# 001902702073
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001802026372
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration: —
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection:
# 542101499858
Unscheduled inspection
Start date: 2021-12-22, end date: —, duration: 10
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: Verification of the execution of the prescription
# 222101300563
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 6
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice of completion of the construction of the capital construction facility dated October 26, 2021 No. 10 (ex. dated October 26, 2021 No. 62/VP/2546)The objectives of this audit are: prevention, detection and suppression of violations of the law on urban planning activities, including the requirements of project documentation; The subject of this audit is: paragraphs 1, 2, 3, 5, Part 3, art. 54 of the Civil Code of the Russian Federation
# 222100531880
Unscheduled inspection
Start date: 2021-08-26, end date: —, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose: verification of the fulfillment of Regulation
No. 5 - GSN dated 07/30/2021, with an expiration date of 08/20/2021
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
The subject of this audit is: paragraphs 1, 2, 3, 5 of Part 3 of art. 54 of the GRK RF
# 222100397042
Unscheduled inspection
Start date: 2021-07-29, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose: to verify the information contained in the notice of completion of the capital construction facility dated 07/26/2021 No. 5 (ex. dated 07/26/2021 No. 62/vp/1748)
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation;
The subject of this audit is: paragraphs 1, 2, 3, 5 of Part 3 of art. 54 of the GRK RF
# 222100137453
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-09, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notice
of elimination of violations dated 03/12/2021 No. 6 (ex. dated 03/15/2021 No. 62/VP/575), specified in the act of inspection of the completed facility dated 02/15/2021 No. 190.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation. The subject of this audit is: paragraphs 1, 2, 3, part 2, art.54 of the GRK RF
# 222100006929
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-15, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notice
on the elimination of violations dated 02/01/2021 No. 5 (ex. dated 02/04/2021 No. 62/VP/248), specified in the act of inspection of the completed facility dated 12/25/2020 No. 183 - GSN.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including the requirements of the project documentation. The subject of this audit is: paragraphs 1, 2, 3 of part 2 of art.54 of the GRK RF
# 222005273143
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222005284389
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222005230914
Unscheduled inspection
Start date: 2020-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222005228877
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 222005245723
Unscheduled inspection
Start date: 2020-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222005243137
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-03, duration: 5
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: verification of the information contained in the notice of completion of the capital construction project dated 1910-2020 bn bx dated 12112020 62VP2533 prevention detection and suppression of violations of the legislation on urban development activities, including the requirements of the project documentation n 1 2 3 ch2 st54 GrK RF
# 222004476388
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-08-17, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notice dated 25102019 1 bx dated 25102019 62VP5788 on the elimination of violations during the construction of a capital construction facility specified in the inspection act dated 13062019 129GSN of the completed reconstruction of a capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including the requirements of project documentation. The subject of this inspection is n 1 2 3 ch2 st54 GrK RF
# 222004342390
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-03-10, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice dated 17012020 1 vx 62VP60 dated 17012020 on the elimination of violations specified in the inspection order dated 28112019 TAA57GSN identified by the inspection of the completed capital construction facility dated 26112019, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation The subject of this audit is p1 p2 p3 ch2 st54 GrK RF verification of compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15152 and 153 of Article 48 of the GrK RF, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with mandatory requirements on the availability of a building permit and the fulfillment of the requirements set out in Parts 2 3 and 31 of Article 52 of the Civil Code of the Russian Federation
# 222004385501
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice dated 23032020 2 vx 62VP593 dated 23032020 on the completion of the stages of work during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of the law on urban development by the person carrying out the construction, including the requirements of the project documentation. The subject of this audit is p1 p2 p3 ch2 st54 GrK RF verification of compliance with works and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Civil Engineering Code of the Russian Federation and the requirements for equipping the capital construction facility with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of Parts 2 3 31 of Article 52 of the Civil Engineering Code of the Russian Federation
# 222004358872
Unscheduled inspection
Start date: 2020-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004303578
Unscheduled inspection
Start date: 2020-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 222004200051
Unscheduled inspection
Start date: 2020-01-16, end date: 2020-01-16, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information specified in Notice 2 dated 30122019 bx 62VP6587 dated 31/122019 on the elimination of violations specified in the act of inspection of the completed facility dated 12/122019
# 221904157018
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-25, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in Notice 7 dated 19122019 bx 62VP6437 dated 19122019 on the elimination of violations specified in the regulation GIA41GSN dated 09102018 identified during the inspection of a completed capital construction facility dated 09102018the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation. The verification is p1 p2 p3 h2 st54 of the Civil Engineering Code of the Russian Federation to verify the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15152 and 153 of Article 48 of the Civil Engineering Code of the Russian Federation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with energy metering devices resources compliance with the mandatory requirements for a building permit and compliance with the requirements set out in Parts 2 3 and 31 of Article 52 of the Civil Code of the Russian Federation
# 001904066646
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-26, duration: —
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: The purpose of implementing measures to monitor and supervise the implementation by the Committee on Road Management, Landscaping and Communications of the city of Barnaul of the previously issued instruction on the elimination of violations of the environmental legislation of the Russian Federation dated 300-52019 053966 in connection with the expiration of the deadline for the execution of the specified instruction on 01/122019 Tasks verification of compliance with the requirements of the environmental legislation of the Russian Federation regarding the protection of aquatic biological resources and their habitat regulations of state control bodies, supervision of municipal control bodies
# 221904095856
Unscheduled inspection
Start date: 2019-12-10, end date: 2019-12-12, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: It is carried out in order to verify the information specified in Notice 2 dated 05/122019 bx 62VP6236 dated 05/122019 on the completion of construction
# 221903990692
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-11-28, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice dated 24102019 1 vh62VP5801 dated 25102019 on the completion of construction
# 221903981666
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-15, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the audit is carried out in order to verify the information specified in Notice 4 dated 28112019 BX 62VP5806 dated 28112019 on the completion dates of the work to be audited. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentation. The subject of this audit is pp 1 ch2 st54 GRK RF checking the compliance of the work and the construction materials used in the process construction, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Articles 48 of the GRK of the Russian Federation for meeting the requirements of Parts 2 3 31 of Article 52 of the GrK of the Russian Federation.
# 221903958256
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-15, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information contained in the notice on the elimination of violations 1 dated 25102019 bx 62VP5788 dated 25102019. The objectives of this audit are to verify the capital construction facility, prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation. The subject of this audit is p1 p2 p3 ch2 st54 GrK RF compliance check the performance of works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the GRK RF, taking into account the changes made to the project documentation in accordance with Parts 38 and 39 of Article 49 of the GrK RF and or the information model if the formation of and the maintenance of the information model is mandatory in accordance with the requirements of the GRK RF the presence of a building permit compliance with the requirements of parts 2 3 31 Art 52 GRK RF
# 221903043888
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-08-30, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: this inspection is carried out in order to verify compliance with the inspection instruction dated 24092018 H31GSNTHE objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentationthe subject of this inspection is pp 1 ch2 st54 GRK RF verification of compliance of the work and the construction materials used during construction, as well as the results of such work with the requirements approved in accordance with Paragraphs 15 152 and 153 of Articles 48 of the GrK RF of the project documentation for meeting the requirements of Paragraphs 2 3 31 of Article 52 of the GrK RF
# 221902973372
Unscheduled inspection
Start date: 2019-08-22, end date: 2019-08-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: this inspection is carried out in order to verify compliance with the inspection instruction dated 24092018 H31GSNTHE objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentationthe subject of this inspection is pp 1 ch2 st54 GRK RF verification of compliance of the work and the construction materials used during construction, as well as the results of such work with the requirements approved in accordance with Paragraphs 15 152 and 153 of Articles 48 of the GrK RF of the project documentation for meeting the requirements of Paragraphs 2 3 31 of Article 52 of the GrK RF
# 221902941826
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-09, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to verify the information contained in the notice dated 25072019 1 vx 62VP4779 dated 31072019 on the elimination of violations specified in the order of the GIA36GSN dated 09072019 identified during the inspection of the completed capital construction facility dated 09072019the objectives of this inspection are to inspect the capital construction facility to prevent identify and suppress violations of legislation on urban development by the developer, including The subject of this audit is p1 p2 p3 h2 st54 of the GRK RF to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15152 and 153 of Article 48 of the GRK RF, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for used energy resources comply with the mandatory requirements for a construction permit and comply with the requirements set out in Parts 2 3 and 31 of Article 52 of the GRK RF
# 221902858121
Unscheduled inspection
Start date: 2019-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221902787871
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 221902772249
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-11, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information contained in the notice of completion of the reconstruction of the capital construction facility 1 dated 03102018 bx 62VP3835 dated 20052019. The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development by the developer, including the requirements of the project documentation. The subject of this audit is p1 ch2 st54 GrK RF checking the compliance of the work and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation
# 001902702073
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-30, duration: —
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: Objectives of the measures for state control supervision of the implementation of the Committee on Road Management, Landscaping, Transport and Communications of the city of Barnaul of the previously issued regulation on the elimination of violations of the environmental legislation of the Russian Federation regarding the protection of aquatic biological resources and their habitat Tasks control supervision of compliance with mandatory requirements of the legislation of the Russian Federation on fisheries and conservation of aquatic biological Resources municipal control bodies
# 221802382567
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-20, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection: The purpose of Executing the instructions of the Head of the Main Department dated 29112018 87172113 issued in accordance with the instructions of the Deputy Chairman of the Government of the Russian Federation YURI Borisov dated 16112018 YUBP47987 tasks prevention detection and suppression of violations by legal entities, their managers and other officials, individual entrepreneurs and their authorized representatives of the requirements of legislation in the field of fire safety, subject to compliance with mandatory fire safety requirements and or fire safety requirements security measures established by municipal legal acts
# 221801914152
Unscheduled inspection
Start date: 2018-10-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221801409886
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-18, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The audit is conducted in order to verify the information contained in Notice 4 dated 24082018 bx 31VP4560 dated 24082018 on the completion dates of works subject to verification during the construction of a capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including the requirements of project documentation. The subject of this audit is ch2 st54 GrK RF checking the compliance of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical regulations on the safety of buildings and structures"
# 221801425677
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-12, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information contained in Notice 3 dated 29082018 bx 31VP4616 dated 29082018 on the elimination of violations identified during the inspection of a completed capital construction facility dated 31072018. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of project documentation. The subject of this audit is h2 st54 The GRK RF checks the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code Russian Federation
# 001802026372
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-22, duration: —
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: Objectives implementation of measures for state control supervision of the implementation by the Committee on Road Management, Landscaping, Transport and Communications of the city of Barnaul of the previously issued instruction on the elimination of environmental legislation of the Russian Federation regarding the protection of aquatic biological resources and their habitat dated 13122017 071711 in connection with the expiration of the specified prescription 01092018 Tasks control supervision of compliance with mandatory requirements of the legislation of the Russian Federation on fishing and conservation of aquatic biological resources The subject is compliance with the regulations of state control bodies, supervision bodies of municipal control
# 001801785672
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-10-22, duration: —
Authority: Verhneobskoe territorialnoe upravlenie Federalnogo agentstva po rybolovstvu
Purpose of inspection: Objectives implementation of measures for state control supervision of the implementation by the Committee on Road Management, Landscaping, Transport and Communications of the city of Barnaul of the previously issued order to eliminate violations of the environmental legislation of the Russian Federation regarding the protection of aquatic biological resources and their habitat dated 13122017 071711 in connection with the expiration of the deadline for the execution of the order on 01092018 tasks control supervision of compliance with mandatory requirements of the legislation of the Russian Federation The Federal Law on Fisheries and Conservation of aquatic biological resources is the subject of compliance with the regulations of state control bodies, supervision bodies of municipal control
# 221801655411
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221800587727
Unscheduled inspection
Start date: 2018-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 221800516249
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-02, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: To establish that this audit is conducted in order to verify the information contained in Notice 2 dated 28042018 bx 31VP2268 dated 03052018 on the elimination of violations identified during the inspection of a completed capital construction facility dated 03042018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 of the GrK of the Russian Federation checking the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009384FZ "Technical Regulations on the Safety of Buildings and Structures
# 221800298494
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-19, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: The purpose of the audit is to verify the information contained in the notice on the elimination of violations 1 dated 02042018 bx 31VP1577 dated 03042018 specified in the act of inspection of the completed facility K17GSN dated 21032018 The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on the Safety of Buildings and Structures"
# 221800249834
Unscheduled inspection
Start date: 2018-03-30, end date: 2018-04-03, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: In order to verify the information contained in Notice 1 dated 15032018 bx 31VP1205 dated 19032018 on the completion of construction, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GRK RF checking the compliance of work and applied building materials during construction and reconstruction the capital construction facility and the results of such work meet the requirements of the technical regulations of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009384FZ "Technical Regulations on the Safety of Buildings and Structures structures
# 221800205327
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-21, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in the notice of completion of construction 1 dated 05032018 bx 31VP1036 dated 06032018, the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, including the requirements of technical regulations and project documentation. The subject of this audit is ch2 st54 GrK RF checking the compliance of work and applied building materials during construction reconstruction of the capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384FZ "Technical Regulations on Safety buildings and structures"
# 22170803027275
Unscheduled inspection
Start date: 2017-12-25, end date: 2017-12-25, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to verify the information contained in Notice 3 dated 20122017 BX 31VP6524 dated 02 0122017 on the completion of construction, the objectives of this audit are to prevent identify and suppress violations of urban planning legislation by the developer, including the requirements of technical regulations and design documentationthe subject of this audit is to verify the compliance of work performed and construction materials used during the construction of a capital construction facility, as well as the results of the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22170802881990
Unscheduled inspection
Start date: 2017-11-22, end date: 2017-11-22, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: in order to implement the inspection program from 17112017, the objectives of this inspection are to prevent, identify and suppress violations of urban planning legislation by the developer, including the requirements of technical regulations and project documentation. The subject of this inspection is ch2 st54 GrK RF to verify the compliance of work performed and construction materials used during the construction of the reconstruction of a capital construction facility, as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation Federal Law No. 30122009 384 FZ "Technical Regulations on the Safety of Buildings and Structures
# 22170802735274
Unscheduled inspection
Start date: 2017-10-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22170701656528
Unscheduled inspection
Start date: 2017-05-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22160701011090
Unscheduled inspection
Start date: 2016-10-14, end date: —, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:
# 22160701046336
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-10-28, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of completion of construction tasks prevention detection and suppression of violations of legislation on urban planning activities the subject is to verify the completed construction of the object, checking the compliance of the work and construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700178793
Unscheduled inspection
Start date: 2016-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22160700710759
Unscheduled inspection
Start date: 2016-09-16, end date: 2016-09-16, duration: —
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during construction tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 22160700061549
Unscheduled inspection
Start date: 2016-08-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 22150601434756
Unscheduled inspection
Start date: 2015-12-16, end date: 2015-12-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection: Execution of the order of the Deputy Chairman of the Government of the Russian Federation DO Rogozin dated 22092015 RDP46456