Found 54 inspections:

# 001902853505
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-05, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections dated 15052019 for the implementation of state planning supervision over the construction of a capital construction facility of the Northeastern Department of Rostechnadzor for 2019. The purpose of this audit is to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility, committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or technical customer Chemical Reagents WarehouseThe subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources.


# 001902478990
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-06, duration:
Authority: Mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Sibiri i Dalnego Vostoka Rostehnadzora
Purpose of inspection: The audit is carried out in order to verify the fulfillment of the previously issued to the audited entity of the instruction dated 10122018 25272018Pr on the elimination of the identified violation, the deadline for which has expired. The purpose of this audit is to assess the completeness of the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements in the field of the use of atomic energy


# 001802218287
Unscheduled inspection
Start date: 2018-11-05, end date: 2018-11-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on Notice 47 on completion of construction dated 01102018 bx 762988 dated 16102018 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility Rudnaya Zona 2 Site 1, which includes facilities in accordance with Annex 1. Compliance of the work and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, equipment requirements Compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, to prevent the occurrence of natural and man-made emergencies, to ensure the safety of the state, to eliminate the consequences of causing such harm


# 001802218231
Unscheduled inspection
Start date: 2018-11-05, end date: 2018-11-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of notice 46 on completion of construction dated 01102018 bx 762989 dated 16102018 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility Ore Zone 1, which includes facilities in accordance with Annex 1 for the project Mining of the Goltsovoye deposit by the underground method project code 25 01 03 001 00 Items Compliance performance of work and applied building materials during construction reconstruction the capital construction facility's design documentation, including energy efficiency requirements, the requirements for equipping the capital construction facility with metering devices for used energy resources, Compliance with the information contained in the notification of the start of certain types of business activities with mandatory requirements, Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, and prevention of the occurrence of emergency situations of a natural and man-made nature To ensure the security of the state To eliminate the consequences of causing such harm


# 00170701774485
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this final audit is to verify the compliance of the constructed capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation. It is carried out on the basis of a notice of completion of construction dated 22052017 42The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to identify violations and deficiencies related to the work performed during the construction of the capital construction facility. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 00170701711434
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this final audit is to verify the compliance of the constructed capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation. It is carried out on the basis of a notice of completion of construction dated 22052017 42The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to identify violations and deficiencies related to the work performed during the construction of the capital construction facility. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 492100458322
Unscheduled inspection
Start date: 2021-08-10, end date: —, duration: 3
Authority: Severo-Vostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is licensing control, in accordance with clauses 2-7 of Article 19 of Federal Law No. 99–FZ dated 05/04/2011 "On Licensing of Certain Types of Activities" (as amended), at hazardous production facilities; The subject of this audit is to verify compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 492100269301
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority: Severo-Vostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492100368334
Unscheduled inspection
Start date: 2021-05-14, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Magadanskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms (49/7-27-19- About from 17.01.2019 by request ) Ensuring the observance and protection of citizens' labor rights and freedoms, including the right to safe working conditions; compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance with mandatory requirements and/or requirements established by municipal legal acts;


# 492105331403
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority: Severo-Vostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492005251924
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority:
Purpose of inspection:


# 492005243251
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492005258134
Unscheduled inspection
Start date: 2020-12-07, end date: 2020-12-11, duration: 5
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the implementation of the previously issued regulation dated 09112020 052272020C based on Notice 1 dated 18112020 on the elimination of capital construction project BX 3905114 dated 30112020the task is to prevent the identification and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and design documentation. documentation for the construction of the capital construction facility "Main ventilation unit Perevalnoye mine Underground mining of reserves of the Perevalnoye deposit Project code 47 01 03 001 00"The subject is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


# 492005202410
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 492005202435
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration:
Authority:
Purpose of inspection:


# 492005202383
Unscheduled inspection
Start date: 2020-11-10, end date: 2020-11-16, duration: 5
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of the notice of completion of construction dated 07102020 1 Bx 3904499 dated 22102020the task is to prevent the identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer violations of legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility "Portal of Ventilation failure 1 gor +9240 m Perevalnoye mine Underground mining of reserves of the Perevalnoye deposit Project code 47 01 03 001 00"The subject is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 492005199688
Unscheduled inspection
Start date: 2020-10-29, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492005177772
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the inspection program from 1709-2020 for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities Tasks prevention detection and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and design documentation during the construction of a capital construction facility works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 492005177770
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-11-09, duration: 20
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose execution of the inspection program from 07092020 for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities Tasks prevention detection and suppression of violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility, committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer. works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 492005177769
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 492005177765
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 492004436765
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-17, duration: 20
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the inspection program from 03062020 for the implementation of state construction supervision over the construction of a capital construction facility of the Northeastern Department of Rostechnadzor for 2020. Tasks are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer, including technical regulations and design documentation during the construction of the facility capital construction "Pressure hydraulic structures of the tailings dam section 2" owned by the Joint-Stock Company "Silver of Magadan"The subject is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used


# 492004436777
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-07-17, duration: 20
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement the inspection program from 03062020 for the implementation of state construction supervision over the construction and reconstruction of capital construction facilities of Rostechnadzor Northeast Directorate for 2020, tasks assessment of compliance of work performed with the requirements of technical regulations, other regulatory legal acts and project documentation review of documents of a legal entity identification of violations during the construction of the capital construction facility "Main Ventilation unit Ore Zone 5"Subject 1 compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and with the requirements for equipping the capital construction facility with metering devices for energy resources used2 availability of a construction permit 3 fulfillment of the requirements established by the Legislation of the Russian Federation. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 491904065870
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-27, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections for the implementation of the state construction supervision for the construction and reconstruction of capital construction facilities of the Northeastern Department of Rostechnadzor for 2019. The objectives of this audit are to assess the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and design documentation, review of documents of a legal entity, identification of violations during the construction of the capital construction facility "Main Ventilation Unit Ore Zone 5" 1 compliance with the work performed and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources 2 availability of a construction permit 3 compliance with the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491904041400
Unscheduled inspection
Start date: 2019-11-06, end date: 2019-11-26, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 2510201953the purpose of this inspection is to prevent identify and suppress violations of urban planning legislation committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or the technical customer. activities including technical regulations and design documentation during the construction of the capital construction facility "Tailings storage of the Lunnoye deposit" of the 1st and 2nd stages of construction, which includes the facilities of Annex 1 owned by the joint-stock company "Serebromagadan"7 The subject of this audit is the materials during the construction of the reconstruction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including energy efficiency requirements with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 the availability of a construction permit3 the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Code of the Russian Federation


# 491903682173
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 491903682152
Unscheduled inspection
Start date: 2019-09-30, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 491903020942
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-23, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out with the aim of monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of design documentation to the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of a notice of completion dated 23072019 01The purpose of this inspection is to prevent identify and suppress violations of legislation on urban development committed by the developer, technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or technical customer, including the number of technical regulations and design documentation for the construction of the capital construction facility "Chemical Reagent Warehouse" owned by the joint-stock company "Silver Magadan"The subject of this audit is1 the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and with the requirements of equipping the capital construction facility with metering devices for the energy resources used


# 001902853505
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-07-05, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to implement the programs of inspections dated 15052019 for the implementation of state planning supervision over the construction of a capital construction facility of the Northeastern Department of Rostechnadzor for 2019. The purpose of this audit is to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation during the construction of a capital construction facility, committed by the developer, the technical customer, as well as by persons engaged in construction on the basis of a contract with the developer or technical customer Chemical Reagents WarehouseThe subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources.


# 491902825523
Unscheduled inspection
Start date: 2019-06-27, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902583051
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-20, duration:
Authority: Upravlenie gosudarstvennogo aviacionnogo nadzora i nadzora za obespecheniem transportnoi bezopasnosti po Dalnevostochnomu federalnomu okrugu Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction of the UGAN NOTB of the Far Eastern Federal District of Rostransnadzor on the elimination of identified violations dated 07122018 TBAT071220181005, which expires on 043002019


# 001902696780
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the implementation of the previously issued order dated January 30, 2019 053022019 L on the elimination of violations of the scheduled inspection Task licensing control in accordance with paragraph 10 of Article 19 of the Federal Law No. 04052011 99 FZ "On licensing of certain types of activities" with amendments at hazardous production facilities Subject to compliance with the regulations of state control bodies supervision of municipal control bodies


# 001902696833
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose control over the implementation of the previously issued instruction dated January 29, 2019 053012019 NH on the elimination of violations of the scheduled inspection Task federal state supervision in the field of industrial safety at the hazardous production facility of the joint Stock company "Silver Magadan" "Fuel and lubricants warehouse with a capacity of 5,000 tons group of tanks and filling devices" hazard class III Subject to compliance with the regulations of the authorities state control supervision of municipal control bodies


# 001902478990
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-06, duration:
Authority: Mezhregionalnoe territorialnoe upravlenie po nadzoru za yadernoi i radiacionnoi bezopasnostyu Sibiri i Dalnego Vostoka Rostehnadzora
Purpose of inspection: The audit is carried out in order to verify the fulfillment of the previously issued to the audited entity of the instruction dated 10122018 25272018Pr on the elimination of the identified violation, the deadline for which has expired. The purpose of this audit is to assess the completeness of the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements in the field of the use of atomic energy


# 001802218287
Unscheduled inspection
Start date: 2018-11-05, end date: 2018-11-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility based on Notice 47 on completion of construction dated 01102018 bx 762988 dated 16102018 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility Rudnaya Zona 2 Site 1, which includes facilities in accordance with Annex 1. Compliance of the work and construction materials used during the construction and reconstruction of the capital construction facility with design documentation, including energy efficiency requirements, equipment requirements Compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, to prevent the occurrence of natural and man-made emergencies, to ensure the safety of the state, to eliminate the consequences of causing such harm


# 001802218231
Unscheduled inspection
Start date: 2018-11-05, end date: 2018-11-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Objectives Monitoring the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation with the requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility on the basis of notice 46 on completion of construction dated 01102018 bx 762989 dated 16102018 Task prevention identification and suppression of violations committed by the developer, the technical customer, as well as by persons carrying out construction on the basis of a contract with the developer or the technical customer violated the legislation on urban development, including technical regulations and design documentation during the construction of the capital construction facility Ore Zone 1, which includes facilities in accordance with Annex 1 for the project Mining of the Goltsovoye deposit by the underground method project code 25 01 03 001 00 Items Compliance performance of work and applied building materials during construction reconstruction the capital construction facility's design documentation, including energy efficiency requirements, the requirements for equipping the capital construction facility with metering devices for used energy resources, Compliance with the information contained in the notification of the start of certain types of business activities with mandatory requirements, Compliance with the instructions of state control bodies, supervision bodies, municipal control bodies, measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, and prevention of the occurrence of emergency situations of a natural and man-made nature To ensure the security of the state To eliminate the consequences of causing such harm


# 491801942181
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-31, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to assess the possibility for the licensee of JSC Silver Magadan to comply with the licensing requirements and conditions when carrying out the licensed type of activity "Production of surveying works" according to the criteria assigned to the licensed types of activities.


# 491801946772
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority: Gosudarstvennaya inspekciya truda v Magadanskoi oblasti
Purpose of inspection:


# 491800301718
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-11, duration:
Authority: Territorialnyi organ Federalnoi sluzhby po nadzoru v sfere zdravoohraneniya po Magadanskoi oblasti
Purpose of inspection: this audit is conducted in order to monitor the implementation of the order of the Territorial Body of Roszdravnadzor in the Magadan region 19 dated 19102017 on the elimination of violations of mandatory requirements, the deadline for which expired 10042018 the objectives of this audit are to assess the completeness and timeliness of the elimination of violations of mandatory requirements specified in regulation 19 dated 19102017 7 The subject of this audit is the measures taken to comply with regulation 19 dated 19102017


# 491800289203
Unscheduled inspection
Start date: 2018-03-06, end date: 2018-04-04, duration:
Authority: Gosudarstvennaya inspekciya truda v Magadanskoi oblasti
Purpose of inspection: Ensuring compliance with and protection of labor rights and freedoms of citizens, including the right to safe working conditions, ensuring compliance by employers with labor legislation and other regulatory legal acts containing labor law norms


# 491801974448
Unscheduled inspection
Start date: 2018-01-18, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701774485
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this final audit is to verify the compliance of the constructed capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation. It is carried out on the basis of a notice of completion of construction dated 22052017 42The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to identify violations and deficiencies related to the work performed during the construction of the capital construction facility. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 00170701711434
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this final audit is to verify the compliance of the constructed capital construction facility with the requirements of technical regulations of other regulatory legal acts and project documentation. It is carried out on the basis of a notice of completion of construction dated 22052017 42The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to assess the compliance of the work performed with the requirements of technical regulations of other regulatory legal acts and project documentation. The purpose of this audit is to identify violations and deficiencies related to the work performed during the construction of the capital construction facility. The purpose of the audit is to comply with mandatory requirements or requirements established by municipal legal acts


# 49170701685532
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-18, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of the possibility for the licensee of JSC "Silver Magadan" to fulfill the licensing requirements and conditions when carrying out the licensed type of activity "Production of surveying works" according to the criteria assigned to the licensed types of activities


# 49170701658568
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-14, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: an unscheduled on-site inspection is carried out as part of the performance of the state function of state construction supervision during the construction of capital construction facilities specified in p 51 st6 of the Urban Planning Code of the Russian Federation, with the exception of those facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registration number of the function 10001515438the final compliance check of the constructed capital construction facility the requirements of technical regulations, other regulatory legal acts and project documentation are carried out on the basis of the notice of completion of construction dated 24042017 41


# 49170701496304
Unscheduled inspection
Start date: 2017-04-10, end date: 2017-04-18, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 5The present inspection is carried out within the framework of the federal state supervision of the safe conduct of work related to the use of subsurface the registration number of the function in the federal state information system "Federal Register of State and Municipal Services of Functions"100015124536 Establish that the present inspection is carried out in order to establish the possibility of carrying out licensing activities attributed by the legislation and regulatory legal acts of the Russian Federation to the competence of Rostechnadzor on the basis of an application for re-registration licenses for the type of activity "Production of surveying works" from the licensee of JSC "Silver Magadan" vx 707 dated 07032017


# 49170701513046
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-10, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to monitor the implementation of regulation 311P2016 issued by 02112016 following a routine audit. The purpose of this audit is to assess the completeness, quality and timeliness of the previously issued regulation 311P2016 from 02112016.


# 49170701439708
Unscheduled inspection
Start date: 2017-03-06, end date: 2017-03-09, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to establish the possibility of carrying out licensing activities attributed by the legislation and regulatory legal acts of the Russian Federation to the competence of Rostechnadzor On the basis of Rostechnadzor letter bx dated 21022017 070003198


# 49170701467250
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-31, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of the Regulation on the regime of permanent supervision at Hazardous Production Facilities


# 49170701414498
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the mandatory requirements for issuing a notice of completion of the construction of the CS facility


# 49170701414320
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-30, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Administrative regulations on the performance by the Federal Service for Environmental Technological and Nuclear Supervision of the state function of federal state construction supervision during the construction and reconstruction of capital construction facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of those facilities in respect of which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities


# 49160701141976
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration:
Authority: SeveroVostochnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 49160701213912
Unscheduled inspection
Start date: 2016-11-15, end date: —, duration:
Authority:
Purpose of inspection:


# 49160701019301
Unscheduled inspection
Start date: 2016-09-26, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.