Found 131 inspection:

# 742101436300
Unscheduled inspection
Start date: 2021-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742101338819
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed to verify compliance with sanitary and epidemiological requirements and fire safety, landscaping of the territory near the ABC and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742101244601
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101223961
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742101223994
Unscheduled inspection
Start date: 2021-10-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742100771299
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of railway tracks and stations 3,4 stage: installation of trans-shipment railway tracks of station No. 14.15, railway exits, lane R65 M1/7 - 6 pcs., installation of a cul-de-sac No. 2, lane R65 M1/7 - 1 pc. Contact network: the grounding of supports and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, to the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100637967
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 742100384602
Unscheduled inspection
Start date: 2021-08-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100492440
Unscheduled inspection
Start date: 2021-08-26, end date: 2021-09-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the contact network: installation of rigid crossbars, reinforcement of supports with consoles, reinforcement of the bolt with a fixing cable and triangular suspensions, electrical centralization: preparation of the cable route, laying of the floor cable, installation of the cable network and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code, the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100306027
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100278298
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a slag base with a seal according to the project M 32927.01-KZH 15, plumbing work, installation of heating and ventilation in the ABC, finishing work in the ABC, installation of automation of the heat metering unit, heating and ventilation, alarm system in the ABC - during the production process and the construction materials used in the process construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (in the case, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 662100106132
Unscheduled inspection
Start date: 2021-03-11, end date: —, duration: 16
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Proverka ispolneniya predpisaniya ot 02 marta 2020 g №18-CH, vydannyh Uralskim mezhregionalnym upravleniem Rosprirodnadzora


# 742100092714
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of excavation work on a closed equipment warehouse, parking box building, ABC building and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100013307
Unscheduled inspection
Start date: 2021-02-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005212194
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-11-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the railway track laying works Stage I with the installation of pneumatic blowing pipelines stage I with the installation of foundations of contact network supports stage I with the installation of electrical centralization stage I with the construction of the EC post building stage II with the lightning protection and grounding of the EC post stage II with the foundation of the compressor station stage II with the foundation of the diesel generator stage II with the vertical layout of the base for railway tracks Stage III and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005212232
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po proverke soblyudeniya voprosov sanitarnoepidemiologicheskih trebovanii i pozharnoi bezopasnosti i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742005172865
Unscheduled inspection
Start date: 2020-10-15, end date: 2020-10-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya elektromontazhnyh rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 742004484366
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004484387
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-08-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on restoration of reinforced concrete structures installation of metal structures and construction materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004459968
Unscheduled inspection
Start date: 2020-07-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742004460353
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of evacuation exits, the installation of metal structures and building materials used during the construction and reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 742004316619
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the axis 1326 gas pipeline and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation


# 742004380224
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the gallery frame of the tunnel 5 of the overload node 6 of the gallery 6 of the gallery 11 of the overload node 11 of the gallery 13 of the fire barriers of the gallery 8 of the overload node 9 of the gallery 7 of the overload node 7 of the foundations of the aspiration installation of the overload nodes 67911 and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 Articles 48 of the Urban Planning Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities on which energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004179258
Unscheduled inspection
Start date: 2020-01-17, end date: 2020-01-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu gazoprovoda osi 112 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741904097248
Unscheduled inspection
Start date: 2019-12-13, end date: 2019-12-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the mk 1326 axis supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation


# 741903824827
Unscheduled inspection
Start date: 2019-10-11, end date: 2019-10-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu mk opor osi 112 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741903599466
Unscheduled inspection
Start date: 2019-09-24, end date: 2019-09-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka ispolneniya predpisaniya ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva ot 12082019 g2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902961670
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902868717
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the gallery frame of tunnel 5 of the overload node 6 of gallery 6 of gallery 11 of the overload node 11 of gallery 13 of the fire barriers of gallery 8 of the overload node 9 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902868838
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902868799
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-08-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of steel pipelines and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902755445
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the gallery frame of tunnel 5 of the overload node 6 of gallery 6 of gallery 11 of the overload node 11 of gallery 13 of the fire barriers of gallery 8 of the overload node 9 of gallery 7 of the overload node 7 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code the Code of the Russian Federation


# 741902746507
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundations and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902754741
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of wells and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902759866
Unscheduled inspection
Start date: 2019-05-08, end date: 2019-06-06, duration:
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms


# 741902645920
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the installation of wall panels of doors and windows of the electrical equipment of the gallery of tunnel 5 of tunnel 12 of gallery 6791113 of the 67911 transshipment nodes and the construction materials used during the construction of the capital construction facility as well as the results of such work with the design documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902578637
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 741902528038
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902476062
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-02-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu kolodcev i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741902451661
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741802313770
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of steel pipes 4268 PK11PK13 and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741802091277
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741801877155
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 741801918216
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of the installation of electrical equipment of the Overload unit 7 9 and Gallery 7 8 of the Aspiration installation of overload units 79 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801264425
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of metal structures Overload unit 7 9 Gallery 7 8 Aspiration installation of overload units 79 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801548814
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 741800711172
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po blagoustroistvu pridomovoi territorii i ustanovke malyh arhitekturnyh form proverka soblyudeniya voprosov sanitarnoepidemiologicheskih trebovanii i pozharnoi bezopasnosti primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800711103
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po blagoustroistvu pridomovoi territorii i ustanovke malyh arhitekturnyh form proverka soblyudeniya voprosov sanitarnoepidemiologicheskih trebovanii i pozharnoi bezopasnosti primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800629893
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie montazha karkasa zdaniya Uzel peregruzki 7 9 Galereya 7 8 Aspiracionnaya ustanovka uzlov peregruzki79 i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800619388
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of external and internal plumbing and electrical installation systems finishing works of building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800619378
Unscheduled inspection
Start date: 2018-08-22, end date: 2018-08-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of external and internal sanitary and technical electrical installation systems finishing works of building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800630002
Unscheduled inspection
Start date: 2018-08-24, end date: —, duration:
Authority:
Purpose of inspection:


# 741800564384
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya 1Zemlyanyh rabot PK2PK6 2montazha zhb opor PK2PK6 3ustroistva fundamentov PK2PK6 i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800537613
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the frame of the Gallery building Tunnel 5 overload node 6 7 9 11 Gallery 7 8 Aspiration installation of overload nodes 67911 Arrangement of the upper structure of the railway track 12 exhaust dead end 50 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh Articles 23 and 31 of the Urban Planning Code of the Russian Federation


# 741800525652
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800525623
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work with the materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800525543
Unscheduled inspection
Start date: 2018-07-09, end date: —, duration:
Authority:
Purpose of inspection:


# 741800447461
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the foundations of the Gallery Tunnel 5 overload unit 6 7 9 11 Gallery 7 8 Aspiration installation of overload units 67911 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800452651
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-06-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on landscaping of the house territory and installation of small architectural forms verification of compliance with sanitary and epidemiological requirements and fire safety of building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800435682
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work with the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800435637
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of external and internal sanitary and technical electrical systems finishing works of building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800435534
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-07-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of external and internal sanitary and technical electrical networks finishing works of materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800376835
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of external and internal sanitary engineering systems electrical installation work finishing work of building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800376194
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work with the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800357716
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the earthworks with the installation of reinforced concrete supports, the installation of foundations, the installation of mk supports, the installation of steel pipes and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800290016
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the 3rd and 4th floors, external and internal walls, ceilings of materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800280930
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of foundations of gas pipeline supports installation of metal structures of gas pipeline supports installation of gas pipeline assembly of boiler house modules in the design position installation of instrumentation and control equipment and construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800220220
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the foundation structure for railway track 12 and exhaust dead end 50 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800179193
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work with the materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800179030
Unscheduled inspection
Start date: 2018-03-27, end date: 2018-04-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures of the 3rd and 4th floors, external and internal walls, ceilings of building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800165581
Unscheduled inspection
Start date: 2018-03-07, end date: —, duration:
Authority:
Purpose of inspection:


# 741800083444
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka ispolneniya predpisaniya ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva ot 15012018 g so srokom ispolneniya do 15022018 g 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800068705
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu nesuschih konstrukcii cokolnogo etazha 1 i 2 etazha naruzhnye i vnutrennie steny perekrytiya primenyaemyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800068751
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures of the 3rd and 4th floors, external and internal walls, ceilings of building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800068877
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-02-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation work with the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800076671
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration:
Authority:
Purpose of inspection:


# 74180803052069
Unscheduled inspection
Start date: 2018-01-30, end date: 2018-02-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the foundation structure for railway track 12 and exhaust dead end 50 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74180803050340
Unscheduled inspection
Start date: 2018-01-19, end date: —, duration:
Authority:
Purpose of inspection:


# 741800002932
Unscheduled inspection
Start date: 2018-01-24, end date: 2018-02-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya montazha trub stalnyh i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 741800008771
Unscheduled inspection
Start date: 2018-01-26, end date: —, duration:
Authority:
Purpose of inspection:


# 741800008515
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on installation of external and internal sanitary and technical networks of electrical networks and finishing works of construction materials used during the construction of a capital construction facility as well as the results of such works with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74180802990679
Unscheduled inspection
Start date: 2018-01-09, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802967013
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu nesuschih konstrukcii cokolnogo etazha 1 i 2 etazha naruzhnye i vnutrennie steny perekrytiya primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802966333
Unscheduled inspection
Start date: 2017-12-20, end date: 2017-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu krovli primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802935725
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of earthworks, the installation of reinforced concrete supports, the installation of foundations, the dismantling of pipes, the installation of mk supports and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802935868
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The arrangement of the foundation for the railway track 12 and the exhaust dead end 50 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802835369
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-11-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing structures of the 3rd and 4th floors external and internal walls of the overlap of the materials used in the construction process of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802835436
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-11-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the foundation of the materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802728327
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802728178
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work the excavation of the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802727407
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing structures of the 3rd and 4th floors, external and internal walls, ceilings of building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802754367
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of external networks of the naphthalene fraction warehouse and technical naphthalene installation of metal structures and platforms of the naphthalene fraction warehouse installation of supports and pipelines of the naphthalene fraction warehouse installation and strapping of pumps of pipelines of the pumping station installation of the roof of the pumping station building finishing works of ventilation in the pumping station building electrical installation of outdoor lighting of the loading ramp installation of railway tracks paving of the loading ramp installation of metal structures of a fire extinguishing pumping station installation of a roof of a fire extinguishing pumping station installation and strapping of pumps and pipelines of a fire extinguishing pumping station finishing and ventilation of a fire extinguishing pumping station electrical installation of technological equipment for electric heating of pipelines commissioning of a warehouse of naphthalene fraction electrical ventilation automation of fire control systems of a pumping station building commissioning of communication networks water irrigation loading ramp commissioning of electrical automation equipment accounting systems, management of the fire automation system of the fire extinguishing pumping station, verification of compliance with sanitary and epidemiological requirements and fire safety2 Receipt of building permits3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802754214
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170802284036
Unscheduled inspection
Start date: 2017-09-19, end date: 2017-09-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka ispolneniya predpisaniya ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva ot 14082017 g2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802322914
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the frame of reinforced concrete structures with the installation of engineering networks sewerage heating water supply and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802224916
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the foundation during the execution of the work of the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802224620
Unscheduled inspection
Start date: 2017-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802215917
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the ground floor of the 1st and 2nd floors external and internal walls of the ceiling in the process of performing the work of the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802543797
Unscheduled inspection
Start date: 2017-09-22, end date: 2017-09-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the installation of a high-voltage line for fencing access roads, engineering networks for the installation of equipment, landscaping, verification of fire safety requirements during construction and the construction materials used during the construction of a capital construction facility, as well as the results of such work, meets the requirements of technical regulations for project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701855491
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on dismantling the existing wall and developing the foundation for the foundations of the building, the foundation and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701832428
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the foundation during the execution of the work of the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701832147
Unscheduled inspection
Start date: 2017-08-25, end date: 2017-08-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the ground floor of the 1st and 2nd floors external and internal walls of the ceiling in the process of performing the work of the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701832395
Unscheduled inspection
Start date: 2017-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701784518
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work the excavation of the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701784366
Unscheduled inspection
Start date: 2017-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701728436
Unscheduled inspection
Start date: 2017-06-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701653151
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-15, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu oborudovaniya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701622158
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work electrical installation of technological equipment and ventilation commissioning ventilation oxygen control fire automation system of the building flaking naphthalene electrical installation automation of accounting systems for content management video surveillance communication networks water irrigation verification of compliance with sanitary and epidemiological requirements and fire safety after completion of work materials used during the construction of a capital construction facility as well as the results of such work requirements technical regulations and project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 ST52 of the Urban Planning Code of the Russian Federation


# 74170701622217
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work electrical installation work technological equipment electrical heating of pipelines commissioning improvement of the naphthalene fraction warehouse Electrical equipment ventilation automation of fire control systems of the pumping station building commissioning of the communication network water irrigation of the loading ramp commissioning electrical equipment automation of accounting systems for the management of the fire automation system of the pumping station fire extinguishing verification of compliance with sanitary and epidemiological requirements and fire safety after completion of work applied materials during the construction of a capital construction facility, as well as the results of such work to the requirements of technical regulations and project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701487074
Unscheduled inspection
Start date: 2017-04-05, end date: 2017-04-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu vysokovoltnoi linii i inzhenernyh setei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701561006
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701560001
Unscheduled inspection
Start date: 2017-04-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701396910
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu ograzhdayuschih konstrukcii podstancii ustroistvu krovli i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701329233
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of foundations for equipment, the installation of the frame of the 3rd floor roof stairs and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701309107
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka sootvetstviya vypolneniya rabot ustroistvu karkasa zdaniya montazh balok fahverka zdaniya nasosnoi stancii primenyaemyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74170701308563
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work on the manufacture and installation of metal structures, bookcases and construction sites, naphthalene rectification plants, materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701199207
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160701199401
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Proverka sootvetstviya vypolneniya rabot po montazhu karkasa zdaniya cheshuirovaniya naftalina ustroistvo naruzhnyh setei ustanovki rektifikacii naftalina primenyaemyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a tak zhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160701241122
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu karkasa 1 i 2 etazhei perekrytiya 1 i 2 etazhei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160701111396
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of grillings for supports and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701142356
Unscheduled inspection
Start date: 2016-11-28, end date: —, duration:
Authority:
Purpose of inspection:


# 74160701142632
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of compliance of work on the installation of metal structures of bookcases and naphthalene rectification sites of materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701151804
Unscheduled inspection
Start date: 2016-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700992419
Unscheduled inspection
Start date: 2016-10-25, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700992546
Unscheduled inspection
Start date: 2016-10-25, end date: 2016-10-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the compliance of excavation work for the construction of a naphthalene rectification plant, the installation of foundations for a building, the flaking of naphthalene, the materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701034234
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the silo and technological equipment with the verification of fire-fighting sanitary and epidemiological measures, landscaping and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700712011
Unscheduled inspection
Start date: 2016-09-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160700712070
Unscheduled inspection
Start date: 2016-09-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160601775322
Unscheduled inspection
Start date: 2016-08-11, end date: —, duration:
Authority:
Purpose of inspection:


# 74160601795029
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-08-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot ustroistvo fundamenta pod silos montazh metallokonstrukcii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160601788793
Unscheduled inspection
Start date: 2016-08-18, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.