# 741902703969
Unscheduled inspection
Start date: 2019-05-15, end date: 2019-05-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of a hinged ventilated facade of floors compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation