# 001902938843
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-21, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated 04072019 262 "On monitoring the progress of preparation of electric Power facilities for operation in the autumn-winter period 2019-2020" issued on the basis of the order of the Government of the Russian Federation dated 18062019 DKP94982 of the Order of the Ural Department of the Federal Service for Environmental Technological and Nuclear Supervision dated 05072019 484 "On the organization of the course of preparation of electric Power Industry entities to work in the autumn-winter period 2019-2020"
# 001800060679
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 00170802631695
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 00160700998262
Unscheduled inspection
Start date: 2016-10-12, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00160601695701
Unscheduled inspection
Start date: 2016-07-06, end date: 2016-07-08, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 00160601468919
Unscheduled inspection
Start date: 2016-01-25, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 00150600096227
Unscheduled inspection
Start date: 2015-08-24, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparation of electric heat supply organizations for work in the autumn-winter period 20152016
# 742101418313
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101260213
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100543654
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po zdanie kotelnoi: ustroistvu fundamentov (posle zaversheniya rabot), montazhu metallicheskih konstrukcii karkasa, ustroistvu vertikalnyh i gorizontalnyh ograzhdayuschih konstrukcii, ustroistvu finishnogo pola, montazhu vnutrennih sistem ITO, montazhu teplomehanicheskogo oborudovaniya (v processe vypolneniya rabot); zdanie ABK: obschestroitelnym rabotam, montazhu ohranno-pozharnoi signalizacii, montazhu sistem otopleniya i ventilyacii, montazhu vnutrennego elektrosnabzheniya, montazhu vnutrennego vodosnabzheniya i vodootvedeniya (v processe vypolneniya rabot); montazhu rezervuarov i prokladke truboprovodov zapasa vody, ustroistvu molniezaschity i zazemleniya, montazhu dymovyh trub, montazhu KTP, ustroistvu naruzhnyh setei elektrosnabzheniya i seti svyazi (v processe vypolneniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742100850317
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. The line of works on the building of the boiler: installation of metal structures of the frame (after completion), the device vertical and horizontal walling, floor finishing device, the installation ITO, installation of CCTV system, installation of the automation system, internal power supply and outdoor lighting, installation of mechanical equipment (in the process of execution of works); administrative and amenity building: construction works, installation of fire alarm systems, installation of heating systems and ventilation systems, installation of internal power supply, installation of domestic water supply and sanitation (in the process of execution of works); installation of tanks and piping of water supply, the installation of lightning protection and grounding, installation of chimneys, installation of KTP, installation of drainage diesel and treatment plants, device external networks of water supply, Sewerage and sewage pumping system, heat supply, gas supply, electricity and communication networks (the works) and construction materials used in the process of construction, reconstruction of capital construction object, as well as the results of such work requirements approved in accordance with parts 15, 15.2 and 15.3 of article 48 of this Code project documentation (including changes to the project documentation in accordance with paragraphs 3.8 and 3.9 of article 49 of the Code) and (or) information model (in the case that the formation and maintenance of information models are required in accordance with the requirements of this Code), including the requirements for energy efficiency (with the exception of capital construction objects, for which the energy performance requirements do not apply) and the requirements of the equipment of a capital construction object metering devices of energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100405612
Unscheduled inspection
Start date: 2021-08-06, end date: 2021-08-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po zdanie kotelnoi: ustroistvu fundamentov (v processe vypolneniya rabot); zdanie ABK: obschestroitelnym rabotam, montazhu ohranno-pozharnoi signalizacii, montazhu sistem otopleniya i ventilyacii, montazhu vnutrennego elektrosnabzheniya, montazhu vnutrennego vodosnabzheniya i vodootvedeniya (v processe vypolneniya rabot); montazhu rezervuarov i prokladka truboprovodov zapasa vody, ustroistvu molniezaschity i zazemleniya (v processe vypolneniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742100343598
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-07-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po stroitelno-montazhnym rabotam zdaniya kotelnoi, otdelochnym rabotam, stroitelno-montazhnym rabotam zdaniya ABK, ustroistvu setei vnutrennego gazosnabzheniya, setei vnutrennego vodoprovoda i kanalizacii, setei otopleniya i ventilyacii, setei vnutrennego rezervnogo toplivosnabzheniya, ustroistvu ohlazhdayuschego kolodca (v processe vypolneniya rabot), ustanovke kotlov, ustanovke nasosnogo oborudovaniya, ustanovke teploobmennogo oborudovaniya, montazhu rezervuarov zapasa vody, montazhu rezervuarov zapasa dizelnogo topliva i prokladka truboprovodov dizelnogo topliva (v processe vypolneniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742100261174
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Sootvetstvie vypolneniya rabot po podgotovitelnye raboty, raboty po vynosu suschestvuyuschego napornogo kollektora, zemlyanye raboty (posle zaversheniya rabot), stroitelno-montazhnye raboty zdaniya kotelnoi, ustanovka gorelochnyh ustroistv, stroitelno-montazhnye raboty zdaniya ABK (v processe vypolneniya rabot) i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov. 2. Nalichie razresheniya na stroitelstvo. 3. Vypolnenie trebovanii ch.ch. 2,3 i 3.1 st.52 Gradostroitelnogo kodeksa RF.
# 742100299995
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100194471
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed on : preparatory work, work on the removal of the existing pressure collector, excavation work, construction and installation work of the boiler house building (during the work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742004271376
Unscheduled inspection
Start date: 2020-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004223065
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-10, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 595 ot 15012020
# 742004319313
Unscheduled inspection
Start date: 2020-02-27, end date: 2020-02-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 3321 ot 19022020
# 742004306346
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 2442 ot 07022020
# 741904141897
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-25, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of the appeal 24455 dated 17122019
# 741904003670
Unscheduled inspection
Start date: 2019-11-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903948170
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-13, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of the appeal 21424 dated 05112019
# 001903985701
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-21, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya ranee vydannogo predpisaniya ot 21082019 CH3685 srok dlya ispolneniya kotorogo istek Zadachami nastoyaschei proverki yavlyaetsya osuschestvlenie meropriyatii po kontrolyu za ustraneniem narushenii ukazannyh v punktah predpisaniya ot 21082019 CH3685Predmetom nastoyaschei proverki yavlyaetsyavypolnenie predpisanii organov gosudarstvennogo kontrolya nadzora
# 001902938843
Unscheduled inspection
Start date: 2019-08-13, end date: 2019-08-21, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of the order of the Federal Service for Environmental Technological and Nuclear Supervision dated 04072019 262 "On monitoring the progress of preparation of electric Power facilities for operation in the autumn-winter period 2019-2020" issued on the basis of the order of the Government of the Russian Federation dated 18062019 DKP94982 of the Order of the Ural Department of the Federal Service for Environmental Technological and Nuclear Supervision dated 05072019 484 "On the organization of the course of preparation of electric Power Industry entities to work in the autumn-winter period 2019-2020"
# 741902818293
Unscheduled inspection
Start date: 2019-07-08, end date: 2019-07-11, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 1922722338 ot 140521019
# 741902793503
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-01, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 469T ot 07062019
# 741902676736
Unscheduled inspection
Start date: 2019-05-08, end date: 2019-05-14, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 7452 ot 18042019
# 741902651593
Unscheduled inspection
Start date: 2019-04-11, end date: 2019-04-16, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 187305 5729 ot 26122018
# 741902603442
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-03-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 19603 680 ot 21022019
# 741902574798
Unscheduled inspection
Start date: 2019-03-27, end date: 2019-03-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 19101 139 ot 04022019
# 741902510972
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-06, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 1872445652 ot 19122018
# 741902492014
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-21, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 74T 75T 76T 77T ot 28012019
# 741902531140
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-22, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of the appeal 106T from 07022019
# 741902511004
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-02-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 187563 5969 ot 11012019
# 741902456146
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-07, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 187302 5728 ot 26122018
# 741902456125
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-07, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Proverka predpisaniya 187302 5727 ot 26122018
# 741902456134
Unscheduled inspection
Start date: 2019-02-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902456122
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-07, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: PRoverka predpisaniya 187294 5726 ot 26122018
# 741902443170
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-04, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obraschenii 4T 5T 7T ot 09012019
# 741902326059
Unscheduled inspection
Start date: 2019-01-09, end date: 2019-01-11, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 1130T ot 17122018
# 741802280583
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 1080T ot 03122018
# 741802280533
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 20620 1082T 1083T ot 03122018
# 741802280572
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 1081T 1084T ot 03122018
# 741802280530
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 1079T ot 03122018
# 741802221359
Unscheduled inspection
Start date: 2018-12-21, end date: 2018-12-26, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 1085T 1086T ot 03122018
# 741802328146
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-19, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Consideration of the appeal 1076T dated 03122018
# 741802210895
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-19, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya CHelyabinskoi oblasti
Purpose of inspection: Rassmotrenie obrascheniya 19966 ot 22112018
# 001800060679
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-02-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 00170802631695
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of a previously issued prescription
# 00170701823730
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-31, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: ocenka gotovnosti predpriyatii zhilischnokommunalnogo hozyaistva obektov elektroenergetiki i municipalnyh obrazovanii k rabote v osennezimnii period 20172018 godov»
# 74160701021154
Unscheduled inspection
Start date: 2016-10-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160700998262
Unscheduled inspection
Start date: 2016-10-12, end date: 2016-10-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 00160601695701
Unscheduled inspection
Start date: 2016-07-06, end date: 2016-07-08, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 00160601468919
Unscheduled inspection
Start date: 2016-01-25, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment of the points of the previously issued instruction on the elimination of identified violations
# 00150601314860
Unscheduled inspection
Start date: 2015-11-10, end date: 2015-11-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka vypolneniya MUP «Elektroteplovye seti» punktov ranee vydannyh predpisanii ob ustranenii vyyavlennyh narushenii
# 00150600096227
Unscheduled inspection
Start date: 2015-08-24, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the progress of preparation of electric heat supply organizations for work in the autumn-winter period 20152016