# 002005285065
Unscheduled inspection
Start date: 2020-12-25, end date: 2021-01-25, duration: 15
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to prevent violations of legislation on urban development activities, including project documentation. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in the event of their identification and prosecution of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation taking into account the changes made to the design documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005206344
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-17, duration: 7
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by the Deputy Head of Rostechnadzor AA Kulakov on October 11, 2019. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004306886
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903651600
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 25062019 052519290102, which is notified to the legal entity in any available way at least twenty-four hours before the start of its implementation to control the receipt of the notification by the addressee, the task of this audit is to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this audit is the factual fulfillment of the instruction on the elimination of violations of 25062019 052519290102
# 001903648463
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-23, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to monitor the implementation of the previously issued prescription from 03042019 P906r. The objectives of this audit are to monitor the measures taken by a legal entity to comply with the prescription and comply with mandatory norms and rules of operation in power plants, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001800247611
Unscheduled inspection
Start date: 2018-03-30, end date: 2018-03-30, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere obrazovaniya i nauki
Purpose of inspection: this audit is carried out in order to provide a state service for licensing educational activities on the basis of the licensee's application dated 26022018 for the renewal of a license to carry out educational activities the purpose of this audit is to verify the licensee's compliance with licensing requirements The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or permits approval for the implementation of other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities the unified state register of individual entrepreneurs and other federal information resources
# 002005285065
Unscheduled inspection
Start date: 2020-12-25, end date: 2021-01-25, duration: 15
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to prevent violations of legislation on urban development activities, including project documentation. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in the event of their identification and prosecution of persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation taking into account the changes made to the design documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 002005206344
Unscheduled inspection
Start date: 2020-11-09, end date: 2020-11-17, duration: 7
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by the Deputy Head of Rostechnadzor AA Kulakov on October 11, 2019. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004469992
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-17, duration: 6
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by the IO of the deputy head of the MTU Rostechnadzor AA Kulakov on October 11, 2019. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts, the subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 002004306886
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-03, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this audit is carried out in order to control the execution of the order dated December 16, 2019 751G3320G33 The tasks of this audit are to monitor the measures taken by a legal entity to comply with the order and comply with the mandatory requirements of legislation on urban development during the construction reconstruction of a capital construction facility, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice those who committed violations the requirements of Federal laws and other regulatory legal acts7 The subject of verification is the fulfillment of the instructions of the state control supervision body
# 002004230014
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the audit program approved by the Deputy head of Rostechnadzor MTU AA Kulakov on October 11, 2019. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to elimination of violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 001904106682
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-30, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations of 28102019 052519280201, which is notified to the legal entity in any available way at least twenty-four hours before the start of its implementation to control the receipt of the notification by the addressee, the task of this audit is to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this audit is the factual fulfillment of the instruction on the elimination of violations dated 28102019 052519280201
# 001904013654
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 6 To establish that this inspection is carried out in order to implement the inspection program approved by the Deputy head of Rostechnadzor MTU AA Kulakov on October 11, 2019. The objectives of this inspection are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 15_2 and 15_3 of Article 48 The Urban Planning Code of the Russian Federation of project documentation, taking into account the changes made to the project documentation in accordance with parts 3_8 and 3_9 of Article 49 of the Urban Planning Code of the Russian Federation, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of a construction permit to meet the requirements established parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903651509
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 25062019 052519280101, which is notified to the legal entity in any available way at least twenty-four hours before the start of its implementation The purpose of this audit is to prevent identify and suppress violations of the legislation on urban development activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this audit is the factual fulfillment of the instruction on the elimination of violations of 25062019 052519280101
# 001903651600
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 25062019 052519290102, which is notified to the legal entity in any available way at least twenty-four hours before the start of its implementation to control the receipt of the notification by the addressee, the task of this audit is to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this audit is the factual fulfillment of the instruction on the elimination of violations of 25062019 052519290102
# 001903651596
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Dalnevostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out federal state construction supervision within the competence of Rostechnadzor during the construction and reconstruction of all facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation on the basis of the expiration of the deadline for the elimination of violations from 25062019 052519270102, which is notified to the legal entity in any available way at least twenty-four hours before the start of its implementation to control the receipt of the notification by the addressee, the task of this audit is to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this audit is the factual fulfillment of the instruction on the elimination of violations of 25062019 052519270102
# 661903433354
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the GPN's instruction on the elimination of violations of mandatory fire safety requirements 145511 dated 11102018. The objectives of this audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to monitor the implementation by the organization of officials and citizens of mandatory fire safety requirements and take measures based on the results of this audit
# 661903433347
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-10-07, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the GPN's instruction on the elimination of violations of mandatory fire safety requirements 145611 dated 11102018. The objectives of this audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to monitor the implementation by the organization of officials and citizens of mandatory fire safety requirements and take measures based on the results of this audit
# 001903648463
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-23, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this audit is carried out in order to monitor the implementation of the previously issued prescription from 03042019 P906r. The objectives of this audit are to monitor the measures taken by a legal entity to comply with the prescription and comply with mandatory norms and rules of operation in power plants, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of Federal laws and other regulatory The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001902696700
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-03, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to fulfill the order of the Government of the Russian Federation dated January 18, 2019 DKP9274 of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated February 1, 2019 44 of the order of the Interregional Technological Department of the Federal Service for Environmental Technological and Nuclear Supervision dated February 11, 2019 420r the objectives of this audit are to monitor the measures taken to comply with legal requirements by an individual entrepreneur of mandatory safety requirements in the electric power industry prevention detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation in the field of safety in the electric power industry taking measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory acts The subject of this audit is compliance with mandatory requirements
# 661801693255
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-22, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the GPN's instruction on the elimination of violations of mandatory fire safety requirements 126311 of 02112017. The objectives of this audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to monitor the implementation by the organization of officials and citizens of mandatory fire safety requirements and take measures based on the results of this audit
# 661801693253
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801210829
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 501800528401
Unscheduled inspection
Start date: 2018-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771800557733
Unscheduled inspection
Start date: 2018-07-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771800345947
Unscheduled inspection
Start date: 2018-04-28, end date: 2018-05-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 01042018 6267618PV on issues of remuneration, registration and termination of an employment contract
# 001800247611
Unscheduled inspection
Start date: 2018-03-30, end date: 2018-03-30, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere obrazovaniya i nauki
Purpose of inspection: this audit is carried out in order to provide a state service for licensing educational activities on the basis of the licensee's application dated 26022018 for the renewal of a license to carry out educational activities the purpose of this audit is to verify the licensee's compliance with licensing requirements The subject of this audit is the compliance of the information contained in the application and documents of a legal entity or individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or permits approval for the implementation of other legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities the unified state register of individual entrepreneurs and other federal information resources
# 771800055322
Unscheduled inspection
Start date: 2018-02-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802883475
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-12-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: Protection of the rights and interests of employees in connection with the receipt by the Inspectorate of an employee's appeal dated 01112017 on issues of remuneration, registration and termination of an employment contract
# 66170802698161
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802698141
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802673453
Unscheduled inspection
Start date: 2017-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701515546
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-05-05, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of the regulation GPN 54211 of 24112016 on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire
# 77160701195601
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-23, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of regulation 20 of 26112015
# 62160701156898
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701060324
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-29, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of the regulation GPN 82411 of 29062016 on the elimination of violations of fire safety requirements on carrying out measures to ensure fire safety at protection facilities and to prevent the threat of fire
# 66160701044062
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: verification of the execution of a previously issued order to eliminate violations of mandatory fire safety requirements
# 66160701043655
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-11-21, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: verification of the execution of a previously issued order to eliminate violations of mandatory fire safety requirements
# 77160700055338
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-09-13, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection: protection of the rights and interests of employees
# 77160601627118
Unscheduled inspection
Start date: 2016-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 62150601357128
Unscheduled inspection
Start date: 2015-11-26, end date: 2015-12-08, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Ryazanskoi oblasti
Purpose of inspection: verification of the facts stated in the appeal