# 001903966303
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The current inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeast part of the Palyanovskaya area of the Krasnoleninsky field" Cipher 18317 Bush of wells 430 construction stage VL 35kV 12 tvr Bush 430 KTPN 1 Bush 430" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations. project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903841634
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 426 Construction stage Entrance to the bush of wells 426" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903369740
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "Bushes wells 428 429 430 Improvement of the exploitation of the North-Eastern part of the Palyanovskaya area of krasnoleninskoye field cipher 18317 Bush wells 429 construction Phase VL 6kV 1 turkest 429КТПН 1 Bush 429" on the basis of notice of completion with the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code
# 001903369821
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "Bushes wells 428 429 430 Improvement of the exploitation of the North-Eastern part of the Palyanovskaya area of krasnoleninskoye field cipher 18317 Bush wells 429 construction Phase VL 6kV 2 turkest 429КТПН 1 Bush 429" on the basis of notice of completion with the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code
# 001903011377
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18317 Bush of wells 430 Construction stage Entrance to the bush of wells 430" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011350
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903011330
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903011416
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18317 Bush of wells 430 Construction stage Oil and gas collecting networks UZ7UZ3" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011392
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902965263
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage 6kV 2 tvr Bush 425 KTPN 1 Bush 425" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965314
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001902965247
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage 6kV 1 tvr Bush 425 KTPN 1 Bush 425" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965297
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 426 Construction stage 6kV 1 tvr Bush 426 KTPN 1 Bush 426" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965282
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18217 Bush of wells 426 Construction stage Oil and gas collection networks K 426 UDR UPSV" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001902965231
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18217 Bush of wells 425 Construction stage Oil and gas collection networks K 425 UZ4" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001902965212
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage Entrance to the bush of wells 425" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903966303
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-12-13, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The current inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeast part of the Palyanovskaya area of the Krasnoleninsky field" Cipher 18317 Bush of wells 430 construction stage VL 35kV 12 tvr Bush 430 KTPN 1 Bush 430" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations. project documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903841634
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 426 Construction stage Entrance to the bush of wells 426" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903369740
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "Bushes wells 428 429 430 Improvement of the exploitation of the North-Eastern part of the Palyanovskaya area of krasnoleninskoye field cipher 18317 Bush wells 429 construction Phase VL 6kV 1 turkest 429КТПН 1 Bush 429" on the basis of notice of completion with the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code
# 001903369821
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-25, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The real test is conducted to check the completed capital construction object "Bushes wells 428 429 430 Improvement of the exploitation of the North-Eastern part of the Palyanovskaya area of krasnoleninskoye field cipher 18317 Bush wells 429 construction Phase VL 6kV 2 turkest 429КТПН 1 Bush 429" on the basis of notice of completion with the purpose of monitoring the compliance of the work performed with the mandatory requirements of technical regulations of other regulatory legal acts of the design documentation requirements on energy saving and increase of energy efficiency in the construction of capital construction object Objectives of this review are to prevent detection and suppression of violations of mandatory requirements of normative documents and legislative acts, the Subject of this review is to match the performance of works and construction materials used in the construction process of reconstruction of capital construction object and the results of such work to the requirements of technical regulations and project documentation including requirements for energy efficiency and the requirements of the equipment of a capital construction object metering devices of energy resources to the presence of a building permit requirements established in parts 2 and 3 3_1 of article 52 of this Code
# 001903011377
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18317 Bush of wells 430 Construction stage Entrance to the bush of wells 430" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011350
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18317 Bush of wells 429 Construction stage Oil and gas collection networks K 429 UZ2" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011330
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18317 Bush of wells 429 Construction stage Entrance to the bush of wells 429" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011416
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18317 Bush of wells 430 Construction stage Oil and gas collecting networks UZ7UZ3" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001903011392
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 428 429 430 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18317 Bush of wells 430 Construction stage Oil and gas collection networks K430UZ7" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements for energy saving and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit , and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001902965263
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage 6kV 2 tvr Bush 425 KTPN 1 Bush 425" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965314
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 426 Construction stage 6kV 2 tvr Bush 426 KTPN 1 Bush 426" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965247
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage 6kV 1 tvr Bush 425 KTPN 1 Bush 425" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965297
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 426 Construction stage 6kV 1 tvr Bush 426 KTPN 1 Bush 426" on the basis of the completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation. including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code.
# 001902965282
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18217 Bush of wells 426 Construction stage Oil and gas collection networks K 426 UDR UPSV" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of project documentation requirements for energy conservation and energy efficiency improvement during the construction of a capital construction facility The objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation including energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001902965231
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky field code 18217 Bush of wells 425 Construction stage Oil and gas collection networks K 425 UZ4" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code
# 001902965212
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-30, duration: —
Authority: SeveroUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the completed construction of the capital construction facility "Bushes of wells 425 426 Development of facilities for the operation of the northeastern part of the Palyanovskaya area of the Krasnoleninsky deposit code 18217 Bush of wells 425 Construction stage Entrance to the bush of wells 425" on the basis of a completion notice in order to monitor the compliance of completed works with the mandatory requirements of technical regulations and other regulatory legal acts of the project documentation requirements in terms of energy conservation and energy efficiency improvement during the construction of a capital construction facility, the objectives of this audit are to prevent identify and suppress violations of mandatory requirements of regulatory documents and legislative acts. The subject of this audit is the compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for used energy resources, the availability of a construction permit, and the fulfillment of the requirements established by Parts 2 3 and 3_1 of Article 52 of this Code