# 342101301507
Unscheduled inspection
Start date: 2021-11-12, end date: 2021-11-23, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the GsK of the Russian Federation and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the GsK of the Russian Federation); b) the requirements for a construction permit; c) the requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; d) the requirements established by part 4 of Article 52 of the GsK of the Russian Federation, to ensure the conservation of a capital construction facility; e) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts.
# 342101393452
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-13, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the GsK RF) (subject to changes made to the project documentation in accordance with Parts 3.8 3.9 of Article 49 of the GsK of the Russian Federation and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the GsK of the Russian Federation); b) the requirements for a construction permit; c) the requirements established by parts 2 and 3.1 of Article 52 of the GsK of the Russian Federation; d) the requirements established by part 4 of Article 52 of the GsK of the Russian Federation, to ensure the conservation of a capital construction facility; e) requirements for the procedure for carrying out construction control established by the GsK of the Russian Federation and other regulatory legal acts.
# 342101294654
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342101100295
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342100641147
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342100449508
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342100332625
Unscheduled inspection
Start date: 2021-07-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342100326378
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342100297654
Unscheduled inspection
Start date: 2021-06-18, end date: —, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: purpose: to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation;
tasks: prevention, detection and suppression of violations of the urban planning legislation of the Russian Federation and project documentation.
subject: compliance with mandatory requirements regarding:
a) compliance of the execution of works and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and requirements for equipping a capital construction facility with metering devices for used energy resources;
b) availability of a building permit;
c) meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342100181520
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-26, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti, osuschestvlyaemoi na Obekte, trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii, zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy, trebovanii pozharnoi bezopasnosti i sanitarno-epidemiologicheskogo blagopoluchiya naseleniya, v tom chisle tehnicheskih reglamentov, i proektnoi dokumentacii;, zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii, v tom chisle tehnicheskih reglamentov, i proektnoi dokumentacii., zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii, v tom chisle tehnicheskih reglamentov, i proektnoi dokumentacii. 7. Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii: a) sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 Gradostroitelnogo Kodeksa RF) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; b) nalichiya razresheniya na stroitelstvo; v) vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa RF.
# 342100212566
Unscheduled inspection
Start date: 2021-05-21, end date: 2021-05-31, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342100172712
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-13, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations, and project documentation; the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation., The subject of this audit is compliance with mandatory requirements regarding: a) compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation); Of the Civil Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices used energy resources; b) availability of a building permit; c) compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342005226613
Unscheduled inspection
Start date: 2020-11-20, end date: 2020-11-30, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342005190864
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-11-03, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmet soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 342005133440
Unscheduled inspection
Start date: 2020-10-02, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 342005128079
Unscheduled inspection
Start date: 2020-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004478297
Unscheduled inspection
Start date: 2020-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004442247
Unscheduled inspection
Start date: 2020-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004438847
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-13, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmet soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 342004451214
Unscheduled inspection
Start date: 2020-07-14, end date: 2020-07-28, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b availability of a construction permit, c compliance with the requirements set out in parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342004451208
Unscheduled inspection
Start date: 2020-07-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004442266
Unscheduled inspection
Start date: 2020-07-10, end date: 2020-07-21, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342004436846
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 342004418950
Unscheduled inspection
Start date: 2020-06-19, end date: 2020-06-30, duration: 8
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmet soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 342004430641
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-23, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii v tom chisle proektnoi dokumentacii zadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii gradostroitelnogo zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentacii predmet soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 342004410378
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-11, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342004410816
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-06-03, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b availability of a construction permit, c compliance with the requirements set out in parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342004408320
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-25, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 342004408375
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-05-28, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b the availability of a construction permit, c the fulfillment of the requirements established by parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 341903988073
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341903672973
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with the works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit, and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341903694261
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with the works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit, and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341903691297
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341903690763
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341903453247
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341903542795
Unscheduled inspection
Start date: 2019-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341902883406
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Zadacha preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmet soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341902882218
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with the works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit, and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902882324
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentationthe task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to the conformity of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation of and the maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, and the availability of a construction permit, and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902902652
Unscheduled inspection
Start date: 2019-08-09, end date: 2019-08-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with the works and construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used, and the availability of a construction permit, and meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902850217
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341902869497
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with construction works, their results, and the construction materials used meet the requirements of the project documentation and the availability of a construction permit and the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341902702206
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with construction works, their results, and the construction materials used meet the requirements of the project documentation and the availability of a construction permit and the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341801967794
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of the project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800651504
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation The subject is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800650961
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800592210
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341800592156
Unscheduled inspection
Start date: 2018-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341800535379
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800550850
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800551080
Unscheduled inspection
Start date: 2018-07-20, end date: 2018-07-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800451675
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800463764
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject of this audit is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800453577
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800453831
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-07-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject of this audit is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800386792
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800320846
Unscheduled inspection
Start date: 2018-05-17, end date: 2018-05-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800293669
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800352159
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-05-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works with their results and applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802789399
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802789252
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation Tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements for a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802789231
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation Tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements for a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802838694
Unscheduled inspection
Start date: 2017-11-17, end date: 2017-11-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802657038
Unscheduled inspection
Start date: 2017-10-05, end date: 2017-10-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802676905
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-16, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c the fulfillment of the requirements established by hh 23 and 31 st 52 of the Urban Planning Code of the Russian Federation
# 34170802701307
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-10-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170802700543
Unscheduled inspection
Start date: 2017-10-10, end date: 2017-10-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170801930185
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170802578190
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170801916043
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170801953478
Unscheduled inspection
Start date: 2017-09-06, end date: 2017-09-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentatioNtasks to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to the conformity of construction works their results and the construction materials used meet the requirements of the technical regulations of the project documentation and the availability of a construction permit and the fulfillment of the established requirements for admission to construction work
# 34170802577845
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170801930176
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170801930163
Unscheduled inspection
Start date: 2017-08-11, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701818193
Unscheduled inspection
Start date: 2017-08-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701818139
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation Legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation
# 34170701818233
Unscheduled inspection
Start date: 2017-08-02, end date: 2017-08-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation Legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation
# 34170701818066
Unscheduled inspection
Start date: 2017-07-31, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701754451
Unscheduled inspection
Start date: 2017-07-05, end date: 2017-07-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation Legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation
# 34170701696392
Unscheduled inspection
Start date: 2017-06-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701677097
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701666808
Unscheduled inspection
Start date: 2017-06-05, end date: 2017-07-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701718021
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701648363
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701648360
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701644480
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation Legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation
# 34170701638924
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701639038
Unscheduled inspection
Start date: 2017-05-26, end date: 2017-06-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701559131
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701490340
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation, assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation Legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation
# 34170701395131
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34170701395056
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160701225835
Unscheduled inspection
Start date: 2016-12-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160701225801
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The subject is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in meeting the established requirements for the Task of preventing identifying and suppressing admitted admissions to construction work The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used, including technical regulations and project documentation, violations of the legislation of the Russian Federation, including technical regulations and project documentation
# 34160701074720
Unscheduled inspection
Start date: 2016-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160701074391
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-11-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160701091701
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii dopuske k vypolneniyu stroitelnyh rabot Zadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmet soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya ustanovlennyh trebovanii o
# 34160701064278
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160701111341
Unscheduled inspection
Start date: 2016-11-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160701111134
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Subject compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation and the availability of a construction permit in compliance with the established requirements for admission to construction work Purpose assessment of compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices used energy resources, including technical regulations and project documentation Tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation
# 34160700951344
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii dopuske k vypolneniyu stroitelnyh rabot Zadachi preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmet soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya ustanovlennyh trebovanii o
# 34160700950970
Unscheduled inspection
Start date: 2016-10-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160700992950
Unscheduled inspection
Start date: 2016-10-11, end date: 2016-10-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160701043291
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-12-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160701043188
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160701043103
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160700949983
Unscheduled inspection
Start date: 2016-10-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160701048272
Unscheduled inspection
Start date: 2016-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160701048241
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-11-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work
# 34160700029436
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601801892
Unscheduled inspection
Start date: 2016-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160700643064
Unscheduled inspection
Start date: 2016-09-08, end date: 2016-09-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160700185224
Unscheduled inspection
Start date: 2016-09-08, end date: 2016-09-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements in the relationship between the compliance of construction works with their results and the applied building materials with the requirements of technical regulations of project documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160700050455
Unscheduled inspection
Start date: 2016-09-06, end date: 2016-09-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601802084
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601802135
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160700590148
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160700046622
Unscheduled inspection
Start date: 2016-08-24, end date: 2016-09-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601745413
Unscheduled inspection
Start date: 2016-08-03, end date: 2016-08-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601745196
Unscheduled inspection
Start date: 2016-08-05, end date: 2016-08-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601737695
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-08-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601737788
Unscheduled inspection
Start date: 2016-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34160601737614
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-08-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601723435
Unscheduled inspection
Start date: 2016-07-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160601727927
Unscheduled inspection
Start date: 2016-07-13, end date: 2016-07-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601726976
Unscheduled inspection
Start date: 2016-07-13, end date: 2016-07-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601714104
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601718107
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-07-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work
# 34160601717993
Unscheduled inspection
Start date: 2016-07-18, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160601685295
Unscheduled inspection
Start date: 2016-06-30, end date: 2016-07-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work