# 562201534271
Unscheduled inspection
Start date: 2022-01-11, end date: 2022-02-07, duration: 20
Authority: Gosudarstvennaya zhilischnaya inspekciya po Orenburgskoi oblasti
Purpose of inspection: verification of compliance with the regulation dated 11/12/2021 No. PR-2554, prevention, detection and suppression of violations of legal requirements, compliance with the instructions of state control (supervision) bodies
# 562101518960
Unscheduled inspection
Start date: 2021-12-24, end date: —, duration: —
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection:
# 562101467292
Unscheduled inspection
Start date: 2021-12-20, end date: 2021-12-24, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of the inspection program approved on 04/23/2021 (as amended. 13.12.2021)., the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Development Code of the Russian Federation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as project documentation)., The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of approved design documentation; 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts; 5) paragraphs 1, 2, 3, 4, 5 of the inspection program.
# 562101448909
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-16, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in connection with receipt of a notice of completion of a capital construction facility, the objectives of this inspection are: prevention, detection and suppression of violations of the legislation on urban development committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation)., The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of approved design documentation; 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 562101450313
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-16, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in connection with receipt of a notice of completion of construction of a capital construction facility;, the objectives of this inspection are: prevention, detection and suppression of violations of the legislation on urban planning activities committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Code, are part of such project documentation) (hereinafter referred to as project documentation)., The subject of this audit is compliance with: 1) compliance of the work performed and the construction materials and products used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of approved design documentation; 2) requirements for a construction permit; 3) requirements established by parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 4) requirements for the procedure for construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 562101442381
Unscheduled inspection
Start date: 2021-12-14, end date: 2021-12-17, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to: carry out regional state construction supervision on the basis of the received notice of the start of construction dated 11/30/2021 and the inspection program approved on 12/06/2021;, the objectives of this inspection are: identification and suppression of violations of the requirements of project documentation, legislation on urban development (Part 2 of Article 51, Part 2, 3, 3.1, 52 of the Urban Planning Code of the Russian Federation)., The subject of this audit is compliance with: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) (clause 1.2 of the inspection program),
# 562101356665
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562101350798
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: 1. This inspection is carried out for the purpose of: carrying out regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection during the construction of a capital construction facility dated 11/19/2021.
2. The objectives of this inspection are: prevention, identification and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or by the technical customer, violations of the legislation on urban planning activities, project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation of the Code (including taking into account the changes made to the working documentation and which, in accordance with Part 1.3 of Article 52 of the Urban Planning Code of the Russian Federation, are part of such project documentation) (hereinafter referred to as the project documentation documentation).
3. The subject of this audit is compliance with:
1) compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation;
2) requirements for a construction permit;
3) the requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
4) requirements for the procedure for the implementation of construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts;
5) verification of completed works according to the notification of the completion dates of works subject to verification during the construction of a capital construction facility dated 11/19/2021.
# 562101341143
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: 7
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: verification of compliance with regulations
# 562101200277
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: 8
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: verification of compliance with regulations
# 562101195720
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya po Orenburgskoi oblasti
Purpose of inspection: verification of the facts of violation of mandatory requirements of legislation on GIS housing and communal services set out in citizen's appeals dated 09/14/2021 No. 56-2021-3507, 56-2021-3506, received through the state information system of housing and communal services (hereinafter - GIS Housing and communal services, system) (motivated submission dated 10/27/2021 b/n)
The objectives of the audit
are to prevent, identify and suppress violations of legal requirements
# 562100504581
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of a notice of the beginning of construction and a program of inspections;
- the objectives of this audit are: to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation).
The subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used.
# 562100504406
Unscheduled inspection
Start date: 2021-08-23, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of a notice of the beginning of construction and a program of inspections;
- the objectives of this audit are: to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation).
The subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used.
# 562100357216
Unscheduled inspection
Start date: 2021-07-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562100351119
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: 9
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: verification of compliance with regulations
# 562100277177
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 5
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: verification of compliance with regulations
# 562100221029
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 6
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: Control over the execution of regulations
# 562100240549
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of the inspection program, notification of the start of construction$
- the objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban planning activities and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer.
- the subject of this audit is: verification of compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; compliance with the requirements of Parts 2, 3, 3.1 of Article 52 The Urban Planning Code of the Russian Federation, elimination of violations identified in the process of construction control and state construction supervision, inspection programs, registration and submission of executive documentation.
# 562100232349
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of a notice of the beginning of construction and a program of inspections;
- the objectives of this audit are: to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, legislation on urban planning (Part 2 of Article 51, Part 2, 3, 3.1, 6 of Article 52 of the Urban Planning Code of the Russian Federation).
7. The subject of this audit is: compliance with the mandatory requirements of urban planning legislation; compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used.
# 562100232172
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562100223393
Unscheduled inspection
Start date: 2021-05-21, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - implementation of regional state construction supervision on the basis of a notice of the beginning of construction, a program of inspections;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities committed by the developer, to perform work in accordance with the design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
The subject of regional state construction supervision in relation to capital construction facilities specified in part 1 of Article 54 of the Urban Development Code of the Russian Federation is verification:
- compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices for energy resources used;
# 562100135192
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-14, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: - this inspection is carried out for the purpose of: implementation of regional state construction supervision on the basis of a notice of completion of construction;
- the objectives of this audit are: to identify and suppress violations of the legislation on urban planning activities by the developer, project documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources.
- the subject of this audit is: verification of compliance of completed works and applied building materials during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used.
# 562100111261
Unscheduled inspection
Start date: 2021-04-01, end date: 2021-04-12, duration: 8
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: Control over the execution of regulations
# 562100065222
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-24, duration: 8
Authority: Mezhmunicipalnoe upravlenie Ministerstva vnutrennih del Rossiiskoi Federacii "Orenburgskoe"
Purpose of inspection: verification of compliance with regulations
# 562005270335
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-29, duration: 12
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii Orenburgskoe
Purpose of inspection: Control over the execution of regulations
# 562005283894
Unscheduled inspection
Start date: 2020-12-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562005258702
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562005181631
Unscheduled inspection
Start date: 2020-10-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 562004462965
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004470633
Unscheduled inspection
Start date: 2020-07-29, end date: 2020-08-07, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of a notice of the beginning of construction. The objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation and design documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources. The purpose of this audit is to ensure that the work performed and the construction materials used in the construction process, as well as the results of such work, comply with the requirements of the design documentation, eliminate violations identified during the implementation of construction control and regional state construction supervision, design and submission of executive documentation
# 562004423043
Unscheduled inspection
Start date: 2020-06-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 562004463027
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-07-14, duration: 15
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii Orenburgskoe
Purpose of inspection: Control over the execution of the Department of Construction and Road Management of the Orenburg city Administration of regulations on the elimination of identified violations
# 562004440470
Unscheduled inspection
Start date: 2020-06-23, end date: 2020-07-14, duration: 15
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii Orenburgskoe
Purpose of inspection: Control over the execution of regulations
# 562004337612
Unscheduled inspection
Start date: 2020-03-04, end date: 2020-03-12, duration: —
Authority: Otdel Gosudarstvennoi inspekcii bezopasnosti dorozhnogo dvizheniya Muzhmunicipalnogo upravleniya Ministerstva vnutrennih del Rossiiskoi Federacii Orenburgskoe
Purpose of inspection: Control over the execution of regulations
# 562004376829
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 561904092115
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision in accordance with the notice of completion of construction. The objectives of this inspection are to identify and suppress violations of the legislation on urban development and project documentation committed by the developer, including the requirements for equipping the capital construction facility with metering devices for energy resources used. The subject of this inspection is the compliance of the work and the construction materials used in the process construction reconstruction of the capital construction facility as well as the results of such work to the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation elimination of violations identified in the process of construction control and state construction supervision registration and submission of executive documentation
# 561904106727
Unscheduled inspection
Start date: 2019-12-16, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561904028749
Unscheduled inspection
Start date: 2019-11-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561903920418
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the Inspection Program approved on 07102019. the objectives of this inspection are to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used legislation on urban development h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation the subject of this audit is the compliance of the work and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used in the performance of work to the reinforcement of the floor slab of the first floor to the roof installation of stained glass windows doors general construction works of the pumping station without equipment provision of executive documentation compliance with urban planning legislation h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation
# 561903966036
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 561903890175
Unscheduled inspection
Start date: 2019-10-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection:
# 561903853587
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision on the basis of the inspection program. The objectives of this inspection are to identify and suppress violations of the legislation on urban planning activities h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation and project documentation, including the requirements for equipping a capital construction facility with metering devices for used energy resources. The subject of this inspection is to identify and suppress violations of the legislation on urban planning activities h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation and design documentation, including the requirements for equipping a capital construction facility with metering devices for used energy resources. The verification is the compliance of the work performed and the construction materials used in the construction process as well as the results of such work with the requirements of the design documentation elimination of violations identified during the implementation of construction control and regional state construction supervision registration and submission of executive documentation
# 561903572259
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this audit is carried out in order to carry out regional state construction supervision on the basis of a notice on the completion dates of works subject to verification. The objectives of this audit are to identify and suppress violations of the legislation on urban planning activities h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation and design documentation, including the requirements for equipping the capital construction facility with metering devices used The subject of this audit is the compliance of the work performed and the construction materials used in the construction process as well as the results of such work with the requirements of the design documentation elimination of violations identified in the process of construction control and regional state construction supervision registration and submission of executive documentation
# 561903387908
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision on the basis of the Inspection Program approved 28092018. the objectives of this inspection are to identify and suppress violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used legislation on urban development h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation, the subject of this audit is the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation cipher 192042017 LLC PSF Mashtehproekt, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used when performing work on the installation of the power frame buildings roofs installation of walls partitions decorative elements painting of the facade cornice overhangs external fences columns landscaping provision of executive documentation compliance with urban planning legislation h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation
# 561902983831
Unscheduled inspection
Start date: 2019-08-23, end date: 2019-08-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: the implementation of regional state construction supervision on the basis of the inspection program the objectives of this audit are to identify and suppress violations of the legislation on urban planning activities h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation and project documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used the subject of this audit is the compliance of the completed works and the construction materials used in the construction process as well as the results of such work to the requirements of the design documentation elimination of violations identified in the process of construction control and regional state construction supervision registration and submission of executive documentation
# 561902898186
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of the Inspection Program approved 19022018, the manifestation and suppression of violations of the requirements of design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources legislation on urban development h 2 st 51 h 2 3 31 6 st 52 of the Urban Development Code of the Russian Federation Compliance with the work and construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation cipher 192042017 of LLC PSF Mashtehproekt, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used when performing work on the installation of the power frame of the building roof installation of walls partitions decorative elements painting the facade cornice overhangs external fences columns landscaping territories provision of executive documentation compliance with urban planning legislation h 2 st 51 h 2 3 31 6 st 52 of the Urban Planning Code of the Russian Federation