Found 98 inspections:

# 00150601379498
Unscheduled inspection
Start date: 2015-12-04, end date: 2015-12-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol ranee vydannogo predpisaniya 16518 ot 15062015 g


# 00150600199140
Unscheduled inspection
Start date: 2015-08-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: provedenie meropriyatii po nadzoru za ispolneniem ranee vydannogo predpisaniya 16518 ot 15062015


# 222101400921
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration:
Authority:
Purpose of inspection:


# 222101412322
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 01.07.2021 № 3 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222101509840
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok ot04.08.2020 No 4, po izvescheniyu o srokah zaversheniya rabot ot 20.09.2021 No 16 (vh. ot 20.09.2021 No 62/VP/2197)Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narusheniizakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii;7. Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222101491486
Unscheduled inspection
Start date: 2021-12-20, end date: —, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok ot 04.08.2020 № 4, po izvescheniyu o srokah zaversheniya rabot ot 20.09.2021 № 16 (vh. ot 20.09.2021 № 62/VP/2197) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222101470619
Unscheduled inspection
Start date: 2021-12-15, end date: —, duration: 5
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya s celyu proverki svedenii, soderzhaschihsya v izveschenii ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot 07.12.2021 № 16 (vh. ot 07.12.2021 № 65/VP/2857). Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: pp. 1, 2, 3, 5 ch. 3 st. 54 GrK RF


# 222101402529
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 30.04.2021 № 4, po izvescheniyu o srokah zaversheniya rabot ot 31.08.2021 № 5 (vh. ot 13.09.2021 № 62/VP/2138) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222101402568
Unscheduled inspection
Start date: 2021-11-30, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 23.04.2021 № 3, po izvescheniyu o srokah zaversheniya rabot ot 29.07.2021 № 2 (vh. ot 30.07.2021 № 62/vp/1798) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222101237485
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 222100628091
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel: realizaciya programmy provedeniya proverok ot 19.07.2021 № 7 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222100382794
Unscheduled inspection
Start date: 2021-08-03, end date: —, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 29.01.2020 № 1, po izvescheniyu o srokah zaversheniya rabot ot 25.06.2021 № 4 (vh. ot 25.06.2021 № 62/VP/1484). Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222100485804
Unscheduled inspection
Start date: 2021-08-20, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok ot 25.06.2021 № 3


# 222100362113
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel: realizaciya programmy provedeniya proverok ot 28.05.2021 № 2, po izvescheniyu o srokah zaversheniya rabot ot 25.06.2021 № 2 (vh. ot 28.06.2021 № 62/VP/1481). Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: Predmetom nastoyaschei proverki yavlyaetsya: ch. 3 st. 54 GrK RF


# 222100326713
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 20
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu ocenki sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30.12.2004 № 214-FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i (ili) inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» (dalee – Federalnyi zakon № 214-FZ) i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii, predmetom nastoyaschei proverki yavlyaetsya: soblyudenie obyazatelnyh trebovanii Federalnogo zakona № 214-FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii, zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh licom, osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva, narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva.


# 222100314029
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 29.04.2021 № 2 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100264547
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration: 6
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii, soderzhaschihsya v izveschenii ob okonchanii stroitelstva obekta kapitalnogo stroitelstva ot 31.05.2021 № 19 (vh. ot 31.05.2021 № 62/vp/1255) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 232100222244
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-04-19, duration: 20
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu: ispolneniya programmy provedeniya proverok ot 17 maya 2019 g. (izveschenie ob okonchanii stroitelstva vh. ot 13.05.2021 № 6009). zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom (podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti i proektnoi dokumentacii. Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami.


# 222100246920
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok ot 12.03.2020 № 2 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100192788
Unscheduled inspection
Start date: 2021-04-29, end date: —, duration: 20
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: provoditsya s celyu ocenki sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30.12.2004 № 214-FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i (ili) inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» (dalee – Federalnyi zakon № 214-FZ) i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii, zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh licom, osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva, narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva, predmetom nastoyaschei proverki yavlyaetsya: soblyudenie obyazatelnyh trebovanii Federalnogo zakona № 214-FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii.


# 222100109278
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 16.02.2021 № 1 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100109061
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 07.12.2020 № 1 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100109238
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 16.02.2021 № 1 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100109094
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-07, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 16.02.2021 № 1 Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 232100178350
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-19, duration: 20
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu: ispolneniya programmy provedeniya proverok ot 17 maya 2019 g. (Vnutrennyaya i naruzhnaya otdelka. Inzhenerno-tehnicheskoe obespechenie (vnutrennih i naruzhnyh setei). zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh zastroischikom, tehnicheskim zakazchikom, a takzhe licom, osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom (podryadchik), narushenii zakonodatelstva o gradostroitelnoi deyatelnosti i proektnoi dokumentacii. Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii i (ili) trebovanii, ustanovlennyh municipalnymi pravovymi aktami.


# 222100111914
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-02, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii, soderzhaschihsya v izveschenii ob ustranenii narushenii ot 29.03.2021 № 14 (vh. ot 29.03.2021 № 62/VP/696), ukazannyh v akte proverki zakonchennogo stroitelstvom obekta ot 17.03.2021 № TAA/12-GSN. Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222100049426
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-09, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 13.08.2020 № 10, po izvescheniyu o srokah zaversheniya rabot ot 16.11.2020 № 8 (vh. ot 16.11.2020 № 62/VP/2565) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; 7. Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 232100078985
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration:
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection:


# 222100041478
Unscheduled inspection
Start date: 2021-02-12, end date: —, duration:
Authority:
Purpose of inspection:


# 222105296006
Unscheduled inspection
Start date: 2021-01-11, end date: —, duration:
Authority:
Purpose of inspection:


# 222105327964
Unscheduled inspection
Start date: 2021-01-26, end date: 2021-01-27, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit, chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 25.05.2020 № 1, po izvescheniyu o srokah zaversheniya rabot ot 23.11.2020 № 2 (vh. ot 30.11.2020 № 62/VP/2697) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222105309426
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-01-26, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel: realizacii programmy provedeniya proverok ot 26.10.2020 № 1, po izvescheniyu o srokah zaversheniya rabot ot 13.01.2021 № 1 (vh. ot 13.01.2021 № 62/VP/53) Zadachami nastoyaschei proverki yavlyayutsya: preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti, v tom chisle trebovanii proektnoi dokumentacii; Predmetom nastoyaschei proverki yavlyaetsya: p. 1, 2, 3 ch.2 st.54 GrK RF


# 222005287044
Unscheduled inspection
Start date: 2020-12-23, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 222005268343
Unscheduled inspection
Start date: 2020-12-09, end date: —, duration:
Authority:
Purpose of inspection:


# 222005228991
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-18, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: realizaciya programmy provedeniya proverok ot 27082020 4 po izvescheniyu o srokah zaversheniya rabot ot 01112020 5 vh ot 10112020 625VP2524 preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii p 1 2 3 ch2 st54 GrK RF


# 222005241130
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-26, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 07102020 4 po izvescheniyu o srokah zaversheniya rabot ot 19112020 6 vh ot 19112020 62VP2602Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004499310
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-21, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 12032020 2Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004477615
Unscheduled inspection
Start date: 2020-08-20, end date: 2020-08-24, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izvescheniyah o srokah zaversheniya rabot podlezhaschih proverke ot 29072020 3 vh ot 29072020 62VP1578Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004495428
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-18, duration: 2
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 25052020 1 po izvescheniyu o srokah zaversheniya rabot ot 10082020 1 vh ot 12082020 62VP1752Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004448620
Unscheduled inspection
Start date: 2020-07-29, end date: 2020-07-31, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel realizaciya programmy provedeniya proverok ot 14012019 3Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004447341
Unscheduled inspection
Start date: 2020-07-02, end date: 2020-07-06, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 04102019 3 po izvescheniyu o srokah zaversheniya rabot ot 29062020 8 vh ot 29062020 62VP1327Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004473752
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-07-30, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 25052020 1Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004429451
Unscheduled inspection
Start date: 2020-06-09, end date: 2020-06-11, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 06032020 9 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004427789
Unscheduled inspection
Start date: 2020-06-24, end date: 2020-06-26, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 13012020 1 po izvescheniyu o srokah zaversheniya rabot ot 20042020 4 vh ot 27042020 62VP859 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004444112
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration:
Authority:
Purpose of inspection:


# 222004443139
Unscheduled inspection
Start date: 2020-06-25, end date: 2020-06-25, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii soderzhaschihsya v izveschenii ot 17062020 10 vh ot 18062020 62VP1264 ob ustranenii narushenii ukazannyh v akte proverki zakonchennogo stroitelstvom obekta ot 19052020 1GSNZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004427772
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration:
Authority:
Purpose of inspection:


# 222004427089
Unscheduled inspection
Start date: 2020-06-15, end date: —, duration:
Authority:
Purpose of inspection:


# 222004411057
Unscheduled inspection
Start date: 2020-05-18, end date: 2020-05-20, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 17122019 1 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 232000017520
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-06-16, duration: 20
Authority: Departament po nadzoru v stroitelnoi sfere Krasnodarskogo kraya
Purpose of inspection: cel ispolneniya programmy provedeniya proverok ot ot 17 maya 2019 gzadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim stroitelstvo na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom podryadchik narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle proektnoi dokumentaciiPredmet soblyudenie obyazatelnyh trebovanii i ili trebovanii ustanovlennyh municipalnymi pravovymi aktami


# 222004411127
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-19, duration: 3
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 13012020 1 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p 1 2 3 ch2 st54 GrK RF


# 222004404942
Unscheduled inspection
Start date: 2020-05-15, end date: —, duration:
Authority:
Purpose of inspection:


# 222004223149
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-22, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii o nachale stroitelstva ot 09122019 1 vh ot 09122019 62VP6272 realizacii programmy provedeniya proverok ot 13012020 1


# 221904130329
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 221903903651
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-24, duration: 1
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu realizacii programmy provedeniya proverok ot 12102018 1 proverki svedenii soderzhaschihsya v izvescheniyah ot 26042019 1 vh62VP3617 ot 29042019 ot 10092019 bn vh62VP5354 ot16092019


# 221903931371
Unscheduled inspection
Start date: 2019-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 221903878647
Unscheduled inspection
Start date: 2019-10-18, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 221903434861
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-09-13, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii o srokah zaversheniya rabot podlezhaschih proverki ot 19072019 3 vh ot 23072019 62VP4689Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom Osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s ch 15 152 i 153 st 48 GrK RF proektnoi dokumentacii vypolnenie trebovanii ch 2 3 31 st 52 GrK RF


# 221903291240
Unscheduled inspection
Start date: 2019-09-04, end date: 2019-09-05, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok ot 22102018 1Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya p1 p2 p3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 GrK RF proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov nalichie razresheniya na stroitelstvo vypolnenie trebovanii chastei 2 3 31 st 52 GrK RF


# 221903369565
Unscheduled inspection
Start date: 2019-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 221902776064
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 221902844512
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-06-27, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu proverki svedenii soderzhaschihsya v izveschenii 8 ot 21062019 vh 62VP4308 ot 21062019 ob ustranenii narushenii vyyavlennyh proverkoi zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 11062019Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 221902723871
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-24, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izvescheniyah o srokah zaversheniya rabot podlezhaschih proverki ot 19032019 1 ot 13052019 1 a imenno Vypolnenie rabot po montazhu nulevogo ciklaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom Osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya pp 1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii


# 221902733175
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 221902738515
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-28, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 04042019 vh 62VP3385 ot 08042019 ob ustranenii narushenii ukazannyh v akte proverki ot 28022019 CH08GSN v izveschenii 5 ot 13052019 vh 62VP3745 ot 13052019 o srokah zaversheniya rabot podlezhaschih proverke a imenno vypolnenie rabot po montazhu vozvedeniyu konstrukcii nadzemnoi chastiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya p1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii


# 221902635495
Unscheduled inspection
Start date: 2019-04-08, end date: —, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection:


# 221902611712
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-03-29, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: celyu realizacii programmy provedeniya proverok 1 ot 12102018 v izvescheniyah ot 04022019 1 vh 62VP1000 ot 04022019 ot 03032019 2 vh 62VP2268 ot 06032019 ot 03032019 3 vh 62VP2269 ot 06032019 ot 15032019 4 vh 62VP2829 ot 21032019 o srokah zaversheniya rabot podlezhaschih proverke podgotovka zemelnogo uchastka i zemlyanye raboty raboty po montazhu fundamentov raboty po montazhu konstrukcii podzemnoi chasti zdaniya Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya pp 1 2 3 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii


# 221902485509
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-12, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 18012019 vh 62VP686 ot 28012019 ob ustranenii narushenii ukazannyh v akte proverki zakonchennogo stroitelstvom obekta kapitalnogo stroitelstva ot 17122018 CH43GSN vypolneniya predpisaniya inspekcii ot 17122018 CH43GSN srok dlya ispolneniya kotorogo istek 19012019 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p1 2 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo


# 221902522215
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-19, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izvescheniyah 1 ot 21092018 vh 31VP5032 ot 21092018 2 ot 23112018 vh 31VP6334 ot 23112018 2 ot 04022019 vh 62VP998 ot 04022019 o srokah zaversheniya rabot ustroistvo kotlovana zdaniya zemlyanye raboty ustroistvo fundamentov zdaniya raboty po ustroistvu nulevogo cikla bloka A podlezhaschih proverke Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya pp 1 2 3 ch2 st54 Gradostroitelnogo kodeksa RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF


# 221902524516
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 221902469273
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-04, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 1 ot 24012019 vh 62VP579 ot 24012019 ob ustranenii narushenii pri stroitelstve obekta kapitalnogo stroitelstva vypolneniya predpisaniya inspekcii ot 19122018 CH45GSN srok dlya ispolneniya kotorogo istek 24012019 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii


# 221902505809
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-02-28, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu vypolneniya predpisaniya inspekcii ot 19102018 CH35GSN srok dlya ispolneniya kotorogo istek 24112018 proverki svedenii soderzhaschihsya v izveschenii 1 ot 23112018 vh 31VP6338 ot 23112018 ob ustranenii narushenii ukazannyh v akte proverki ot 19102018 CH35GSN realizacii programmy provedeniya proverok ot 11102018 2 pri stroitelstve obekta kapitalnogo stroitelstva a imenno proverka etapov rabot vypolnenie rabot po ustroistvu naruzhnyh setei inzhenernotehnicheskogo obespecheniya vypolnenie rabot po montazhu vozvedeniyu konstrukcii nadzemnoi chasti vypolnenie rabot po ustroistvu krovli Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya p1 ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii


# 221802290132
Unscheduled inspection
Start date: 2018-12-12, end date: 2018-12-17, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii 2 ot 03122018 vh ot 03122018 31VP6499 ob okonchanii stroitelstva obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF


# 221802325617
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-19, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy provedeniya proverok ot 25092018 1 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 3 31 stati 52 Gradostroitelnogo kodeksa RF


# 221801920182
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-11-02, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu ocenki sootvetstviya deyatelnosti Obschestva obyazatelnym trebovaniyam Federalnogo zakona ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» dalee Federalnyi zakon ot 30122004 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii v svyazi s postupleniem informacii iz informacionnotelekommunikacionnoi seti «Internet» edinaya informacionnaya sistema zhilischnogo stroitelstva dalee EISZHS o faktah narushenii obyazatelnyh trebovanii ustanovlennyh zakonodatelstvom ob uchastii v dolevom stroitelstve zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii Federalnogo zakona ot 30122004 214FZ


# 221801949758
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-19, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu realizacii programmy proverok 1 ot 11012018 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF


# 221800484198
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-21, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu realizacii programmy proverok 1 ot 11012018 proverki vypolneniya predpisaniya inspekcii ot 15022018 CH3GSN srok dlya ispolneniya kotorogo istek 20032018 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009 384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii»


# 221800264136
Unscheduled inspection
Start date: 2018-04-11, end date: 2018-04-11, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: proverka provoditsya s celyu proverki svedenii soderzhaschihsya v izveschenii bn ot 22032018 vh ot 27032018 31VP1376 o srokah zaversheniya rabot podlezhaschih proverke pri stroitelstve obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii


# 221800199567
Unscheduled inspection
Start date: 2018-03-07, end date: —, duration:
Authority:
Purpose of inspection:


# 221800081690
Unscheduled inspection
Start date: 2018-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 221800087151
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-20, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu proverki svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii 2 ot 20122017 vh 31VP6532 ot 20122017 Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya ch2 st54 GrK RF proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF Federalnyi zakon ot 30122009384FZ «Tehnicheskii reglament o bezopasnosti zdanii i sooruzhenii


# 22170802999301
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 22170802872841
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 22170701600209
Unscheduled inspection
Start date: 2017-05-25, end date: —, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection:


# 22170701652842
Unscheduled inspection
Start date: 2017-05-26, end date: 2017-05-26, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii o priostanovlenii stroitelstva zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti predmetom yavlyaetsya proverka zakonchennogo stroitelstvom obekta proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF


# 22170701477965
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-03-28, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: purpose verification of the information contained in the notice of elimination of violations of the task prevention detection and suppression of violations of the legislation on urban development the subject is to verify the completed construction of the object, checking the compliance of the work and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility compliance with the mandatory requirements for the availability of a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 22170701430897
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-04-03, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti Obschestva svyazannoi s privlecheniem denezhnyh sredstv grazhdan dlya celei stroitelstva mnogokvartirnyh domov raspolozhennyh po adresu g Barnaul ul 1905 goda 25 dalee Obekty obyazatelnym trebovaniyam Federalnogo zakona ot 30122004 214FZ «Ob uchastii v dolevom stroitelstve mnogokvartirnyh domov i ili inyh obektov nedvizhimosti i o vnesenii izmenenii v nekotorye zakonodatelnye akty Rossiiskoi Federacii» dalee Federalnyi zakon 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii v svyazi s istecheniem sroka ispolneniya predpisaniya inspekcii ot 01072016 52DS i ne ustraneniem do ego istecheniya narushenii ukazannyh v predpisaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim privlechenie denezhnyh sredstv grazhdan dlya stroitelstva narushenii zakonodatelstva Rossiiskoi Federacii v oblasti dolevogo stroitelstva Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii Federalnogo zakona 214FZ i prinyatyh v sootvetstvii s nim inyh normativnyh pravovyh aktov Rossiiskoi Federacii


# 22170701386725
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-14, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: Cel proverka svedenii soderzhaschihsya v izveschenii o srokah zaversheniya rabot podlezhaschih proverkeZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle trebovanii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF


# 22170701350172
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 22160701211148
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-05, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii ob ustranenii narushenii vyyavlennyh pri provedenii proverki zakonchennogo stroitelstvom obekta zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti predmetom yavlyaetsya proverka zakonchennogo stroitelstvom obekta proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF


# 22160701127795
Unscheduled inspection
Start date: 2016-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 22160701058218
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-10-31, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during construction tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements equipment of the capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 22160700983394
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-06, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose is to verify the information contained in the notice of elimination of violations committed during the construction process tasks prevention detection and suppression of violations of legislation on urban development activities the subject is to verify the completed construction of the facility, to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with the mandatory requirements for a construction permit and the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 22160700120082
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-05, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: cel proverka svedenii soderzhaschihsya v izveschenii o srokah zaversheniya stroitelstva zadachi preduprezhdenie vyyavlenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti predmetom yavlyaetsya proverka zakonchennogo stroitelstvom obekta proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov soblyudenie obyazatelnyh trebovanii o nalichii razresheniya na stroitelstvo i trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa RF


# 22160601787004
Unscheduled inspection
Start date: 2016-08-11, end date: 2016-08-11, duration:
Authority: Inspekciya stroitelnogo i zhilischnogo nadzora Altaiskogo kraya
Purpose of inspection: the purpose of the program of inspections is to prevent identify and suppress violations of legislation on urban development activities the subject is to verify the completed construction of the facility, verify compliance of the work and construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements of equipment of the capital construction facility with metering devices used compliance with the mandatory requirements for a construction permit and the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 22160601484165
Unscheduled inspection
Start date: 2016-02-02, end date: 2016-03-01, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Altaiskomu krayu
Purpose of inspection: kontrol predpisaniya 14110 ot 22012015g


# 00150601379498
Unscheduled inspection
Start date: 2015-12-04, end date: 2015-12-31, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol ranee vydannogo predpisaniya 16518 ot 15062015 g


# 00150600199140
Unscheduled inspection
Start date: 2015-08-03, end date: —, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: provedenie meropriyatii po nadzoru za ispolneniem ranee vydannogo predpisaniya 16518 ot 15062015


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.