Found 97 inspections:

# 342101440179
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 342101298417
Unscheduled inspection
Start date: 2021-11-24, end date: 2021-11-30, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation., the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation., 1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter – GsK RF) (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the GsK RF, are part of such project documentation) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the GsK of the Russian Federation); 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; 4) requirements established by part 4 of Article 52 of the GsK of the Russian Federation to ensure the conservation of the object 5) requirements for the procedure for the implementation of construction control established by the GSK of the Russian Federation and other regulatory legal acts.


# 342100754402
Unscheduled inspection
Start date: 2021-09-15, end date: —, duration:
Authority:
Purpose of inspection:


# 342100505957
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342100266619
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-11, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources and design documentation;, the purpose of this audit is to prevent identification and suppression of violations of the legislation of the Russian Federation and project documentation., a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes, included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which the requirements energy efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; b) availability of a construction permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100168731
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of assessing the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used technical regulations and design documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a construction permit; c) fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100217924
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and design documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a construction permit; c) fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation


# 342100216486
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used and design documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation and project documentation. 7. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100144657
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-20, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation; The purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; b) availability of a building permit; c) compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342100084977
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-03-25, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used technical regulations and design documentation; b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation. 7. The subject of this audit is compliance with mandatory requirements in relation to: a) compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; b) availability of a building permit; c) compliance with the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 342105319656
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342105302785
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342005225488
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-11-20, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the program of inspections to assess compliance activities conducted at the site to the requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project dokumentalistika of this review is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements provided for by parts 2 3 31 and article 52 of the town planning code of the Russian Federation


# 342005184106
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-10-29, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of the conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources of technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work the requirements adopted in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 article 52 of the town planning code of the Russian Federation


# 342005185110
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342005178787
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration:
Authority:
Purpose of inspection:


# 342004471088
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 342004465183
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 342004455519
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 342004459490
Unscheduled inspection
Start date: 2020-07-16, end date: 2020-07-24, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in accordance with the program of inspections to assess compliance activities conducted at the site to the requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and design dokumentaciis the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object as well as the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 342004453222
Unscheduled inspection
Start date: 2020-07-14, end date: 2020-07-20, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of assessing the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources technical regulations and design documentationib the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation The subject of this audit is compliance with mandatory requirements in relation to the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004439928
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342004385224
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-03-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including project documentation b the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation7 The subject of this audit is the fulfillment of the instruction from 11022020 40 issued by Stroytechinvest LLC on the elimination of violations committed during the construction of the Facility


# 342004361510
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In accordance with the programme of checks received by the representative of the developer with the purpose of conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and design dokumentaciis the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentlibraries of this review is to comply with the mandatory requirements in otnosheniia of the compliance of contractors and construction materials used in the construction process of reconstruction capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resursov permit stroitelstvo requirements established in parts 2 and 3 of article 31 of 52 of the town planning code of the Russian Federation


# 342004344816
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-04-06, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: consideration of an employee's application for violation of his labor rights


# 342004370445
Unscheduled inspection
Start date: 2020-03-17, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342004363186
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-13, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the expiration of the deadline for the employer's execution of the issued instruction 347434819OB12761I3316 dated January 22, 2020


# 342004267016
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342004202777
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation


# 342004223476
Unscheduled inspection
Start date: 2020-01-23, end date: —, duration:
Authority:
Purpose of inspection:


# 342004226031
Unscheduled inspection
Start date: 2020-01-24, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 342004203270
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-22, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation


# 341904153871
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-02-03, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: the implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms consideration of the appeal of vh 347434819OB dated 13122019


# 341904125855
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-20, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose of the conformity assessment activities undertaken at the Facility requirements of planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment of a capital construction object metering devices of energy resources including technical regulations and project documentation b the purpose of this check is to prevent the detection and suppression of violations of laws of the Russian Federation including technical regulations and project documentation 7 the Subject of this review is to comply with the mandatory requirements and the compliance of contractors and construction materials used in the construction process of reconstruction of capital construction object and the results of such work requirements approved in accordance with paragraphs 152 and 153 of 15 of article 48 of the town planning Code of the project documentation to reflect changes made to the project documentation in accordance with paragraphs 38 and 39 of article 49 of the town planning Code of the Russian Federation and the information model, or if the formation and maintenance of information models are required in accordance with the requirements of the town planning Code of the Russian Federation including the energy efficiency standards with the exception of capital construction objects, for which the energy performance requirements shall not apply and the requirements of the equipment of a capital construction object metering devices of energy resources b permit construction in the implementation of the requirements provided for by parts 2 3 and 31 of article 52 of the town planning code of the Russian Federation


# 341903889509
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903903995
Unscheduled inspection
Start date: 2019-10-29, end date: 2019-10-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of work and used building materials during construction reconstruction the capital construction object as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with with the requirements of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903871610
Unscheduled inspection
Start date: 2019-10-17, end date: 2019-10-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903499151
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341903636835
Unscheduled inspection
Start date: 2019-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 341902912966
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration:
Authority:
Purpose of inspection:


# 341902912932
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902912907
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of work and used building materials during construction reconstruction the capital construction object as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with with the requirements of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902901528
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-06, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements in relation to the compliance of work and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in in accordance with the requirements of the Urban Planning Code of the Russian Federation, including the requirements of energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902641666
Unscheduled inspection
Start date: 2019-04-10, end date: 2019-04-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied construction materials to the requirements of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902641642
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of project documentation b availability of a construction permit c compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902511346
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902581938
Unscheduled inspection
Start date: 2019-02-28, end date: 2019-03-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the representative of the developer Stroyservice LLC in order to assess the compliance requirements of the Facility with technical regulations and project documentation b the task of this inspection is to ensure that the Facility meets the requirements of technical regulations and project documentation


# 341802296170
Unscheduled inspection
Start date: 2018-12-14, end date: 2018-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a this inspection is carried out in accordance with the inspection program received by the representative of the developer Stroyservice LLC in order to assess the compliance requirements of the Facility with technical regulations and project documentation b the task of this inspection is to ensure that the Facility meets the requirements of technical regulations and project documentation The subject of this inspection is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements project documentation


# 341802115862
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341802016022
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341802016040
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341802020378
Unscheduled inspection
Start date: 2018-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 341801911679
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation, the task of this audit is to prevent identify and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341801911312
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341801906934
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation b the purpose of this audit is to prevent identify and the suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800613326
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800551344
Unscheduled inspection
Start date: 2018-07-20, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341800551371
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-07-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800563117
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 341800499645
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800499640
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800571878
Unscheduled inspection
Start date: 2018-05-30, end date: 2018-06-01, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject of this audit is the fulfillment of the instruction from 10042018 176 issued by Technostroy LLC on the elimination of violations of the during the construction of the Facility


# 341800362966
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements for a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800390108
Unscheduled inspection
Start date: 2018-05-23, end date: 2018-05-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800298673
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800311392
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800311299
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation, the subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800311256
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-04-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800078018
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation. The subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied construction materials to the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800057433
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-02-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: Implementation of federal state supervision over the employer's compliance with the mandatory requirements of labor legislation to ensure compliance with and protection of labor rights interests and freedoms of citizens including the right to safe working conditions in connection with the consideration of an employee of STROYTECHINVEST LLC about a violation of his labor rights received by the State Labor Inspectorate dated 23012018 34712118


# 341800011137
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation b the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation 7 The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used meet the requirements of the technical regulations of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800025731
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation b the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation 7 The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works with their results and the construction materials used meet the requirements of the technical regulations of the project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802994471
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802994440
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802865304
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802865277
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration:
Authority:
Purpose of inspection:


# 34170802836299
Unscheduled inspection
Start date: 2017-11-14, end date: 2017-11-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802783645
Unscheduled inspection
Start date: 2017-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 34170802745602
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170802745613
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170802290897
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-09-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170701883880
Unscheduled inspection
Start date: 2017-08-11, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170701879221
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170701767231
Unscheduled inspection
Start date: 2017-07-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170701767276
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-07-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701819487
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170701819469
Unscheduled inspection
Start date: 2017-07-26, end date: —, duration:
Authority:
Purpose of inspection:


# 34170701631604
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170701515718
Unscheduled inspection
Start date: 2017-04-07, end date: —, duration:
Authority:
Purpose of inspection:


# 34170701515688
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701556486
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701556556
Unscheduled inspection
Start date: 2017-04-21, end date: 2017-04-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701556518
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-24, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentation, the task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with the requirements technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701403510
Unscheduled inspection
Start date: 2017-02-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 34170701328102
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34170701328081
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-01-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work


# 34160701151757
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.