01, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the fulfillment of an early issued instruction on the elimination of identified violations


# 00160701224965
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of Gazprom Gas Distribution Far East JSC paragraph 5 of the regulation of the Far Eastern Directorate of Rostechnadzor dated 150632016 PR714230406, which expired on 15112016


# 00160700891416
Unscheduled inspection
Start date: 2016-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 00160601727698
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of an earlier issued prescription


# 00160601727717
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Consideration of documents of a legal entity


# 00160601786901
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-18, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of Gazprom Gas Distribution Far East JSC paragraphs 2 to 3 of the regulation of the Far Eastern Directorate of Rostechnadzor dated 15062016 PR714230406, which expires on 15082016


# 00160601662912
Unscheduled inspection
Start date: 2016-06-10, end date: 2016-06-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the legal entity's compliance with paragraph 2 of Regulation No. 05052015 PA713851, which expired on 05052016


# 00160601497712
Unscheduled inspection
Start date: 2016-02-25, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of 4 points issued to a legal entity 2 prescriptions from 05052015 with a deadline of 05/12/2015 postponement of the deadline to 31/122015 PA713854 p6 p7 PA713855 p6 p7p6 prescription PA713854 Reservoir installation 4 not fulfilled There is no action plan for the localization and elimination of the consequences of accidents at the OPO PLA A single PLA for 15 OPO in Khabarovsk and Khabarovsk region is not properly coordinated Postponement of the deadline for completion order PA7196 from 26022016 to 26062016p7 order PA713854 Reservoir installation 4 not completed The plan does not contain a description of the OPO for which an accident characteristic has been developed specific to this facility Postponement of the deadline for completion order PA7196 from 26022016 to 26062016p6 order PA713855 Reservoir installation 7 not fulfilled There is no action plan for localization and elimination of consequences of accidents at the OPO PLA A single plan is presented by 15 OPO in Khabarovsk and the Khabarovsk region has not been properly agreed upon Postponement of the deadline for execution order PA7196 from 26022016 to 26062016p7 order PA713855 Reservoir installation 7 has not been completed The bill does not contain a description of the OPO for which an accident characteristic has been developed specific to this facility Postponement of the deadline order PA7196 from 26022016 to 26062016


# 00150601410645
Unscheduled inspection
Start date: 2015-12-28, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the prescription issued to the legal entity from 22052015 PA71489, the deadline for which, based on the letter from 06072015 ex 04345093, was postponed to 05112015the identification of objects in the OPO tank installation 24 p Pereyaslavka and tank installation 25 p Choir was carried out incorrectly.


# 00150601317268
Unscheduled inspection
Start date: 2015-11-11, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the instruction issued to the legal entity from 29092014 040254PV p2 p4 p5p2the certification protocols for the working staff are not properly executed 4the technical devices used at the facility are operated beyond the designated resource without diagnostics 5the schedule for the repair of buildings and structures is not presented. The walls of the production premises are in unsatisfactory condition


# 00150601317279
Unscheduled inspection
Start date: 2015-11-23, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of orders previously issued to a legal entity from 13102014 040257PV p3 p4 with a deadline of 13102015 from 17092015 10651008140 p1 from 18092015 10601008150 p1 from 19092015 10801008160 p1 with a deadline of 01102015


# 00150601317211
Unscheduled inspection
Start date: 2015-11-24, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with 11 points issued to a legal entity prescriptions from 05052015 with a runtime of up to 05112015 ПА713851 ПА713853 P3 P1 P3 P4 P7 ПА713854 P1 P2 P5 P1 P4 ПА713855 п5п2 ПА713851 Vypolnennoe gas analyzers control mixtures in the premises of the STS is the control mixtures with a concentration of more than 10 НКПРп1 ПА713853 of Vypolneno the information to the card account during the registration OPO part of the OPO 39 provided the GRU with the vessels in the number of 78 units for 42 kubm 190т that does not match the actual data In the presence of OPO 37 GRU 164 сосуда3444т СУГп3 ПА713853 Vypolnennoe held on 05042015 timely technical inspection GRU 19 ul Craft 23 16042015 GRU 12 ul Craft 12п4 ПА713853 Not vypolnennoe conducted on a timely 26042015 technical diagnostics of 6 vessels GRU 128 street Kubiak 18п7 ПА713853 of Vypolneno viewed 20 GRU from 37 takes place unsatisfactory colouring of the facade of gas valves pressure reducing heads GRU 16 17 128 111 114 115 116 118п1 ПА713854 of Vypolneno the information to the card account during the registration OPO part of the OPO includes 18 GRU 35 vessels for 42 kubm number СУГ90т that does not match the actual data In the presence of OPO 10 GRU 35 сосудов735 t СУГп2 ПА713854 not vypolnennoe submitted project documentation and examination of design documentation for the elimination of 8 GRU part of the OPO GRU 237 238 239 240 242 243 249 251п5 ПА713854 not vypolnennoe presents confirmation of the admission staff OPO no contraindications to the clerks of the periodic medical examination of staff OPO 1 4 7п1 ПА713855 of Vypolneno the information to the card account during the registration OPO part of the OPO provided 39 GRU 78 vessels 42кубм number СУГ190т that does not match the actual data In the presence of 38 GRU 118 сосудов248т СУГп4 ПА713855 of Vypolneno viewed 7 of 38 GRU takes place unsatisfactory colouring of the facade pipelines GRU 422 41 42п5 ПА713855 Not vypolnennoe presents confirmation of the admission staff OPO no contraindications to the clerks of the periodic medical examination


# 282101318515
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration:
Authority:
Purpose of inspection:


# 282101318411
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 282101469923
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: Execution of the inspection program approved on 07/11/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out construction of compliance with the requirements of the capital construction facility performed during construction, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 282100339854
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 282100238344
Unscheduled inspection
Start date: 2021-05-28, end date: 2021-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources


# 282100238349
Unscheduled inspection
Start date: 2021-05-28, end date: 2021-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: execution of the inspection program, verification of compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources


# 652100288604
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that: this inspection is carried out in order to monitor the fulfillment by the legal entity JSC "GGR DV" of the previously issued order dated July 23, 2020 No. P-380-100- o/1, the deadline for elimination expired on 08/30/2021. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this review is (please note): compliance with the regulations of the state control (supervision) bodies;


# 652100288561
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that: this inspection is carried out in order to monitor the fulfillment by the legal entity JSC "GGR DV" of the previously issued order dated November 27, 2020 No. P-380-242- o/1, the deadline for elimination expired 02.02.2021 The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this review is (please note): compliance with the regulations of the state control (supervision) bodies;


# 652100288254
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that: this inspection is carried out in order to monitor the fulfillment by the legal entity JSC "GGR DV" of the previously issued order dated March 27, 2020 No. P-380-40- o/1, the deadline for elimination expired on 05/13/2021. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this review is (please note): compliance with the regulations of the state control (supervision) bodies;


# 652100288293
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 20
Authority: Sahalinskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6. To establish that: this inspection is carried out in order to monitor the fulfillment by the legal entity JSC "GGR DV" of the previously issued order dated January 27, 2020 No. P-380-388/1, the deadline for elimination expired on 03/30/2021, 05/13/2021. The purpose of this audit is to prevent, identify and suppress violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this review is (please note): compliance with the regulations of the state control (supervision) bodies;


# 272100127319
Unscheduled inspection
Start date: 2021-04-02, end date: —, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 282100068672
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this check is being conducted in order to: - execution of the inspection program approved on 08/17/2020 The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 282100068643
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection: To establish that this check is being conducted in order to: - execution of the inspection program approved on 08/17/2020 The objectives of this audit are: prevention, detection and suppression of violations committed by the developer, the technical customer, the person carrying out the construction of violations of compliance with the requirements of the capital construction project performed during the construction process, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 272100121393
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-27, duration: 20
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: The purpose of the verification with the details of the foundation documents The inspection is carried out in order to carry out regional state housing supervision on applications registered under the numbers U27-05-4204 dated March 23, 2021, U27-05-4202 dated March 23, 2021. Verification tasks Prevention and suppression of violations of citizens' housing rights and legal requirements, compliance with mandatory legal requirements in the field of housing relations Subject of verification Compliance with mandatory requirements for the provision of public utilities to owners and users of premises in apartment buildings and residential buildings


# 272100103915
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-26, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Habarovskomu krayu
Purpose of inspection: purpose:control of the execution of the regulation dated 11/21/2019 : subject:compliance with the instructions of state control (supervision) bodies, municipal control bodies; tasks: review and analysis of submitted documents on the execution of the official's instructions dated 11/21/20219, visual control


# 272100061774
Unscheduled inspection
Start date: 2021-01-13, end date: 2021-02-09, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: Purpose: protection of the rights and interests of the employee; Tasks: supervision and control over compliance with labor legislation and other normative legal acts containing norms of labor law; Subject of verification: compliance with mandatory requirements established by municipal legal acts


# 282005256582
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration:
Authority:
Purpose of inspection:


# 282005256580
Unscheduled inspection
Start date: 2020-12-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Amurskoi oblasti
Purpose of inspection:


# 002004476332
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-29, duration: 20
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to verify the facts of violations of industrial safety requirements during the operation of a hazardous production facility "Gas supply Network, including inter-settlement Kamchatka Territory" registration A71001650097 owned by Gazprom Gazoraspredenie Far East JSC, indicated in the request of a citizen of the Russian Federation Polyakov MA entry from 25052020 3731104the subject of this audit is compliance with Gazprom Gazoraspredenie Far East JSC mandatory industrial safety requirements


# 002004386159
Unscheduled inspection
Start date: 2020-04-02, end date: 2020-04-30, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: It is carried out in order to verify the fulfillment by the business entity Gazprom Gas Distribution Far East JSC of regulation 08 00820191 dated 08052019 on the elimination of violations of legislation in the field of production and consumption waste management 11 the regulation was issued on the basis of the inspection act dated 08052019 080082019


# 002004391415
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration:
Authority: Federalnaya sluzhba po trudu i zanyatosti
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 272004350217
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: protection of the rights and interests of an employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 002004250109
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 20092019 052518590201


# 651904172706
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: checking the completed construction of the object


# 001903985135
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-03, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to monitor the implementation of paragraphs 5 6 7 8 of the previously issued order dated 21092018 PA718770403, which expired on 01102019the purpose of this inspection is to verify that the legal entity has eliminated the violations identified


# 271904113150
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-12-18, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Habarovskomu krayu
Purpose of inspection: control over the implementation of the regulation on the elimination of established requirements in the field of civil defense dated 31082018 431


# 271903900660
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 001903896230
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation The task is to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or technical customer, hereinafter referred to as the contractor. the state construction supervision is to check1 the compliance of the work performed and the building materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a construction permit to meet the requirements set out in Parts 2 3 and 3_1 Articles 52 of the Urban Planning Code of the Russian Federation


# 001903840006
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-10-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations from 13062019 PA7555 paragraphs 3 to 4, the deadline for which expired on 13092019


# 411903854620
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection:


# 251903875956
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-31, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Primorskomu krayu
Purpose of inspection: in accordance with p10 of the Minutes of the meeting with the Deputy Chairman of the Government of the Russian Federation, DN Kozak, dated 19092018, DKP9166pr, pursuant to the Order of the Federal Service for Supervision of Natural Resources Management dated 12092019 23r, to carry out verification measures to comply with legislation in the field of waste management of production and consumption of organizations that may form spent steel pipes of oil and gas pipelines classified as waste IV hazard class on the territory of Primorsky Krai supervision over compliance with mandatory requirements in the field of waste management of production and consumption compliance with mandatory requirements


# 001902986133
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations of 17062019 052518440101


# 001903657513
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-10-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: taloudellinen Federal state construction supervision within the competence of Rostekhnadzor in the construction, reconstruction of all the objects referred to in paragraph 51 of article 6 of the town planning code of the Russian Federation on the basis of the notification of completion from 04092019 3 BX 11217 from 05092019 about than twenty-four hours before beginning to notify the legal entity in any way allows you to control receiving notification adrenalised of this review is to prevent detection and suppression approved developer technical customer and the person in charge of the construction on the basis of the contract with the developer or technical customer hereinafter called the contractor violations of the legislation on town-planning activities including technical regulations and project documentlibrary proverbiality perform work and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of this Code project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of this Code or information model in the case of the formation and maintenance of information models are required in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices used energy resourcevalue permissions stroitelstvoimoti the requirements set forth in parts 2 and 3 of article 52 3_1


# 001902986165
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-20, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 04062019 052518590101


# 001902776286
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-06-13, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the facts set out in the appeal of a citizen of the Russian Federation the appeal was sent by the Prosecutor's office of the Sobolevsky district on 06052019 A7512OG on violations of industrial safety requirements during the operation of a hazardous production facility to prevent identify and suppress violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of industrial safety as well as in the field of energy security


# 27190803419827
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-06-14, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: The audit is carried out in order to verify the fulfillment of the instruction from 18022019 P2019060048 issued to the Person being checked under the MCD, the deadline for which has expired Verification of the licensee's compliance with licensing requirements Measures taken by the licensee to comply with the instructions to eliminate identified violations of licensing requirements


# 001902633084
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-05-08, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: purpose verification of compliance by the business entity Gazprom Gazoraspredenie Far East JSC with the regulations dated 27092018 0802120181 on the elimination of violations of legislation in the field of production and consumption waste management The order was issued on the basis of the inspection act dated 27092018 080212018 Deadline for the execution of the regulations 01042019 Tasks supervision of compliance with the mandatory requirements of the legislation of the Russian Federation in the field of production and consumption waste management Subject fulfillment by Gazprom Gas Distribution Far East JSC of the instruction dated 27092018 0802120181 on the elimination of violations of legislation in the field of production and consumption waste management due on 01042019 issued by the Department of Rosprirodnadzor for the Far Eastern Federal District


# 251902603689
Unscheduled inspection
Start date: 2019-03-27, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Primorskomu krayu
Purpose of inspection:


# 27190803341049
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 271902534827
Unscheduled inspection
Start date: 2019-02-20, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Habarovskomu krayu
Purpose of inspection:


# 27190803349784
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-27, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: Implementation of state housing supervision in connection with the received application registered under the number EPM832j dated 2412019 Prevention and suppression of violations of citizens' housing rights and legal requirements compliance with mandatory requirements of legislation in the field of housing relations Compliance with mandatory requirements for the placement of information in the state information system of housing and communal services


# 001902489721
Unscheduled inspection
Start date: 2019-02-06, end date: 2019-03-05, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Dalnevostochnomu federalnomu okrugu
Purpose of inspection: verification of compliance by the business entity Gazprom Gas Distribution Far East JSC with the regulations dated 27092018 0802120182 on the elimination of violations of legislation in the field of production and consumption waste management


# 411902490194
Unscheduled inspection
Start date: 2019-02-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Kamchatskogo kraya
Purpose of inspection:


# 27190803359104
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-26, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: Control of the fulfillment by the Audited person of the instruction P2019060004 from 08022019 hereinafter referred to as the Instruction on the elimination of violations of the legislation of the Russian Federation Prevention and suppression of violations of citizens' housing rights and legal requirements compliance with mandatory requirements of legislation in the field of housing relations Compliance with the instructions of state control bodies supervision of municipal control bodies


# 271902493495
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-03-01, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 27190803315778
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-08, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: Implementation of licensing control in connection with the received application registered under the number EPO13549j dated 27/122018 Verification of compliance by the licensee with licensing requirements Compliance with mandatory requirements for the procedure for posting information in the state information system of housing and communal services


# 001902458045
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-03-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation The task is to prevent identify and suppress violations of legislation on urban development, including project documentation, committed by the developer, technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or technical customer, hereinafter referred to as the contractor. The purpose of this audit is a to ensure that the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, comply with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and to ensure that the capital construction facility is equipped with metering devices for energy resources used b to obtain a construction permit in meeting the requirements established by Parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 271802394684
Unscheduled inspection
Start date: 2018-12-24, end date: 2019-01-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 271802381802
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of implementing regional state construction supervision on the basis of the notification of Gazprom Gazoraspredenie Far East JSC on the completion of the construction of a capital construction facility dated 19122018 4 vx 6351 dated 19122018 The purpose of this inspection is to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentation. The subject of this inspection is to verify compliance the work performed and the construction materials used during the construction of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 27180803302128
Unscheduled inspection
Start date: 2018-12-11, end date: 2019-01-16, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: Implementation of state housing supervision in connection with the received application registered under the number B11745j dated 14112018 Prevention and suppression of violations of citizens' housing rights and legal requirements compliance with mandatory requirements of legislation in the field of housing relations Compliance with mandatory requirements for determining the amount and payment of utility bills


# 001802088341
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-29, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 001802088353
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-11-30, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision body


# 271802089133
Unscheduled inspection
Start date: 2018-11-15, end date: 2018-12-12, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the notification of Gazprom Gazoraspredenie Far East JSC on the completion of the construction of a capital construction facility dated 31102018 3 vx 5428 dated 01112018 The purpose of this inspection is to prevent identify and suppress violations of current legislation on urban development, including technical regulations and project documentation. The subject of this inspection is to verify compliance the work performed and the construction materials used during the construction of the Facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation


# 271801910830
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority: Ministerstvo obrazovaniya i nauki Habarovskogo kraya
Purpose of inspection:


# 271801694988
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision based on the inspection program of the Facility dated 13042018. The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the conformity of the work performed and the building materials used during the construction of the Facility, as well as the results of such work requirements of the technical regulations of the project documentation


# 27180803223913
Unscheduled inspection
Start date: 2018-09-07, end date: —, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection:


# 271800834951
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-10-01, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Habarovskomu krayu
Purpose of inspection: The purpose is to monitor the execution of the official's instructions dated 01082017, paragraphs 1234-56710. The task is to prevent the detection and suppression of violations of mandatory requirements of sanitary legislation or to establish their absence. The subject is to comply with the instructions of state control and supervision bodies


# 271800618750
Unscheduled inspection
Start date: 2018-08-10, end date: 2018-08-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program of the Facility dated 02082018. The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of this inspection is to verify the compliance of completed works and applied building materials during the construction of the Facility, as well as the results of such inspections. works according to the requirements of the technical regulations of the project documentation


# 271800447413
Unscheduled inspection
Start date: 2018-06-09, end date: 2018-07-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision based on the inspection program of the Facility dated 13042018. The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the conformity of the work performed and the building materials used during the construction of the Facility, as well as the results of such work requirements of the technical regulations of the project documentation


# 271800425269
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this audit is being conducted for the purpose of implementing regional state construction supervision on the basis of the notice of completion of construction of the reconstruction of the capital construction facility 111123737 dated May 28, 2018 vx 2468 dated May 28, 2018. The objectives of this audit are to prevent identify and suppress violations of current legislation on urban development activities, including technical regulations and project documentation. The subject of the audit is to verify compliance of the work performed and the building materials used during the construction reconstruction of the Facility as well as the results of such work with the requirements of the technical regulations of the project documentation


# 27180803144374
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-15, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: implementation of regional state housing supervision in connection with the expiration of the order dated 28022018 P2018050011 issued by Gazprom Gazoraspredenie DV JSC to eliminate identified violations, the deadline for which has expired, Prevention and suppression of violations of citizens' housing rights and legal requirements, compliance with mandatory requirements of legislation in the field of housing relations, Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies


# 271800399652
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-22, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Habarovskomu krayu
Purpose of inspection: the audit is conducted to check for signs of violation of mandatory requirements that fall under risk indicators in accordance with p3 of the annex to the order of the Ministry of Economic Development of the Russian Federation dated 09.012018 7 identified during an administrative survey the objectives of this audit are to ensure that legal entities comply with land legislation requirements for the protection and use of land The subject of this audit is compliance with mandatory requirements of land legislation on a land plot located on the western side from a land plot with cadastral number 27230020223125 used for non-capital garages


# 001800097957
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations dated 31102017 PA711161 paragraphs 4781011, the execution of which expires on 31.012018


# 001800036407
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of the previously issued instruction on the elimination of identified violations dated 31102017 PA711161 paragraphs 4781011, the execution of which expires on 31.012018


# 271800387818
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-03-14, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Habarovskomu krayu
Purpose of inspection: control of the fulfillment of the prescription


# 271800091190
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-03-14, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Habarovskomu krayu
Purpose of inspection: This check is carried out in order to monitor the execution of the official's instructions from 01082017 items 8 9 12 with a deadline of 10022018


# 651800098022
Unscheduled inspection
Start date: 2018-02-19, end date: 2018-02-19, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Verification of the execution of the prescription


# 27180803076806
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-03-01, duration:
Authority: Glavnoe upravlenie regionalnogo gosudarstvennogo kontrolya i licenzirovaniya Pravitelstva Habarovskogo kraya
Purpose of inspection: Implementation of state housing supervision in connection with received appeals from citizens registered for EPSH181ZH dated 11.012018 EPP424ZH dated 16.012018 Prevention and suppression of violations of citizens' housing rights and legal requirements Compliance with mandatory requirements of legislation in the field of housing relations Compliance with mandatory information disclosure requirements in accordance with the Government of the Russian Federation approved disclosure standard for organizations operating in the field of management of apartment buildings


# 651800165179
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-02, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Verification of the completed capital construction facility Verification of the compliance of the work performed, including the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 25180803031776
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-01-31, duration:
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: checking the prescription


# 001800396322
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-02-01, duration:
Authority: Ministerstvo finansov Rossiiskoi Federacii
Purpose of inspection: verification of the elimination of identified violations during the scheduled inspection verification of the execution of the instruction on the elimination of violations


# 271800004340
Unscheduled inspection
Start date: 2018-01-11, end date: 2018-02-07, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: protection of the rights and interests of an employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 65180803071027
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-01-29, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya Sahalinskoi oblasti
Purpose of inspection: Conducting an inspection on the appeals of citizens of YuzhnoSakhalinsk Ulanivskaya d 66 d112 1 Supervision of compliance with the requirements of housing legislation 2 Protection of consumers' rights to receive housing and communal services of appropriate quality 3 Detection and prevention of violations of the use and maintenance of housing stock Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings


# 65170802934583
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-27, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Inspection of the capital construction site and verification of executive documentation


# 00170802941114
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of paragraphs 1 2 3 of the regulations of the Far Eastern Directorate of Rostechnadzor dated 28072017 PA71641 of Gazprom Gas Distribution Far East JSC paragraphs 1 2 3, the deadline for which expired on 30102017


# 27170802651633
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-06, duration:
Authority: Ministerstvo obrazovaniya i nauki Habarovskogo kraya
Purpose of inspection: the purpose of establishing the compliance of the license applicant with the licensing requirements when carrying out educational activities in accordance with the basic vocational training programs declared for licensing, the purpose of this check is to analyze the compliance of the license applicant with the licensing requirements. The subject of this check is the condition of the premises buildings structures technical facilities equipment and other facilities that the license applicant is supposed to use when carrying out educational activities, as well as the availability of teaching staff necessary to implement the stated for licensing educational programs


# 00170802771046
Unscheduled inspection
Start date: 2017-10-25, end date: 2017-10-31, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the regulation from 120720127 PA71641GS


# 25170802680878
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-20, duration:
Authority: Inspekciya regionalnogo stroitelnogo nadzora i kontrolya v oblasti dolevogo stroitelstva Primorskogo kraya
Purpose of inspection: checking the prescription


# 27170802869658
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Habarovskomu krayu
Purpose of inspection: Monitoring the implementation of the previously issued regulation 7011 dated 11072016 on the elimination of violations of mandatory fire safety requirements


# 00170802771513
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-02, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the regulation of the Far Eastern Administration of Rostechnadzor


# 00170802026206
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-20, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170802028718
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-29, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the legal entity's compliance with the instructions of the state control body


# 00170802026376
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the legal entity's compliance with the order


# 00170802026443
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-25, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170802026283
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the legal entity's compliance with the order


# 27170701841874
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision on the basis of the notice of completion of construction of the reconstruction of the capital construction facility dated July 21, 2017 BX 3445 dated July 21, 2017The objectives of this inspection are to prevent identify and suppress violations of current legislation on urban development, including technical regulations and design documentationthe subject of the inspection is to verify the compliance of the work performed and the construction materials used during the construction reconstruction of the Facility, as well as the results of such work to the requirements of the technical regulations of the project documentation


# 65170801939986
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-08-24, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Inspection of the capital construction facility Verification of executive documentation Quality control of work


# 27170701818640
Unscheduled inspection
Start date: 2017-07-11, end date: 2017-08-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 00170701633019
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the execution of the points of the prescription


# 00170701598523
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-17, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 00170701598519
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 00170701598511
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-11, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 00170701598496
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-12, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision body


# 00170701338816
Unscheduled inspection
Start date: 2017-02-17, end date: 2017-02-21, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338794
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-16, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338842
Unscheduled inspection
Start date: 2017-02-09, end date: 2017-02-13, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338834
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-08, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338833
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-08, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338784
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-03, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance by a legal entity with the instructions of the state control body


# 00170701338772
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-01, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the fulfillment of an early issued instruction on the elimination of identified violations


# 00160701224965
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of Gazprom Gas Distribution Far East JSC paragraph 5 of the regulation of the Far Eastern Directorate of Rostechnadzor dated 150632016 PR714230406, which expired on 15112016


# 27160701187179
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision in connection with the receipt from the technical customer of a notice on the elimination of violations during the construction of a capital construction facility dated November 18, 2016 111048770 bx 4764 dated November 18, 2016. The purpose of this inspection is to monitor compliance by construction participants with the legislation on urban development activities. The purpose of this inspection is to verify compliance with the regulations on elimination of violations during the construction of a capital construction facility dated May 05, 2016 C06032016


# 27160701181749
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision in connection with the receipt from the technical customer of a notice on the elimination of violations during the construction of a capital construction facility dated November 18, 2016 111048768 bx 4763 dated November 18, 2016. The purpose of this inspection is to monitor compliance by construction participants with legislation on urban development activities. The purpose of this inspection is to verify the fulfillment of the regulation on elimination of violations during the construction of a capital construction facility dated May 05, 2016 C05032016


# 27160701181747
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of implementing regional state construction supervision in connection with the receipt from the technical customer of a notice on the elimination of violations during the construction of a capital construction facility dated November 18, 2016 111048771 bx 4765 dated November 18, 2016. The purpose of this inspection is to monitor compliance by construction participants with legislation on urban development activity5 The subject of this inspection is to verify compliance with the regulations on the elimination of violations during the construction of a capital construction facility dated May 05, 2016 C04032016


# 27160701258794
Unscheduled inspection
Start date: 2016-12-22, end date: —, duration:
Authority:
Purpose of inspection:


# 27160701258772
Unscheduled inspection
Start date: 2016-12-22, end date: —, duration:
Authority:
Purpose of inspection:


# 65160701285307
Unscheduled inspection
Start date: 2016-12-01, end date: 2016-12-05, duration:
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the prescription


# 27160701050105
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-11-16, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 00160700891416
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance by a legal entity with the instructions of the state control and supervision body


# 27160701088547
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-11-23, duration:
Authority: Gosudarstvennaya inspekciya truda v Habarovskom krae
Purpose of inspection: The purpose is to protect the rights and interests of the employee Tasks supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms The subject of verification is compliance with mandatory requirements established by municipal legal acts


# 27160700106708
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-10-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora Pravitelstva Habarovskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision based on the inspection program of the facility dated August 19, 2016The purpose of the inspection is to monitor compliance by construction participants with legislation on urban development activities


# 00160601727698
Unscheduled inspection
Start date: 2016-08-01, end date: 2016-08-02, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the implementation of an earlier issued prescription


# 00160601727717
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-04, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Consideration of documents of a legal entity


# 00160601786901
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-18, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of Gazprom Gas Distribution Far East JSC paragraphs 2 to 3 of the regulation of the Far Eastern Directorate of Rostechnadzor dated 15062016 PR714230406, which expires on 15082016


# 00160601662912
Unscheduled inspection
Start date: 2016-06-10, end date: 2016-06-14, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the legal entity's compliance with paragraph 2 of Regulation No. 05052015 PA713851, which expired on 05052016


# 27160601640188
Unscheduled inspection
Start date: 2016-05-23, end date: 2016-06-17, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Habarovskomu krayu
Purpose of inspection: execution of the order on elimination of the revealed violations 87138 dated 08092015


# 27160601616725
Unscheduled inspection
Start date: 2016-05-12, end date: 2016-06-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Habarovskomu krayu
Purpose of inspection: control over the implementation of the regulation of the state fire supervision 12511 of 18062015


# 00160601497712
Unscheduled inspection
Start date: 2016-02-25, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of 4 points issued to a legal entity 2 prescriptions from 05052015 with a deadline of 05/12/2015 postponement of the deadline to 31/122015 PA713854 p6 p7 PA713855 p6 p7p6 prescription PA713854 Reservoir installation 4 not fulfilled There is no action plan for the localization and elimination of the consequences of accidents at the OPO PLA A single PLA for 15 OPO in Khabarovsk and Khabarovsk region is not properly coordinated Postponement of the deadline for completion order PA7196 from 26022016 to 26062016p7 order PA713854 Reservoir installation 4 not completed The plan does not contain a description of the OPO for which an accident characteristic has been developed specific to this facility Postponement of the deadline for completion order PA7196 from 26022016 to 26062016p6 order PA713855 Reservoir installation 7 not fulfilled There is no action plan for localization and elimination of consequences of accidents at the OPO PLA A single plan is presented by 15 OPO in Khabarovsk and the Khabarovsk region has not been properly agreed upon Postponement of the deadline for execution order PA7196 from 26022016 to 26062016p7 order PA713855 Reservoir installation 7 has not been completed The bill does not contain a description of the OPO for which an accident characteristic has been developed specific to this facility Postponement of the deadline order PA7196 from 26022016 to 26062016


# 00150601410645
Unscheduled inspection
Start date: 2015-12-28, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the prescription issued to the legal entity from 22052015 PA71489, the deadline for which, based on the letter from 06072015 ex 04345093, was postponed to 05112015the identification of objects in the OPO tank installation 24 p Pereyaslavka and tank installation 25 p Choir was carried out incorrectly.


# 00150601317268
Unscheduled inspection
Start date: 2015-11-11, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of the instruction issued to the legal entity from 29092014 040254PV p2 p4 p5p2the certification protocols for the working staff are not properly executed 4the technical devices used at the facility are operated beyond the designated resource without diagnostics 5the schedule for the repair of buildings and structures is not presented. The walls of the production premises are in unsatisfactory condition


# 00150601317279
Unscheduled inspection
Start date: 2015-11-23, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the fulfillment of orders previously issued to a legal entity from 13102014 040257PV p3 p4 with a deadline of 13102015 from 17092015 10651008140 p1 from 18092015 10601008150 p1 from 19092015 10801008160 p1 with a deadline of 01102015


# 00150601317211
Unscheduled inspection
Start date: 2015-11-24, end date: —, duration:
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with 11 points issued to a legal entity prescriptions from 05052015 with a runtime of up to 05112015 ПА713851 ПА713853 P3 P1 P3 P4 P7 ПА713854 P1 P2 P5 P1 P4 ПА713855 п5п2 ПА713851 Vypolnennoe gas analyzers control mixtures in the premises of the STS is the control mixtures with a concentration of more than 10 НКПРп1 ПА713853 of Vypolneno the information to the card account during the registration OPO part of the OPO 39 provided the GRU with the vessels in the number of 78 units for 42 kubm 190т that does not match the actual data In the presence of OPO 37 GRU 164 сосуда3444т СУГп3 ПА713853 Vypolnennoe held on 05042015 timely technical inspection GRU 19 ul Craft 23 16042015 GRU 12 ul Craft 12п4 ПА713853 Not vypolnennoe conducted on a timely 26042015 technical diagnostics of 6 vessels GRU 128 street Kubiak 18п7 ПА713853 of Vypolneno viewed 20 GRU from 37 takes place unsatisfactory colouring of the facade of gas valves pressure reducing heads GRU 16 17 128 111 114 115 116 118п1 ПА713854 of Vypolneno the information to the card account during the registration OPO part of the OPO includes 18 GRU 35 vessels for 42 kubm number СУГ90т that does not match the actual data In the presence of OPO 10 GRU 35 сосудов735 t СУГп2 ПА713854 not vypolnennoe submitted project documentation and examination of design documentation for the elimination of 8 GRU part of the OPO GRU 237 238 239 240 242 243 249 251п5 ПА713854 not vypolnennoe presents confirmation of the admission staff OPO no contraindications to the clerks of the periodic medical examination of staff OPO 1 4 7п1 ПА713855 of Vypolneno the information to the card account during the registration OPO part of the OPO provided 39 GRU 78 vessels 42кубм number СУГ190т that does not match the actual data In the presence of 38 GRU 118 сосудов248т СУГп4 ПА713855 of Vypolneno viewed 7 of 38 GRU takes place unsatisfactory colouring of the facade pipelines GRU 422 41 42п5 ПА713855 Not vypolnennoe presents confirmation of the admission staff OPO no contraindications to the clerks of the periodic medical examination


# 27150600046367
Unscheduled inspection
Start date: 2015-08-17, end date: 2015-09-11, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Habarovskomu krayu
Purpose of inspection: control of the execution of regulation 1321109 of 12122014


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.