Found 30 inspections:

# 772101474830
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration:
Authority:
Purpose of inspection:


# 662101273934
Unscheduled inspection
Start date: 2021-11-11, end date: 2021-11-17, duration: 5
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya s celyu proverki ispolneniya trebovanii predpisaniya ot 17.09.2021 № 29-14-29/382, vydannogo OOO «Almaz-Antei Stroi», zadachei nastoyaschei proverki yavlyaetsya: osuschestvlenie regionalnogo gosudarstvennogo stroitelnogo nadzora. Predmetom nastoyaschei proverki yavlyaetsya: vypolnenie ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii ot 17.09.2021 № 29-14-29/382, vydannogo OOO «Almaz-Antei Stroi».


# 772101360027
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-12-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772101215720
Unscheduled inspection
Start date: 2021-10-13, end date: 2021-10-15, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101172737
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772100890901
Unscheduled inspection
Start date: 2021-09-23, end date: 2021-09-29, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100462018
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772100341228
Unscheduled inspection
Start date: 2021-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772100284874
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-06-24, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100186640
Unscheduled inspection
Start date: 2021-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 772100042426
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-22, duration: 12
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772105347698
Unscheduled inspection
Start date: 2021-02-04, end date: 2021-02-26, duration: 16
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772004416518
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004360073
Unscheduled inspection
Start date: 2020-03-13, end date: 2020-03-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771904139714
Unscheduled inspection
Start date: 2019-12-26, end date: 2020-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771903946107
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 771903669329
Unscheduled inspection
Start date: 2019-09-06, end date: 2019-09-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803427291
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803375931
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803363762
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803317448
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803306303
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803260656
Unscheduled inspection
Start date: 2018-10-24, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803191199
Unscheduled inspection
Start date: 2018-08-30, end date: 2018-09-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803170966
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803144912
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 001800407761
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-21, duration:
Authority: FGKU Specialnoe upravlenie FPS 3 MCHS Rossii
Purpose of inspection: Cel proverki sootvetstviya soiskatelya licenzii MCHS Rossii licenzionnym trebovaniyam i usloviyam v sootvetstvii so st 14 Federalnogo zakona ot 4 maya 2011 g 99FZ O licenzirovanii otdelnyh vidov deyatelnosti


# 77180803119342
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802889758
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-12-20, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Zaschita prav i interesov rabotnikov v svyazi s postupleniem v Inspekciyu obrascheniya rabotnika ot 10112017 g 295717PO po voprosam oplaty truda oformleniya i rastorzheniya trudovogo dogovora


# 77170701773777
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-08-08, duration:
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Zaschita prav i interesov rabotnikov v svyazi s postupleniem v Inspekciyu obrascheniya rabotnika ot 05062017 g 72347017OB po voprosam oplaty truda


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.